 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 11/04/2022 |
141021329 |
01 |
A2 |
X SIGNED OFF |
10/23/2024 |
0021633 RA |
STOUT |
|
NOT APPLICABLE
|
|
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY
|
|
Work on Floor(s): ROF
|
| 12/19/2018 |
123513769 |
01 |
A2 |
X SIGNED OFF |
04/22/2019 |
0074241 PE |
SEEL |
|
NOT APPLICABLE
|
|
SHEETING AND SHORING OF EXISTING RETAINING WALL IN PREPARATION OF REPAIR W
|
|
Work on Floor(s): OSP
|
| 07/31/2018 |
140788324 |
01 |
A3 |
X SIGNED OFF |
01/31/2023 |
0035839 RA |
O'CONNOR |
|
NOT APPLICABLE
|
|
RETAINING WALLS CRACKS TO BE REPAIRED AS PER PLAN .NO CHANGE IN USE OCCUPA
|
|
Work on Floor(s): 001 thru 005
|
| 07/13/2017 |
140576295 |
02 |
A2 |
P APPROVED |
07/27/2017 |
|
ARENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,OSP
|
| 11/16/2016 |
140576295 |
01 |
A2 |
X SIGNED OFF |
12/14/2017 |
0095847 PE |
ARENA |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER (NYC BOILER NO. MD1308-01) WITH BOILER AND G
|
|
Work on Floor(s): CEL,OSP
|
| 09/10/2015 |
140401606 |
01 |
A3 |
R PERMIT-ENTIRE |
09/15/2015 |
0035839 RA |
CONNER |
|
NOT APPLICABLE
|
|
SPOT POINTING , BRICK REPLACEMENT & COPPING STONE AS PER PLAN .NO CHANGE
|
|
Work on Floor(s): 001 thru 005
|
| 08/22/2015 |
140392714 |
01 |
A3 |
R PERMIT-ENTIRE |
08/24/2015 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|