| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/28/2022 |
140943638 |
02 |
A2 |
P APPROVED |
04/17/2022 |
|
LUK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 02/04/2022 |
140851950 |
03 |
A2 |
P APPROVED |
03/29/2022 |
|
HARRIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF
|
| 10/25/2021 |
140851969 |
05 |
A2 |
P APPROVED |
11/04/2021 |
|
ROSENTHA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 07/15/2021 |
140851969 |
04 |
A2 |
P APPROVED |
07/29/2021 |
|
ROSENTHA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 01/15/2021 |
140851969 |
03 |
A2 |
P APPROVED |
02/05/2021 |
|
ROSENTHA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 GENERAL CONSTRUCTION WORK, CHANGE OF USE ON
|
|
Work on Floor(s): CEL
|
| 01/05/2021 |
140851969 |
02 |
A2 |
P APPROVED |
01/08/2021 |
|
ROSENTHA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 09/22/2020 |
140955740 |
01 |
A2 |
X SIGNED OFF |
01/18/2022 |
0079468 PE |
LUK |
|
NOT APPLICABLE
|
|
PROPOSE STRUCTURAL WORK TO REINFORCE EXISTING ROOF FRAMING WORK FOR HANDRA
|
|
Work on Floor(s): ROF
|
| 09/08/2020 |
140943638 |
01 |
A2 |
X SIGNED OFF |
04/21/2022 |
0079468 PE |
LUK |
|
NOT APPLICABLE
|
|
PROPOSE STRUCTURAL WORK TO REPLACE EXISTING RAMP AND INSTALL NEW STAIR AT
|
|
Work on Floor(s): OSP
|
| 08/12/2020 |
121208567 |
01 |
A1 |
X SIGNED OFF |
10/12/2022 |
0026814 RA |
HARRIS |
|
NOT APPLICABLE
|
|
PROPOSE MINOR INTERIOR PARTITION AND FINISH WORKS AT CELLAR FLOOR OF EXIST
|
|
Work on Floor(s): CEL,ROF
|
| 07/08/2020 |
140922795 |
01 |
A2 |
X SIGNED OFF |
03/18/2021 |
0066182 PE |
PACIFICO |
|
NOT APPLICABLE
|
|
INSTALLATION OF SOLAR ENERGY SYSTEM ON ROOF. NO CHANGE OF USE, EGRESS, OR
|
|
Work on Floor(s): ROF,CEL
|
| 01/07/2020 |
140851950 |
02 |
A2 |
P APPROVED |
02/13/2020 |
|
HARRIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF
|
| 05/31/2019 |
140851969 |
01 |
A2 |
X SIGNED OFF |
01/18/2022 |
0065567 PE |
ROSENTHA |
|
NOT APPLICABLE
|
|
PROPOSE BOILER INSTALLATION AT CELLAR AS PER PLAN. NO CHANGE IN USE, EGRES
|
|
Work on Floor(s): CEL
|
| 05/31/2019 |
140851950 |
01 |
A2 |
X SIGNED OFF |
04/26/2022 |
0026814 RA |
HARRIS |
|
NOT APPLICABLE
|
|
PROPOSE TO REPAIR AND SEAL ALL EXTERIOR MASONRY WALLS AND ERECT NEW FIRE
|
|
Work on Floor(s): CEL,ROF
|
| 12/15/1994 |
100961666 |
01 |
A2 |
R PERMIT-ENTIRE |
12/27/1994 |
0045488 PE |
CRYNBAL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/01/2021 REPLACE OIL FIRED BOILER AND BURNER IN EXISTING B
|
|
Work on Floor(s): CEL
|
| 10/07/1994 |
100870997 |
02 |
A2 |
P APPROVED |
10/07/1994 |
0018844 RA |
CLEMENTS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): C, 1, 2, 3, 4, 5
|
| 09/19/1994 |
100897889 |
01 |
A2 |
X SIGNED OFF |
08/21/1996 |
0018844 RA |
CLEMENTS |
|
NOT APPLICABLE
|
|
REPLACE PL FIXTURES & INSTALL NEW FIXTUR ES INSTALL 2 HOT WATER HEATERS
|
|
Work on Floor(s): CEL 001 thru 006
|
| 07/06/1994 |
100870997 |
01 |
A2 |
X SIGNED OFF |
06/19/1996 |
0018844 RA |
CLEMENTS |
|
NOT APPLICABLE
|
|
JOIST REPLACEMENT, PLUMBING FIXTURE RELO CATED TO EXISTING LINES, NO CHA
|
|
Work on Floor(s): C, 1, 2, 3, 4, 5
|
| 06/24/1993 |
100644796 |
01 |
A2 |
P APPROVED |
07/07/1993 |
0020723 RA |
WINSTON |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/29/2021 REPAIR EXISTING INTERIOR STAIR ON 4,5 & 6 FLOORS.
|
|
Work on Floor(s): 4, 5, 6
|
| 04/27/1992 |
100403993 |
01 |
A2 |
Q PERMIT-PARTIAL |
05/06/1992 |
0051414 PE |
AGUIRRE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/01/2022 RENOVATION OF INTERIOR OF APARTMENTS 3 AND 7 AS F
|
|
Work on Floor(s): 1, CEL
|