 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/30/2021 |
141003526 |
01 |
A2 |
X SIGNED OFF |
12/27/2022 |
0089068 PE |
MAHANGU |
|
NOT APPLICABLE
|
|
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY
|
|
Work on Floor(s): ROF
|
| 02/01/2021 |
123853598 |
02 |
A2 |
P APPROVED |
02/03/2021 |
|
SALAMON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 006
|
| 12/18/2020 |
121205141 |
02 |
A1 |
P APPROVED |
12/30/2020 |
|
AKERMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
| 04/16/2019 |
121205141 |
01 |
A1 |
R PERMIT-ENTIRE |
01/16/2020 |
0039316 RA |
AKERMAN |
Y |
NOT APPLICABLE
|
|
INTERIOR RENOVATION AT PARTIAL 3RD FLOOR SUBDIVIDING EXISTING APT #32 INTO
|
|
Work on Floor(s): 003
|
| 03/01/2019 |
123853598 |
01 |
A2 |
X SIGNED OFF |
02/10/2021 |
0060930 PE |
SALAMON |
|
NOT APPLICABLE
|
|
FACADE REPAIR
|
|
Work on Floor(s): 001 thru 006
|
| 09/27/2017 |
140699466 |
01 |
A2 |
X SIGNED OFF |
09/16/2019 |
0039316 RA |
AKERMAN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AS PER PLANS FILED HEREWITH.
|
|
Work on Floor(s): CEL
|
| 07/22/2015 |
140379187 |
01 |
A2 |
R PERMIT-ENTIRE |
07/27/2015 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REPLACE LOW PRESSURE BOILER AND GAS/OIL BURNER AS PER PLANS. INSTALL NEW
|
|
Work on Floor(s): CEL
|
| 06/25/2015 |
140366379 |
01 |
A3 |
R PERMIT-ENTIRE |
06/26/2015 |
0085110 PE |
ODIGIE |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD
|
|
Work on Floor(s): OSP
|
| 06/24/2015 |
140366351 |
01 |
A3 |
H P/E IN PROCESS |
06/24/2015 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 08/23/2015 PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED
|
|
Work on Floor(s): OSP
|
| 02/04/2014 |
120958366 |
03 |
A2 |
P APPROVED |
02/07/2014 |
|
SYED-NAQ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 006
|
| 04/09/2013 |
120958366 |
02 |
A2 |
P APPROVED |
04/10/2013 |
|
SYED-NAQ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 006
|
| 01/24/2012 |
120958366 |
01 |
A2 |
Q PERMIT-PARTIAL |
05/26/2015 |
0080123 PE |
SYED-NAQ |
Y |
NOT APPLICABLE
|
|
PROPOSED INTERIOR COSMETIC RENOVATION WORK OF ALL APARTMENTS IN BUILDING.
|
|
Work on Floor(s): 001 thru 006
|