 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 09/20/2018 |
140805065 |
PR |
E LAA FILED |
09/20/2018 |
MP 000928 |
LEBOWITS |
|
INSTALL GAS METER AND APPROX 100FT OF 4" GAS PIPING. CONNECT TO EXISTING G
|
|
Work on Floor(s): OSP,CEL
|
| 03/14/2018 |
140748163 |
PR |
I LAA SIGNED OFF |
06/15/2018 |
MP 001220 |
GIULIANT |
|
DUE TO LEAK & GAS SHUT DOWN IN APT #5J ON THE 5TH FLOOR REPLACE METER BAR
|
|
Work on Floor(s): 005
|
| 02/18/2016 |
122307324 |
PR |
I LAA SIGNED OFF |
03/21/2017 |
MP 001220 |
GIULIANT |
|
INSTALL (1) 4" WATTS 909 MEA#145-83-M RPZ ON THE 1ST FLOOR. CONNECT TO EXI
|
|
Work on Floor(s): 001
|
| 11/20/2014 |
121876167 |
PR |
E LAA FILED |
02/17/2015 |
OBI 005353 |
BAUER |
|
CHANGE FUEL GRADE FROEM #6 TO #4. A PRE-HEATER WILL BE REMOVED AND AN ANTI
|
|
Work on Floor(s): CEL
|
| 06/13/2013 |
121644587 |
PR |
E LAA FILED |
06/26/2013 |
MP 000497 |
EHRLICH |
|
ONE NEW RPZ DEVICE TO BE INSTALL ON GROUND FLOOR ON GRADE FOR EXISTING 4"
|
|
Work on Floor(s): CEL,GND
|
| 10/23/2009 |
110488650 |
PR |
I LAA SIGNED OFF |
12/01/2009 |
MP 000579 |
CAIAZZO |
|
REPLACE 50' OF 3" GAS LINE FROM FRONT OF BUILDING TO BOILER ROOM TEST ALL
|
|
Work on Floor(s): SUB,CEL 001 thru 006
|