| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/03/2021 |
123347137 |
08 |
A1 |
P APPROVED |
12/14/2021 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 08/04/2021 |
123347137 |
07 |
A1 |
P APPROVED |
08/06/2021 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 11/23/2020 |
140983078 |
01 |
A2 |
X SIGNED OFF |
02/16/2021 |
0026764 RA |
CHEN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING APARTMENT 2L ,2H AND 4H PER PLANS SHOW. NO
|
|
Work on Floor(s): 002,004
|
| 11/11/2020 |
140977637 |
01 |
A2 |
H P/E IN PROCESS |
11/11/2020 |
0026764 RA |
CHEN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/23/2020 INTERIOR RENOVATION OF EXISTING APARTMENT 2L ,2H
|
|
Work on Floor(s): 002,004
|
| 10/27/2020 |
140970983 |
01 |
A2 |
H P/E IN PROCESS |
10/27/2020 |
0026764 RA |
CHEN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/11/2020 INTERIOR RENOVATION OF EXISTING APARTMENT 2L AND
|
|
Work on Floor(s): 002,004
|
| 08/26/2020 |
140591848 |
03 |
A2 |
P APPROVED |
09/01/2020 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REMODEL APT 1C ON THE FIRST FLOOR. NO CHANG
|
|
Work on Floor(s): 001
|
| 08/17/2020 |
140939698 |
02 |
A2 |
P APPROVED |
08/21/2020 |
|
CHEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INTERIOR RENOVATION OF EXISTING APARTMENT 1
|
|
Work on Floor(s): 001,006
|
| 08/14/2020 |
140939698 |
01 |
A2 |
X SIGNED OFF |
10/29/2020 |
0026764 RA |
CHEN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING APARTMENT 1G AND 6H, REPLACE KITCHEN EQUIP
|
|
Work on Floor(s): 001,006
|
| 07/02/2020 |
140920699 |
01 |
A2 |
X SIGNED OFF |
09/21/2020 |
0026764 RA |
CHEN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING APT#1F ON FIRST FLOOR AND APT#5G ON 5TH FL
|
|
Work on Floor(s): 001,005
|
| 07/25/2019 |
123347137 |
06 |
A1 |
P APPROVED |
07/30/2019 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 05/09/2019 |
140827737 |
03 |
A2 |
P APPROVED |
05/10/2019 |
|
BILLAH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 03/18/2019 |
123475300 |
02 |
A2 |
P APPROVED |
04/18/2019 |
|
SHAGINYA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 03/12/2019 |
123347137 |
05 |
A1 |
P APPROVED |
03/22/2019 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 APPROVED ALT 832/1987 FILED TO REMODEL APAR
|
|
Work on Floor(s): CEL
|
| 03/12/2019 |
123659451 |
02 |
A2 |
P APPROVED |
03/21/2019 |
|
CHEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,003
|
| 02/11/2019 |
140827737 |
02 |
A2 |
P APPROVED |
02/12/2019 |
|
BILLAH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALL LAUNDRY EQUIPMENT IN CONJUNCTION WI
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 01/29/2019 |
123347137 |
04 |
A1 |
P APPROVED |
02/08/2019 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 01/18/2019 |
140827737 |
01 |
A2 |
X SIGNED OFF |
05/20/2020 |
0081186 PE |
BILLAH |
|
NOT APPLICABLE
|
|
INSTALL LAUNDRY EQUIPMENT IN CONJUNCTION WITH ALTERATION TYPE 1 # 12334713
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 01/18/2019 |
123659451 |
01 |
A2 |
X SIGNED OFF |
05/08/2019 |
0026764 RA |
CHEN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING APARTMENT
|
|
Work on Floor(s): 001,003
|
| 01/18/2019 |
123539199 |
01 |
A2 |
B A/P UNPAID |
01/18/2019 |
0026764 RA |
CHEN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/27/2019 INTERIOR RENOVATION OF EXISTING APARTMENT
|
|
Work on Floor(s): 003
|
| 01/15/2019 |
122687075 |
02 |
A2 |
P APPROVED |
02/12/2019 |
|
YEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 006
|
| 01/08/2019 |
123347137 |
03 |
A1 |
P APPROVED |
01/09/2019 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 11/15/2018 |
122687075 |
01 |
A2 |
X SIGNED OFF |
02/12/2019 |
0051576 PE |
YEN |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR REPAIRING AND LAY NEW FLOORING ON TOP EXISTING FLOORING
|
|
Work on Floor(s): 006
|
| 07/27/2018 |
123475300 |
01 |
A2 |
X SIGNED OFF |
06/24/2019 |
0095975 PE |
SHAGINYA |
|
NOT APPLICABLE
|
|
FILING FOR STRUCTURAL REPAIRS IN THE BASEMENT; NO CHANGE TO USE, EGRESS OR
|
|
Work on Floor(s): BAS
|
| 07/09/2018 |
140782437 |
01 |
A2 |
X SIGNED OFF |
07/08/2020 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
RENOVATE COMMERCIAL SPACE (UG 6) AT THE CELLAR LEVEL IN CONJUNCTION WITH
|
|
Work on Floor(s): CEL
|
| 03/05/2018 |
123347137 |
02 |
A1 |
P APPROVED |
03/20/2018 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 08/03/2017 |
123347137 |
01 |
A1 |
X SIGNED OFF |
02/23/2022 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
APPROVED ALT 832/1987 FILED TO REMODEL APARTMENTS AT REAR OF CELLAR. THIS
|
|
Work on Floor(s): CEL
|
| 05/30/2017 |
140591848 |
02 |
A2 |
J P/E DISAPPROVED |
08/10/2020 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 08/14/2020 REMODEL APT 1C ON THE FIRST FLOOR. NO CHANGE IN U
|
|
Work on Floor(s): 001
|
| 01/05/2017 |
140591848 |
01 |
A2 |
X SIGNED OFF |
10/22/2020 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
REMODEL APT 1C ON THE FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): 001
|
| 05/19/2016 |
140497736 |
01 |
A2 |
X SIGNED OFF |
08/18/2016 |
0087737 PE |
SO |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION ON EXISTING APARTMENT 3C AS PLAN. PARTITION WORK, PLUM
|
|
Work on Floor(s): 003
|
| 03/15/2012 |
120966124 |
02 |
A2 |
P APPROVED |
04/30/2012 |
|
CHEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 02/01/2012 |
120966124 |
01 |
A2 |
X SIGNED OFF |
09/07/2012 |
0026764 RA |
CHEN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING APARTMENT NO.5L. REPLACE EXISTING PLMBING
|
|
Work on Floor(s): 005
|
| 06/16/2011 |
120726072 |
01 |
A2 |
X SIGNED OFF |
11/10/2011 |
0026764 RA |
CHEN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING APARTMENTS NO. 3M AND 6K. REPLACE EXISTING
|
|
Work on Floor(s): 003,006
|
| 11/08/1990 |
100137889 |
01 |
A2 |
R PERMIT-ENTIRE |
12/11/1990 |
0013630 RA |
WADSWORT |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/28/2020 INSTALL NEW PLUMBING FIXTURES ON EXISTIN G ROUGH
|
|
Work on Floor(s): BAS,6TH
|
| 10/12/1990 |
100118034 |
02 |
A2 |
R PERMIT-ENTIRE |
10/12/1990 |
0013630 RA |
WADSWORT |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 02/25/2020
|
|
Work on Floor(s): BST 001 thru 006
|
| 09/24/1990 |
100118034 |
01 |
A2 |
R PERMIT-ENTIRE |
10/16/1990 |
0013630 RA |
WADSWORT |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/25/2020 INSTALL NEW GAS OVERHEAD DISTRIBUTION PIPING IN B
|
|
Work on Floor(s): BMT,6
|