| | | | | | | |
FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
10/04/2018 |
123323448 |
PR |
I LAA SIGNED OFF |
11/07/2018 |
MP 000678 |
RUDERMAN |
|
SUPERSEDING LAA#140540001:IN APARTMENT 22N ON THE 022 FL, IN BATHROOM, REP
|
|
Work on Floor(s): 022
|
01/25/2018 |
140734016 |
PR |
I LAA SIGNED OFF |
09/18/2018 |
MP 000678 |
RUDERMAN |
|
ON THE 5TH FLOOR IN APT 5U REPLACE TUB (1) ON EXIST. ROUGH. REPLACE (1)
|
|
Work on Floor(s): 005
|
10/24/2017 |
140710176 |
PR |
I LAA SIGNED OFF |
12/26/2017 |
MP 001332 |
VAGLICA |
|
BATHTUB TO SHOWER CONVERSATION. DISCONNECT EXISTING TRIP LEVER FROM EXISTI
|
|
Work on Floor(s): 024
|
08/18/2017 |
140683927 |
PR |
I LAA SIGNED OFF |
01/16/2019 |
MP 000678 |
RUDERMAN |
|
ON THE 29TH FLOOR IN APT 29U IN BATHROOM ON EXIST. LOCATION REPLACE TUB WI
|
|
Work on Floor(s): 029
|
06/09/2017 |
140654441 |
PR |
I LAA SIGNED OFF |
01/16/2019 |
MP 000678 |
RUDERMAN |
|
ON THE 9TH FLOOR IN APT 9K IN BATHROOM ON EXIST. LOCATION REPLACE TUB WITH
|
|
Work on Floor(s): 009
|
05/02/2017 |
140636890 |
PR |
I LAA SIGNED OFF |
08/21/2017 |
MP 001672 |
PIKULIN |
|
REPLACE (1) TUB, (1) VANITY SINK, (1) TOILET, (1) KITCHEN SINK AND (1)
|
|
Work on Floor(s): 005
|
08/24/2016 |
140540001 |
PR |
E LAA FILED |
08/24/2016 |
MP 000678 |
RUDERMAN |
|
ON 22ND FLOOR IN APARTMENT 22N IN BATHROOM ON EXIST. ROUGH AT EXIST. LOCA
|
|
Work on Floor(s): 022
|
03/04/2016 |
140465921 |
PR |
I LAA SIGNED OFF |
06/13/2016 |
MP 001332 |
VAGLICA |
|
ON 9TH FLOOR IN APT #9T DIRECT REPLACEMENT OF 3PC BATHROOM (BATHTUB, LAVAT
|
|
Work on Floor(s): 9TH
|
11/16/2015 |
140430335 |
PR |
I LAA SIGNED OFF |
06/21/2016 |
MP 001342 |
DISABATO |
|
IN APARTMENT 6P ON THE 6TH FLOOR CONVERT TUB TO SHOWER ON NEW W/S ROUGH, R
|
|
Work on Floor(s): 006
|
09/03/2015 |
140399030 |
PR |
I LAA SIGNED OFF |
09/29/2015 |
MP 002252 |
DUMITRIU |
|
ON THE 7TH FLOOR IN APT#7R DIRECT REPLACEMENT OF 3PC BATHROOM
|
|
Work on Floor(s): 007
|
08/04/2015 |
140385544 |
PR |
I LAA SIGNED OFF |
02/17/2016 |
MP 001370 |
QUARATIN |
|
CATEGORY 2: REPLACE FIXTURES ON EXISTING ROUGHING. 1- KITCHEN SINK, 1- LAV
|
|
Work on Floor(s): 012
|
06/03/2015 |
140356228 |
PR |
I LAA SIGNED OFF |
08/19/2015 |
MP 001332 |
VAGLICA |
|
IN APT #5D ON THE 5TH FLOOR DIRECT REPLACEMENT OF 2 LAVATORIES, 2 TOILETS,
|
|
Work on Floor(s): 5TH
|
06/02/2015 |
140355871 |
PR |
I LAA SIGNED OFF |
09/30/2015 |
MP 000678 |
RUDERMAN |
|
ON 2ND FLOOR IN APARTMENT 2G/2H IN BATHROOM ON EXISTING ROUGH AT EXISTING
|
|
Work on Floor(s): 002
|
10/13/2014 |
140266824 |
PR |
E LAA FILED |
10/13/2014 |
MP 000678 |
RUDERMAN |
|
ON 15TH FLOOR IN APARTMENT 15K IN BATHROOM ON EXISTING ROUGH AT EXISTING
|
|
Work on Floor(s): 015
|
10/08/2014 |
140265380 |
PR |
E LAA FILED |
10/08/2014 |
MP 000678 |
RUDERMAN |
|
REPLACE TUB
|
05/01/2014 |
140193608 |
PR |
I LAA SIGNED OFF |
09/25/2014 |
MP 002331 |
FILA |
|
REMOVING EXISTING BATHTUB AND REPLACING IT WITH NEW SHOWER. REPLACING SHOW
|
|
Work on Floor(s): 030
|
04/15/2014 |
140186475 |
PR |
I LAA SIGNED OFF |
08/15/2014 |
MP 001170 |
BRABAZON |
|
APPLICATION IS BEING FILED TO REMOVE BATHTUB AND REPLACE WITH SHOWER, ALSO
|
|
Work on Floor(s): 008
|
09/03/2013 |
140112018 |
PR |
E LAA FILED |
09/03/2013 |
MP 001170 |
BRABAZON |
|
APPLICATION IS BEING FILED TO REPLACE SHOWER BODY. TUB, LAVATORY AND WATER
|
|
Work on Floor(s): 008
|
07/10/2012 |
110576412 |
PR |
I LAA SIGNED OFF |
09/13/2012 |
MP 001549 |
DEMARINI |
|
INSTALL (2) 6" WILKINS 375 MEA 699M RPZ DEVICES IN THE CELLAR. CONNECT TO
|
|
Work on Floor(s): CEL
|
11/23/2011 |
140003485 |
PR |
I LAA SIGNED OFF |
03/23/2012 |
MP 000678 |
RUDERMAN |
|
CONVERT EXISTING TUB INTO SHOWER WITH NEW SHOWERBODY
|
03/21/2011 |
110533502 |
PR |
I LAA SIGNED OFF |
05/19/2011 |
MP 001332 |
VAGLICA |
|
IN APT 7L ON THE 7TH FLOOR REPLACE SHOWERBODY TO EXISTING ROUGHING.+
|
|
Work on Floor(s): 007
|
03/14/2011 |
110532656 |
PR |
I LAA SIGNED OFF |
04/02/2012 |
MP 001306 |
GECSEDI |
|
REPLACE THE EXISTING KITCHEN SINK, KITCHEN SINK FAUCET, WATER CLOSET,
|
|
Work on Floor(s): 028
|
02/19/2008 |
103876067 |
PR |
I LAA SIGNED OFF |
09/04/2008 |
MP 001999 |
RIVIECCI |
|
RELOCATE GAS STOVE RESIDENTIAL USING 10 FT OF 3/4" GAS PIPE
|
|
Work on Floor(s): 028
|
11/27/2007 |
103871375 |
PR |
I LAA SIGNED OFF |
12/07/2007 |
MP 001999 |
RIVIECCI |
|
REMOVE EXISTING LAVATORY & W/C. CAP LINES.
|
|
Work on Floor(s): 001
|
01/26/2006 |
102395383 |
PR |
I LAA SIGNED OFF |
08/08/2006 |
MP 001490 |
LOMBARDO |
|
DIRECT REPLACE ON EXISTING ROUGHING 1-TUB,1-BATH SINK, 1-TANK & BOWL.
|
|
Work on Floor(s): 026
|
02/20/1990 |
100017447 |
PR |
I LAA SIGNED OFF |
04/04/1990 |
MP 010387 |
KAY |
|
FURNISH AND INSTALL KITCHEN SINK & FAUCET; INSTALL CUSTOMERS OWN DISHWASHE
|