 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/19/2017 |
122143572 |
04 |
A2 |
P APPROVED |
04/26/2017 |
|
DIBARI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 02/21/2017 |
122143572 |
03 |
A2 |
P APPROVED |
04/07/2017 |
|
DIBARI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 01/25/2016 |
122143572 |
02 |
A2 |
P APPROVED |
02/22/2016 |
|
DIBARI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 05/05/2015 |
122143572 |
01 |
A2 |
X SIGNED OFF |
06/09/2017 |
0062063 PE |
DIBARI |
|
NOT APPLICABLE
|
|
FILING FOR INSTALLATION OF NEW BOILER. NO CHANGE IN EGRESS USE OR OCCUPANC
|
|
Work on Floor(s): CEL
|
| 10/21/2014 |
140267468 |
01 |
A2 |
X SIGNED OFF |
04/25/2016 |
0032789 RA |
AUFGANG |
|
NOT APPLICABLE
|
|
INTERIOR REPAIR OF EXISTING BUILDING. REPAIR PARTITIONS AS PER PLANS FILE
|
|
Work on Floor(s): BAS,ROF 001 thru 006
|
| 01/14/1998 |
100689872 |
03 |
A1 |
P APPROVED |
01/16/1998 |
0058324 PE |
HARDIE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): BAS 1 thru 6
|
| 09/22/1993 |
100689872 |
02 |
A1 |
X SIGNED OFF |
08/05/1999 |
0058324 PE |
HARDIE |
|
NOT APPLICABLE
|
|
INSTALLATION OF PLUMBING FIXTURES, PIPIN G, KITCHEN APPLIANCE & INSTALLA
|
|
Work on Floor(s): BAS 1 thru 6
|
| 09/22/1993 |
100689872 |
01 |
A1 |
X SIGNED OFF |
08/05/1999 |
0023315 RA |
MARTINEZ |
|
NOT APPLICABLE
|
|
REHAB, INTERIOR PARTITION, PLUMBING REMO VAL: NEW CONSTRUCTION PLUMBIN
|
|
Work on Floor(s): BAS 1 thru 6
|