| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/26/2023 |
123918449 |
01 |
A1 |
J P/E DISAPPROVED |
07/27/2023 |
0015046 RA |
SCHIMENT |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR AN EXTENSION OF A TERM OF VARIANCE. NO WORK TO BE DO
|
|
Work on Floor(s): GRD
|
| 10/04/2012 |
102165791 |
05 |
A1 |
P APPROVED |
10/24/2012 |
|
SCHIMENT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): GRD
|
| 08/21/2012 |
102165791 |
04 |
A1 |
P APPROVED |
08/24/2012 |
|
SCHIMENT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): GRD
|
| 07/30/2012 |
102165791 |
03 |
A1 |
P APPROVED |
08/08/2012 |
|
SCHIMENT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): GRD
|
| 04/01/2010 |
120306588 |
01 |
A2 |
X SIGNED OFF |
09/16/2011 |
0024340 RA |
DIAZ |
|
NOT APPLICABLE
|
|
FILING FOR FACADE REPAIR, REPLACE COPING, PARAPET REPLACEMENT, BRICK
|
|
Work on Floor(s): FAC
|
| 03/08/2010 |
120284236 |
01 |
A3 |
X SIGNED OFF |
10/20/2011 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF 85 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|
Work on Floor(s): OSP
|
| 03/13/2007 |
102165791 |
02 |
A1 |
P APPROVED |
04/18/2007 |
0015046 RA |
SCHIMENT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): GRD
|
| 06/09/1999 |
102165791 |
01 |
A1 |
X SIGNED OFF |
11/08/2012 |
0015046 RA |
SCHIMENT |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR AN EXTENSION OF TE RM OF VARIANCE. NO WORK TO BE
|
|
Work on Floor(s): GRD
|
| 06/17/1994 |
100864110 |
01 |
A2 |
P APPROVED |
07/07/1994 |
0039622 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/16/2011 REPLACE FUEL OIL TANK AND ENCLOSE NEW TANK IN MAS
|
|
Work on Floor(s): CEL
|