| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 11/29/2018 |
140759169 |
02 |
A2 |
P APPROVED |
11/29/2018 |
|
STRAZHKO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 006
|
| 04/19/2018 |
140759169 |
01 |
A2 |
X SIGNED OFF |
06/24/2019 |
0034627 RA |
STRAZHKO |
|
NOT APPLICABLE
|
|
FILING HEREWITH DRAWINGS TO PERFORM A GAS TEST FOR THIS APPLICATION AS PER
|
|
Work on Floor(s): CEL 001 thru 006
|
| 08/03/2015 |
140384386 |
01 |
A3 |
R PERMIT-ENTIRE |
08/05/2015 |
0085110 PE |
ODIGIE |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD
|
|
Work on Floor(s): OSP
|
| 07/24/2015 |
122481073 |
01 |
A2 |
R PERMIT-ENTIRE |
08/31/2015 |
0012075 RA |
SCHWARZ |
|
NOT APPLICABLE
|
|
REPLACE/REBUILT EXITING PARAPET WALL AND POINTING AS PER PLAN FILED. NO CH
|
|
Work on Floor(s): ROF,006
|
| 09/25/2012 |
121383813 |
01 |
A3 |
R PERMIT-ENTIRE |
09/26/2012 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD ON SHED. NO CHANGE IN USE OCCUPANCY
|
|
Work on Floor(s): OSP
|
| 09/19/2012 |
121384493 |
01 |
A3 |
R PERMIT-ENTIRE |
09/21/2012 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 10/03/2007 |
104918528 |
01 |
A3 |
R PERMIT-ENTIRE |
10/04/2007 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED 50 LINEAR FEET. NO CHANGE IN USE,
|
|
Work on Floor(s): OSP
|
| 09/04/2007 |
104882753 |
01 |
A2 |
R PERMIT-ENTIRE |
10/10/2007 |
0012965 RA |
RYCAR |
|
NOT APPLICABLE
|
|
PARTIAL PARAPET WALL REPLACEMENT AT THE ROOF LEVEL. ALL AS PER PLANS AN
|
|
Work on Floor(s): ROF
|
| 12/09/2002 |
103332001 |
01 |
A3 |
R PERMIT-ENTIRE |
12/18/2002 |
OT |
Hama |
|
NOT APPLICABLE
|
|
erect 40ft of temporary heavy duty sidewalk shed during pointing of facade
|
|
Work on Floor(s): 001
|