 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/27/2018 |
123409775 |
01 |
A2 |
X SIGNED OFF |
07/17/2018 |
0061356 PE |
MOORE |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION TO APARTMENT #3A ON THE 3RD FLOOR OF EXISTING
|
|
Work on Floor(s): 003
|
| 09/24/2013 |
121790053 |
01 |
A2 |
R PERMIT-ENTIRE |
12/18/2013 |
0084178 PE |
ALI |
|
NOT APPLICABLE
|
|
REPLACE DETERIORATED OR RUSTY WINDOW LINTELS/SILLS AT FRONT FACADE AND INS
|
|
Work on Floor(s): OSP 001 thru 006
|
| 01/30/2012 |
120931386 |
01 |
A2 |
X SIGNED OFF |
07/05/2013 |
0069428 PE |
KRIGSMAN |
|
NOT APPLICABLE
|
|
BURNER REPLACEMENT AND CONVERSION FROM #6 OIL TO #2 OIL AND NATURAL GAS .
|
|
Work on Floor(s): CEL
|
| 10/22/2007 |
110003317 |
01 |
A3 |
R PERMIT-ENTIRE |
01/12/2010 |
0075376 PE |
SCHERER |
|
NOT APPLICABLE
|
|
INSTALLING TELECOMMUNICATIONS CABINETS ON PROPOSED PLATFORM ON EXISTING
|
|
Work on Floor(s): ROF
|
| 01/31/2005 |
104024459 |
01 |
A2 |
X SIGNED OFF |
08/12/2005 |
0075376 PE |
SCHERER |
|
NOT APPLICABLE
|
|
INSTALLING A TELECOMMUNICATIONS SHELTER WITH HVAC, RELATED DUNNAGE & REL
|
|
Work on Floor(s): ROF
|