 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/26/2025 |
140772019 |
03 |
A2 |
P APPROVED |
03/28/2025 |
|
AREAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP,BAS,CEL
|
| 03/12/2025 |
140772019 |
02 |
A2 |
P APPROVED |
03/17/2025 |
0095847 PE |
AREAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,OSP
|
| 06/05/2018 |
140772019 |
01 |
A2 |
X SIGNED OFF |
11/28/2025 |
0095847 PE |
AREAN |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER (NYC BOILER NO. MD922469-01) WITH BOILER AND
|
|
Work on Floor(s): OSP,BAS,CEL
|
| 08/12/2003 |
103535818 |
01 |
A2 |
X SIGNED OFF |
09/24/2003 |
0012492 RA |
HAMMERMA |
|
NOT APPLICABLE
|
|
NEW GYMNASIUM BOARD FINISHES, CERAMIC TI LE & KITCHEN CABINETS IN APT. 5
|
|
Work on Floor(s): 5
|
| 07/24/2003 |
103522877 |
01 |
A2 |
R PERMIT-ENTIRE |
08/05/2003 |
0020934 RA |
PORTO |
|
NOT APPLICABLE
|
|
APPLICATION FILED TO REPAIR FACADE OF EX ISTING MULTI.STORY BUILDING
|
|
Work on Floor(s): BAS,ROF 001 thru 006
|