| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/27/2022 |
141008282 |
01 |
A2 |
X SIGNED OFF |
02/23/2023 |
0089068 PE |
MAHANGU |
|
NOT APPLICABLE
|
|
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY
|
|
Work on Floor(s): ROF
|
| 11/13/2020 |
103333064 |
03 |
A2 |
P APPROVED |
12/02/2020 |
|
PEROTTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 10/27/2020 |
103333064 |
02 |
A2 |
P APPROVED |
10/29/2020 |
0078515 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 10/08/2020 |
121472717 |
02 |
A2 |
P APPROVED |
10/09/2020 |
|
HAMMOND |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 09/04/2020 |
120736089 |
02 |
A2 |
P APPROVED |
10/14/2020 |
|
RIEPER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 09/04/2020 |
121415860 |
04 |
A2 |
P APPROVED |
10/14/2020 |
|
RIEPER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 08/17/2020 |
104453191 |
02 |
A3 |
P APPROVED |
08/18/2020 |
# |
Hama |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 01/09/2019 |
140826186 |
01 |
A2 |
P APPROVED |
01/09/2019 |
0035832 RA |
VOLQUEZ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/04/2021 LEGALIZE BATHROOM PLUMBING FIXTURES IN EXISTING C
|
|
Work on Floor(s): 002
|
| 09/13/2017 |
122718210 |
02 |
A2 |
P APPROVED |
09/20/2017 |
|
CHO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 05/05/2017 |
122718210 |
01 |
A2 |
X SIGNED OFF |
12/06/2017 |
0033526 RA |
CHO |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION APT2W. REMOVE AND CONSTRUCT OF NON BEARING OR NON STRU
|
|
Work on Floor(s): 002
|
| 03/18/2013 |
121415860 |
03 |
A2 |
P APPROVED |
03/20/2013 |
|
RIEPER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 02/14/2013 |
121415860 |
02 |
A2 |
P APPROVED |
03/06/2013 |
|
RIEPER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 12/28/2012 |
121472717 |
01 |
A2 |
X SIGNED OFF |
10/14/2020 |
0019548 RA |
HAMMOND |
|
NOT APPLICABLE
|
|
FILING TO INSTALL NEW FIRE SUPPRESSION SYSTEM. GAS SHUT OFF VALVE FILED UN
|
|
Work on Floor(s): 001
|
| 10/18/2012 |
121415860 |
01 |
A2 |
X SIGNED OFF |
10/23/2020 |
0013294 RA |
RIEPER |
|
NOT APPLICABLE
|
|
PROPOSED STORE USE GROUP 6 RENOVATION. COOKING EQUIPMENTS AND REFRIGERATIO
|
|
Work on Floor(s): 001
|
| 06/24/2011 |
120736089 |
01 |
A2 |
X SIGNED OFF |
10/23/2020 |
0013294 RA |
RIEPER |
|
NOT APPLICABLE
|
|
INSTALL DELI/GROCERY STORE AND MINOR INTERIOR RENOVATION AS PER PLAN SUBMI
|
|
Work on Floor(s): BAS
|
| 08/02/2006 |
104507339 |
01 |
A2 |
X SIGNED OFF |
10/21/2009 |
0071977 PE |
Boccia |
|
NOT APPLICABLE
|
|
Miscellaneous roof and facade repairs as shown on drawings: repair existin
|
|
Work on Floor(s): ROF 001 thru 005
|
| 06/13/2006 |
104453191 |
01 |
A3 |
X SIGNED OFF |
08/21/2020 |
# OT |
Hama |
|
NOT APPLICABLE
|
|
Erect 146' of Temporary Heavy Duty Sidewalk Shed 300 psf 8' high for repa
|
|
Work on Floor(s): 001
|
| 02/13/2004 |
103707115 |
01 |
A2 |
X SIGNED OFF |
03/22/2004 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER (NYC BOILE R NO. MD921851-01) AND CHANGE G
|
|
Work on Floor(s): CEL
|
| 12/17/2002 |
103333064 |
01 |
A2 |
X SIGNED OFF |
12/22/2020 |
0078515 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
PROPOSE TO RENOVATE EXIST. BAS. APT., REPLACE BATH AND KIT. FIXTURES
|
|
Work on Floor(s): BAS
|