| | | | | | | | | |
FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
02/29/2016 |
121802102 |
06 |
A1 |
P APPROVED |
03/07/2016 |
|
GEE |
|
GRANTED 07/28/2014
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,CEL 001 thru 003
|
02/04/2016 |
121802102 |
05 |
A1 |
P APPROVED |
02/12/2016 |
|
GEE |
|
GRANTED 07/28/2014
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,CEL 001 thru 003
|
10/21/2015 |
121802102 |
04 |
A1 |
P APPROVED |
11/02/2015 |
|
GEE |
|
GRANTED 07/28/2014
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,CEL 001 thru 003
|
07/27/2015 |
140381566 |
01 |
A3 |
X SIGNED OFF |
11/25/2015 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS.
|
|
Work on Floor(s): OSP
|
07/27/2015 |
140381548 |
01 |
A3 |
X SIGNED OFF |
11/25/2015 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
03/03/2015 |
121802102 |
03 |
A1 |
D A/P ENTIRE |
07/14/2015 |
|
GEE |
|
GRANTED 07/28/2014
|
|
DOC WITHDRAWN 07/17/2015
|
|
Work on Floor(s): BAS,CEL,PEN 001 thru 003
|
07/25/2014 |
140211376 |
01 |
A2 |
X SIGNED OFF |
01/06/2016 |
0083436 PE |
CHRISTIA |
|
NOT APPLICABLE
|
|
SRPINKLER WORK APPLICATION FILED IN CONJUNCTION WITH ALTERATION JOB#121802
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
06/26/2014 |
121802102 |
02 |
A1 |
X SIGNED OFF |
04/04/2016 |
0085603 PE |
MONT |
|
GRANTED 07/28/2014
|
|
HEREWITH FILING STRUCTURAL PLANS
|
|
Work on Floor(s): BAS,CEL 001 thru 003
|
10/11/2013 |
121802102 |
01 |
A1 |
X SIGNED OFF |
04/04/2016 |
0021890 RA |
GEE |
|
GRANTED 07/28/2014
|
|
HEREWITH FILING TO CONVERT 10 ROOMING UNITS TO 8 DWELLING UNITS. NEW EXTEN
|
|
Work on Floor(s): BAS,CEL 001 thru 003
|