 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 05/05/2023 |
123512494 |
11 |
A1 |
P APPROVED |
05/15/2023 |
|
CALIENDO |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,002,003,004,ROF
|
| 05/01/2023 |
123512494 |
10 |
A1 |
P APPROVED |
05/03/2023 |
|
CALIENDO |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,002,003,004,ROF
|
| 04/03/2023 |
123512494 |
09 |
A1 |
P APPROVED |
04/07/2023 |
|
CALIENDO |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,002,003,004,ROF
|
| 01/26/2023 |
123512494 |
08 |
A1 |
P APPROVED |
02/13/2023 |
|
CALIENDO |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,002,003,004,ROF
|
| 12/23/2022 |
123512494 |
07 |
A1 |
P APPROVED |
12/30/2022 |
|
CALIENDO |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,002,003,004,ROF
|
| 12/15/2022 |
140857491 |
02 |
A2 |
P APPROVED |
01/05/2023 |
|
ZHOU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,OSP,ROF 001 thru 004
|
| 11/09/2022 |
123512494 |
06 |
A1 |
P APPROVED |
01/03/2023 |
0085450 PE |
ZHOU |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): BAS,ROF 001 thru 004
|
| 07/20/2022 |
123512494 |
05 |
A1 |
P APPROVED |
07/26/2022 |
|
CALIENDO |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,002,003,004,ROF
|
| 07/30/2021 |
123512494 |
04 |
A1 |
P APPROVED |
08/13/2021 |
|
CALIENDO |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,002,003,004,ROF
|
| 04/22/2021 |
123512494 |
03 |
A1 |
X SIGNED OFF |
01/02/2024 |
0071083 PE |
SALAM |
|
PENDING
|
|
HEREWITH FILING FOUNDATION STRUCTURAL DRAWINGS AS SUBSEQUENT FILING WITH A
|
|
Work on Floor(s): OSP,BAS
|
| 08/07/2019 |
140857491 |
01 |
A2 |
X SIGNED OFF |
01/20/2023 |
0085450 PE |
ZHOU |
|
NOT APPLICABLE
|
|
INSTALL NEW SPRINKLER SYSTEM IN EXISTING BUILDING IN CONJUNCTION WITH AI
|
|
Work on Floor(s): BAS,OSP,ROF 001 thru 004
|
| 03/01/2019 |
123512494 |
02 |
A1 |
X SIGNED OFF |
01/02/2024 |
0085450 PE |
ZHOU |
|
PENDING
|
|
INSTALL NEW HVAC & PLUMBING SYSTEM.
|
|
Work on Floor(s): BAS,ROF 001 thru 004
|
| 01/04/2019 |
123253335 |
01 |
A2 |
D A/P ENTIRE |
01/04/2019 |
0085450 PE |
ZHOU |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/04/2023 AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER F
|
|
Work on Floor(s): BAS,PNT,ROF 001 thru 004
|
| 12/17/2018 |
123512494 |
01 |
A1 |
X SIGNED OFF |
01/02/2024 |
0020241 RA |
CALIENDO |
|
PENDING
|
|
HEREWITH FILING ALTERATION TYPE ONE FOR CONVERSION OF EXISTING BUILDING TO
|
|
Work on Floor(s): BAS,001,002,003,004,ROF
|
| 06/21/2018 |
123582239 |
01 |
A2 |
P APPROVED |
09/10/2018 |
0020241 RA |
CALIENDO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/31/2023 APPLICATION HEREWITH FILED TO RENOVATE EXISTING F
|
|
Work on Floor(s): BAS 001 thru 004
|
| 09/18/2017 |
140690483 |
02 |
A3 |
D A/P ENTIRE |
09/19/2017 |
|
AHMED |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 02/01/2023
|
|
Work on Floor(s): OSP
|
| 09/06/2017 |
140690483 |
01 |
A3 |
R PERMIT-ENTIRE |
09/25/2017 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/01/2023 PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDI
|
|
Work on Floor(s): OSP
|
| 09/04/2017 |
140690036 |
01 |
A3 |
R PERMIT-ENTIRE |
09/07/2017 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/01/2023 PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED
|
|
Work on Floor(s): OSP
|