| | | | | | | | | |
FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
07/12/2016 |
140517242 |
01 |
A2 |
R PERMIT-ENTIRE |
10/27/2016 |
0016076 RA |
STRONG |
|
NOT APPLICABLE
|
|
PROPOSED PARTIALLY SISTER OF FLOOR JOISTS TO A-LINE VACANT APARTMENTS, PAR
|
|
Work on Floor(s): 001 thru 006
|
06/28/2016 |
140374618 |
03 |
A2 |
P APPROVED |
07/07/2016 |
|
STRONG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 NEW DESCRIPTION: PROPOSED GUT RENOVATION TO
|
|
Work on Floor(s): 001 thru 006
|
02/01/2016 |
140374618 |
02 |
A2 |
P APPROVED |
02/02/2016 |
|
STRONG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 PROPOSEDCOSMETIC RENOVATION TO VACANT APART
|
|
Work on Floor(s): 001 thru 006
|
02/01/2016 |
140405130 |
02 |
A2 |
P APPROVED |
02/02/2016 |
|
STRONG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 PROPOSED TO PARTIALLY SISTER FLOOR JOISTS T
|
|
Work on Floor(s): BAS 001 thru 006
|
01/20/2016 |
140450937 |
01 |
A2 |
R PERMIT-ENTIRE |
10/27/2016 |
0016076 RA |
STRONG |
|
NOT APPLICABLE
|
|
PROPOSED TENANT PROTECTION PLANS. FILED IN CONJUNCTION WITH 140405130. NO
|
|
Work on Floor(s): 001 thru 006
|
09/21/2015 |
140405130 |
01 |
A2 |
R PERMIT-ENTIRE |
10/27/2016 |
0016076 RA |
STRONG |
|
NOT APPLICABLE
|
|
PROPOSED TO PARTIALLY SISTER FLOOR JOISTS TO C-LINE AND D-LINE VACANT
|
|
Work on Floor(s): BAS 001 thru 006
|
08/24/2015 |
140393937 |
01 |
A3 |
R PERMIT-ENTIRE |
09/16/2015 |
0080350 PE |
SOLTANIZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
07/13/2015 |
140374618 |
01 |
A2 |
R PERMIT-ENTIRE |
02/01/2017 |
0016076 RA |
STRONG |
|
NOT APPLICABLE
|
|
NEW DESCRIPTION: PROPOSED GUT RENOVATION TO VACANT APARTMENTS ON ALL FLOOR
|
|
Work on Floor(s): 001 thru 006
|
06/02/2015 |
122421469 |
01 |
A2 |
R PERMIT-ENTIRE |
07/23/2015 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
PROPOSED PARTIAL DEMOLITION AND ERECTION OF WOOD STUDS THROUGHOUT APARTMEN
|
|
Work on Floor(s): 001
|
06/09/2009 |
120037450 |
02 |
A2 |
P APPROVED |
06/11/2009 |
|
WHYTE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 AT APT #5A,2C & 2D REPLACE BATHROOM FIXTURE
|
|
Work on Floor(s): 001 thru 006
|
05/14/2009 |
120037450 |
01 |
A2 |
R PERMIT-ENTIRE |
05/27/2009 |
0024077 RA |
WHYTE |
|
NOT APPLICABLE
|
|
AT APT #5A,2C & 2D REPLACE BATHROOM FIXTURES INSTALL NEW COOPER WATER LINE
|
|
Work on Floor(s): 001 thru 006
|
01/20/2009 |
110161645 |
02 |
A2 |
P APPROVED |
01/21/2009 |
|
WHYTE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 AT APARTMENTS #1B,1C,1D,2C,2D,4C,4D, 5A, 5B
|
|
Work on Floor(s): 1 thru 6
|
05/07/2008 |
110161645 |
01 |
A2 |
X SIGNED OFF |
11/30/2010 |
0024077 RA |
WHYTE |
|
NOT APPLICABLE
|
|
AT APARTMENTS #1B,1C,1D,2C,2D,4C,4D, 5A, 5B & 6D PROPOSED INTERIOR RENOVAT
|
|
Work on Floor(s): 1 thru 6
|
10/12/2007 |
104925379 |
01 |
A2 |
Q PERMIT-PARTIAL |
11/29/2007 |
0058090 PE |
Wai |
|
NOT APPLICABLE
|
|
Interior renovation with installation of partition wall, refinish floor an
|
|
Work on Floor(s): 002
|