 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/28/2020 |
110065367 |
03 |
A2 |
P APPROVED |
03/16/2020 |
0063923 PE |
MADDEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 005
|
| 12/23/2016 |
140589094 |
01 |
A2 |
R PERMIT-ENTIRE |
12/27/2016 |
0033885 RA |
CHANG |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APT# 4A ON THE 4TH FLOOR. PARTITION AND PLUMBING WO
|
|
Work on Floor(s): 004
|
| 12/07/2015 |
140437604 |
01 |
A2 |
R PERMIT-ENTIRE |
12/09/2015 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER WITH BOILER AND GAS/OIL BURNER. CHANGE GRAD
|
|
Work on Floor(s): CEL
|
| 11/18/2015 |
110065367 |
02 |
A2 |
P APPROVED |
11/20/2015 |
|
STRONG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 005
|
| 12/14/2007 |
110065367 |
01 |
A2 |
R PERMIT-ENTIRE |
11/21/2017 |
0063923 PE |
MADDEN |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR RENOVATION OF ALL APTS IN BUILDING. MINOR DEMOLITION, MI
|
|
Work on Floor(s): 001 thru 005
|
| 07/22/1997 |
101556870 |
01 |
A2 |
X SIGNED OFF |
12/01/1998 |
0045488 PE |
GRYNBAL |
|
NOT APPLICABLE
|
|
REPLACE OIL FIRED BOILER USING EXISTING BURNER IN EXISTING BOILER ROOM
|
|
Work on Floor(s): CEL
|