BIS Menu  |  Applications   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Job Overview
The below job records do not include filings submitted in DOB NOW; use the DOB NOW Public Portal to access DOB NOW records.
 
Page: 1 of 1
Premises: 111 PAYSON AVENUE MANHATTAN BIN: 1065065    Block: 2248    Lot: 9

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
02/04/2020 140874347 02 A2 P APPROVED 11/16/2020 KOENIGSB NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 001 thru 006

10/25/2019 140874347 01 A2 R PERMIT-ENTIRE 11/27/2020 0067415 PE KOENIGSB NOT APPLICABLE
 HEREWITH FILING FOR FACADE RESTORATION AS INDICATED ON PLANS. NO CHANGE TO
 Work on Floor(s): 001 thru 006

10/22/2019 140874338 01 A2 H P/E IN PROCESS 10/22/2019 0067415 PE KOENIGSB NOT APPLICABLE
 JOB WITHDRAWN 10/22/2019 HEREWITH FILING FOR FACADE RESTORATION AS INDICAT
 Work on Floor(s): 001 thru 006

10/22/2019 140874310 01 A2 H P/E IN PROCESS 10/22/2019 0067415 PE KOENIGSB NOT APPLICABLE
 JOB WITHDRAWN 10/22/2019 HEREWITH FILING FOR FACADE RESTORATION AS INDICAT
 Work on Floor(s): 001 thru 006

08/22/2019 140865641 01 A2 H P/E IN PROCESS 08/22/2019 0067415 PE KOENIGSB NOT APPLICABLE
 JOB WITHDRAWN 09/08/2019 EXTERIOR FACADE REPAIR ON FLOORS 001 THRU 006 AND
 Work on Floor(s): 001 thru 006

04/19/2017 122746733 02 A2 P APPROVED 04/28/2017 MARSH NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
03/29/2016 122746733 01 A2 X SIGNED OFF 05/10/2017 0021490 RA MARSH NOT APPLICABLE
 REMOVAL AND INSTALLATION OF NON LOAD-BEARING PARTITIONS AND RELATED FINISH
02/24/2016 122691818 01 A2 X SIGNED OFF 01/19/2017 0037954 RA MANNINO NOT APPLICABLE
 INTERIOR RENOVATION TO INCLUDE REMOVAL OF EXISTING PARTITIONS AND FINISHES
 Work on Floor(s): 001

04/24/2014 140185252 01 A2 X SIGNED OFF 10/29/2014 0087678 PE BAZINI NOT APPLICABLE
 REPLACE OIL BURNER WITH GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. CH
 Work on Floor(s): CEL,ROF

07/17/2012 120742287 03 A2 P APPROVED 09/11/2012 XERAKIAS NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 005

10/26/2011 120816670 02 A2 P APPROVED 03/08/2012 KING, R. NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
10/06/2011 120742287 02 A2 P APPROVED 04/26/2012 XERAKIAS NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 005

09/06/2011 120816670 01 A2 X SIGNED OFF 04/24/2012 0017036 RA KING, R. NOT APPLICABLE
 FILING HEREWITH TO COMBINE APARTMENT #4B AND #4C AS PER TPPN #3/97; NO CHA
06/28/2011 120742287 01 A2 X SIGNED OFF 03/19/2013 0088368 PE XERAKIAS NOT APPLICABLE
 FILING HEREWITH THE COMBINATION OF PATS 5A AND 5B TO INCLUDE GENERAL
 Work on Floor(s): 005

01/25/2005 103775005 03 A2 P APPROVED 02/02/2005 0026808 RA Bruno NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 006

10/18/2004 103775005 02 A2 P APPROVED 10/26/2004 0026808 RA Bruno NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 006

05/18/2004 103775005 01 A2 X SIGNED OFF 06/20/2005 0026808 RA Bruno NOT APPLICABLE
 Filing herewith the combination of Apts 6A and 6B to include general
 Work on Floor(s): 006

04/01/2003 103420219 01 A2 X SIGNED OFF 07/15/2003 0010971 RA Ruderman NOT APPLICABLE
 New cellar floor slab in existing apartment..restore apartment as existing
 Work on Floor(s): CEL



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  Applications