| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/29/2023 |
140815429 |
03 |
A2 |
P APPROVED |
04/07/2023 |
|
GUNAL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 03/02/2022 |
140815429 |
02 |
A2 |
P APPROVED |
03/15/2022 |
|
GUNAL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 11/23/2021 |
123365848 |
03 |
A2 |
P APPROVED |
11/24/2021 |
|
GUNAL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 09/07/2021 |
123365848 |
02 |
A2 |
P APPROVED |
09/15/2021 |
|
GUNAL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 10/31/2018 |
140815465 |
01 |
A2 |
X SIGNED OFF |
07/31/2020 |
0087310 PE |
GUNAL |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW MECHANICAL VENTILATION FOR TEN (10) APARTMENT KITCHENS
|
|
Work on Floor(s): ROF 001 thru 005
|
| 10/31/2018 |
140815429 |
01 |
A2 |
X SIGNED OFF |
04/25/2023 |
0087310 PE |
GUNAL |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW GAS-FIRED STEAM BOILER & A SEPARATE INDIRECT DOMESTIC
|
|
Work on Floor(s): CEL
|
| 05/10/2018 |
123365848 |
01 |
A2 |
X SIGNED OFF |
02/10/2022 |
0087310 PE |
GUNAL |
|
NOT APPLICABLE
|
|
KITCHEN AND BATHROOM FIXTURES REMOVAL AND REPLACEMENT ON EXISTING ROUGH AS
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 05/10/2018 |
123365946 |
01 |
A2 |
X SIGNED OFF |
07/31/2020 |
0087310 PE |
GUNAL |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK AS PER PLANS AND IN COMPLIANCE WITH BUILDINGS BULLETIN 201
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 05/09/2018 |
123366008 |
01 |
A2 |
X SIGNED OFF |
07/31/2020 |
0035215 RA |
HENRY |
|
NOT APPLICABLE
|
|
NEW KITCHEN AND BATHROOMS AS PER PLANS. PATCH & REPAIR ENTRY STAIR, MINOR
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 01/28/2010 |
120249908 |
01 |
A3 |
R PERMIT-ENTIRE |
01/29/2010 |
0029017 RA |
CHRISTOP |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/26/2021 PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED
|
|
Work on Floor(s): OSP
|
| 02/11/2002 |
103095115 |
01 |
A2 |
X SIGNED OFF |
01/06/2004 |
0074266 PE |
WESOLOWS |
|
NOT APPLICABLE
|
|
UPGRADE 1500 GALLON HEATING OIL TANK WITH NEW TANK LINER, TANK MANWAY
|
|
Work on Floor(s): BAS
|
| 10/26/1994 |
100921870 |
01 |
A2 |
R PERMIT-ENTIRE |
10/27/1994 |
0020419 RA |
HULME |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/17/2021 ERECT SHED 25'-0". WE ARE PERFORMING MINOR FACADE
|
|
Work on Floor(s): GRD
|