| | | | | | | | | |
FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
05/09/2024 |
141025888 |
01 |
A2 |
J P/E DISAPPROVED |
05/20/2024 |
0058903 PE |
WOLFSON |
|
NOT APPLICABLE
|
|
DIVIDING EXISTING BEDROOM AND LIVING ROOM INTO TWO BEDROOMS. NO CHANGE IN
|
|
Work on Floor(s): 029
|
01/13/2020 |
123824549 |
01 |
A2 |
P APPROVED |
01/14/2020 |
0028644 RA |
SCOTT |
|
NOT APPLICABLE
|
|
FILING ALT.2 TO COMBINE AND RENOVATE TWO ADJACENT APT.8M AND 8N. THE SCOP
|
|
Work on Floor(s): 008
|
01/06/2020 |
140882409 |
01 |
A2 |
X SIGNED OFF |
12/08/2020 |
0027690 RA |
SCHLOMAN |
|
NOT APPLICABLE
|
|
ARCHITECTURAL WORK TO CREATE 2ND BEDROOM. NO CHANGE IN USE, EGRESS OR OCCU
|
|
Work on Floor(s): 019
|
12/16/2019 |
123692744 |
01 |
A2 |
R PERMIT-ENTIRE |
02/11/2020 |
0019064 RA |
KILLCOYN |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO COMBINE APTS. 28B AND 28C PER TPPN 3/97. GENERAL
|
|
Work on Floor(s): 028
|
11/26/2019 |
123696768 |
01 |
A2 |
X SIGNED OFF |
10/07/2020 |
0028557 RA |
GUO |
|
NOT APPLICABLE
|
|
COMBINATION OF APARTMENTS # 3D & 3E UNDER TPPN #3/97. DEMOLITION OF INTERI
|
|
Work on Floor(s): 003
|
08/05/2019 |
140861654 |
01 |
A2 |
X SIGNED OFF |
09/14/2020 |
0027388 RA |
HILL |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APT. 20BC. RENOVATE EXISTING BATHROOM & CLOSETS, C
|
01/02/2019 |
123243775 |
02 |
A2 |
P APPROVED |
02/13/2019 |
|
DEVANNEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 029
|
07/24/2018 |
123290697 |
01 |
A2 |
X SIGNED OFF |
02/19/2019 |
0030182 RA |
DEVANNEY |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO RENOVATE APT. 24J, GENERAL CONSTRUCTION TO RENOVATE
|
|
Work on Floor(s): 024
|
07/18/2018 |
123462868 |
01 |
A2 |
Q PERMIT-PARTIAL |
09/06/2019 |
0037339 RA |
ZAPATA |
|
NOT APPLICABLE
|
|
INTERIOR ALTERATION OF AN EXISTING 2-BEDROOM APARTMENT. PARTITIONS TO BE A
|
|
Work on Floor(s): 023
|
06/25/2018 |
123290704 |
01 |
A2 |
X SIGNED OFF |
12/26/2018 |
0030182 RA |
DEVANNEY |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO RENOVATE APT. 27M. GENERAL CONSTRUCTION TO INCLUDE
|
|
Work on Floor(s): 027
|
06/14/2018 |
123602128 |
02 |
A2 |
R PERMIT-ENTIRE |
09/25/2018 |
0024733 RA |
MANNING |
|
NOT APPLICABLE
|
|
MECHANICAL WORK TO INSTALL AN EXHAUST FAN AND BATHROOM VENT AS PER PLANS F
|
|
Work on Floor(s): 003
|
05/31/2018 |
123568291 |
01 |
A2 |
X SIGNED OFF |
04/16/2019 |
0036223 RA |
BERMAN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATIONS & PLUMBING WORK IN APARTMENT 25A IN 25TH FLOOR. NO CH
|
|
Work on Floor(s): 025
|
05/16/2018 |
123602128 |
01 |
A2 |
R PERMIT-ENTIRE |
09/27/2018 |
0024733 RA |
MANNING |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION MODIFICATIONS AND PLUMBING WORK TO APARTMENT 3A AS PE
|
|
Work on Floor(s): 003
|
03/20/2018 |
140749714 |
01 |
A3 |
X SIGNED OFF |
12/17/2018 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF TIMBER BARRICADES AS PER PLANS. NO CHANGE IN USE, EGRESS O
|
|
Work on Floor(s): OSP
|
02/15/2018 |
122840550 |
02 |
A2 |
P APPROVED |
02/27/2018 |
|
DEVANNEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 025
|
01/25/2018 |
123149173 |
01 |
A2 |
X SIGNED OFF |
10/25/2018 |
0036223 RA |
BERMAN |
|
NOT APPLICABLE
|
|
ARCHITECTURAL RENOVATIONS AND PLUMBING WORK TO CREATE 2ND BEDROOM AND NEW
|
|
Work on Floor(s): 023
|
01/24/2018 |
123243775 |
01 |
A2 |
X SIGNED OFF |
05/29/2019 |
0030182 RA |
DEVANNEY |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO RENOVATE APT. 29P. WORK TO INCLUDE RENOVATE EXISTI
|
|
Work on Floor(s): 029
|
08/14/2017 |
123115734 |
01 |
A2 |
X SIGNED OFF |
01/29/2019 |
0037694 RA |
TANG |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING APARTMENT 25M, MINOR PARTITION WALL; GENER
|
|
Work on Floor(s): 025
|
06/22/2017 |
122840550 |
01 |
A2 |
X SIGNED OFF |
07/18/2018 |
0030182 RA |
DEVANNEY |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO COMBINE APTS. 25B AND 25C, WORK TO INCLUDE REMOVE S
|
|
Work on Floor(s): 025
|
05/19/2017 |
122952527 |
03 |
A2 |
P APPROVED |
06/02/2017 |
|
MARTINOV |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
05/08/2017 |
122962936 |
02 |
A2 |
P APPROVED |
05/24/2017 |
0028317 RA |
KIM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 015
|
02/17/2017 |
122962936 |
01 |
A2 |
X SIGNED OFF |
11/16/2017 |
0028317 RA |
KIM |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATIONS TO EXISTING APARTMENT #15A. WORK TO INCLUDE NON-STRUC
|
|
Work on Floor(s): 015
|
12/26/2016 |
122952527 |
02 |
A2 |
P APPROVED |
01/06/2017 |
|
MARTINOV |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
12/08/2016 |
122952527 |
01 |
A2 |
X SIGNED OFF |
07/26/2017 |
0023948 RA |
MARTINOV |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING OFFICE SPACE #1A. MECHANICAL, PLUMBING,
|
|
Work on Floor(s): 001
|
11/28/2016 |
122859228 |
01 |
A2 |
X SIGNED OFF |
06/22/2018 |
0027853 RA |
SWITZER |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO RENOVATE APT. 2H. GENERAL CONSTRUCTION TO INCLUDE R
|
|
Work on Floor(s): 002
|
10/31/2016 |
122840453 |
01 |
A2 |
Q PERMIT-PARTIAL |
12/07/2016 |
0030182 RA |
DEVANNEY |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO COMBINE APT. 28R & 28S, REMOVE A SECTION OF DEMISIN
|
|
Work on Floor(s): 028
|
10/26/2016 |
121552275 |
02 |
A2 |
P APPROVED |
11/04/2016 |
|
SCORRANO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
08/08/2016 |
122855151 |
01 |
A2 |
X SIGNED OFF |
07/18/2017 |
0036223 RA |
BERMAN |
|
NOT APPLICABLE
|
|
ARCHITECTURAL AND PLUMBING RENOVATIONS PER PLANS FILED. NO CHANGE IN USE,
|
|
Work on Floor(s): 010
|
05/02/2016 |
122576382 |
01 |
A2 |
X SIGNED OFF |
05/05/2017 |
0030182 RA |
DEVANNEY |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO RENOVATE APT. 22R. SCOPE OF WORK IS TO RENOVATE EXI
|
|
Work on Floor(s): 022
|
09/21/2015 |
122531965 |
01 |
A2 |
X SIGNED OFF |
04/25/2016 |
0030718 RA |
HAMILTON |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING MEDICAL OFFICE SUITE INCLUDING THE REMOVAL
|
|
Work on Floor(s): 001
|
11/17/2014 |
122121088 |
02 |
A2 |
P APPROVED |
06/26/2015 |
|
DIPROPER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 024
|
10/24/2014 |
140265816 |
01 |
A2 |
X SIGNED OFF |
10/19/2015 |
0026194 RA |
SUK |
|
NOT APPLICABLE
|
|
INTERIOR DEMOLITION AND GENERAL CONSTRUCTION INCLUDING PLUMBING WORK FOR
|
|
Work on Floor(s): 011
|
09/29/2014 |
140260553 |
01 |
A2 |
D A/P ENTIRE |
09/29/2014 |
0026194 RA |
SUK |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/09/2014 INTERIOR DEMOLITION AND GENERAL CONSTRUCTION INCL
|
09/04/2014 |
122121088 |
01 |
A2 |
X SIGNED OFF |
07/16/2015 |
0031917 RA |
DIPROPER |
|
NOT APPLICABLE
|
|
COMBINING APARTMENTS 24E AND 24D PER TPPN #3/97. REMOVING SECONDARY KITCHE
|
|
Work on Floor(s): 024
|
07/03/2014 |
122055168 |
01 |
A2 |
X SIGNED OFF |
07/15/2015 |
0026066 RA |
REGAN |
|
NOT APPLICABLE
|
|
DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS AND DOORS. INSTALL AN
|
|
Work on Floor(s): 028
|
02/05/2014 |
121907749 |
01 |
A2 |
X SIGNED OFF |
02/23/2015 |
0028452 RA |
LENZI |
|
NOT APPLICABLE
|
|
RENOVATION AND COMBINATION OF EXISTING APARTMENTS 9J & 9K/L ON THE 9TH FLO
|
|
Work on Floor(s): 009
|
01/10/2014 |
121817070 |
02 |
A2 |
P APPROVED |
01/17/2014 |
|
DEUTSCH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
11/25/2013 |
121778889 |
01 |
A2 |
X SIGNED OFF |
08/26/2014 |
0020758 RA |
VELAZQUE |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING APARTMENT WITH MINOR NON-BEARING PARTITIONS, DOORS,
|
|
Work on Floor(s): 020
|
10/21/2013 |
121817070 |
01 |
A2 |
X SIGNED OFF |
10/16/2014 |
0027303 RA |
DEUTSCH |
|
NOT APPLICABLE
|
|
MODIFICATION TO INTERIOR PARTITIONS ALONG WITH RELATED PLUMBING WORK RELAT
|
|
Work on Floor(s): 003
|
09/05/2013 |
121750079 |
01 |
A2 |
X SIGNED OFF |
09/05/2014 |
0027158 RA |
ORENTLIC |
|
NOT APPLICABLE
|
|
ARCHITECTURAL AND PLUMBING RENOVATIONS PER PLANS FILED. NO CHANGE IN USE,
|
|
Work on Floor(s): 015
|