| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/17/2024 |
122529488 |
10 |
NB |
F ASSIGNED TO P/E |
07/18/2024 |
|
CHENG |
|
GRANTED 01/24/2018
|
|
DOC WITHDRAWN 08/01/2024
|
|
Work on Floor(s): CEL,OSP,ROF 001 thru 006
|
| 08/16/2023 |
122529488 |
09 |
NB |
P APPROVED |
10/16/2023 |
|
CHENG |
|
GRANTED 01/24/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,OSP,ROF 001 thru 006
|
| 08/01/2023 |
123918582 |
01 |
SC |
U COMPLETED |
08/14/2023 |
0025344 RA |
CHENG |
|
NOT APPLICABLE
|
|
SUBDIVIDE THE CONDOMINIUM BUILDING FROM ONE ZONING LOT TO 2 TAX LOTS #1001
|
|
Work on Floor(s): 001 thru 006
|
| 09/30/2022 |
122529488 |
08 |
NB |
P APPROVED |
11/22/2022 |
|
CHENG |
|
GRANTED 01/24/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,OSP,ROF 001 thru 006
|
| 09/29/2022 |
141020776 |
01 |
A3 |
X SIGNED OFF |
05/28/2024 |
0025344 RA |
CHENG |
|
NOT APPLICABLE
|
|
NEW BUILDINGS PAVING PLAN- TOTAL FRONTAGE 25 LINER FEET WITH NEW BUILDING
|
|
Work on Floor(s): OSP
|
| 05/25/2021 |
122529488 |
07 |
NB |
P APPROVED |
06/04/2021 |
0025344 RA |
CHENG |
|
GRANTED 01/24/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,OSP,ROF 001 thru 006
|
| 07/08/2019 |
122529488 |
06 |
NB |
P APPROVED |
07/29/2019 |
0088614 PE |
FEI |
|
GRANTED 01/24/2018
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,OSP,RFO 001 thru 006
|
| 06/18/2019 |
122529488 |
05 |
NB |
P APPROVED |
07/29/2019 |
|
CHENG |
|
GRANTED 01/24/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,OSP,ROF 001 thru 006
|
| 05/03/2019 |
140846636 |
01 |
A2 |
H P/E IN PROCESS |
05/03/2019 |
0025344 RA |
CHENG |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 07/02/2019 INSTALL PLUMBING AND GAS FIXTURES IN CONJUNCTION W
|
|
Work on Floor(s): CEL,OSP,ROF 001 thru 006
|
| 10/11/2018 |
122529488 |
03 |
NB |
P APPROVED |
06/13/2019 |
|
CHENG |
|
GRANTED 01/24/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,OSP,ROF 001 thru 006
|
| 03/20/2017 |
123047675 |
01 |
A3 |
J P/E DISAPPROVED |
05/09/2017 |
0025344 RA |
CHENG |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/23/2022 THIS IS A BPP APPLICATION TO BE FILED IN CONJUNCT
|
|
Work on Floor(s): OSP
|
| 09/01/2016 |
122529488 |
02 |
NB |
X SIGNED OFF |
09/06/2024 |
0088614 PE |
FEI |
|
GRANTED 01/24/2018
|
|
SUBSEQUENTLY FILING FOR STRUCTURAL AND FOUNDATION WORK.
|
|
Work on Floor(s): CEL,OSP,RFO 001 thru 006
|
| 02/18/2016 |
122529488 |
01 |
NB |
X SIGNED OFF |
09/06/2024 |
0025344 RA |
CHENG |
|
GRANTED 01/24/2018
|
|
PROPOSED TO ERECT A 6-STORY MIXED USE BUILDING.
|
|
Work on Floor(s): CEL,OSP,ROF 001 thru 006
|
| 04/20/2015 |
122382689 |
01 |
DM |
X SIGNED OFF |
08/22/2016 |
0072792 PE |
LIN |
|
NOT APPLICABLE
|
|
THIS JOB IS FILED FOR DEMOLITION OF A 1 STORY BUILDING.
|
|
Work on Floor(s): 001
|
| 11/06/2002 |
103303355 |
02 |
A2 |
R PERMIT-ENTIRE |
11/08/2002 |
0066283 PE |
ZEID |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/13/2024 PROPOSED INTERIOR RENOVATION OF AN EXISTING STORE
|
|
Work on Floor(s): 001
|
| 11/06/2002 |
103303355 |
01 |
A2 |
R PERMIT-ENTIRE |
11/08/2002 |
0066283 RA |
ZEID |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/13/2024 PROPOSED LEGALIZATION OF MINOR INTERIOR WORK. REF
|
|
Work on Floor(s): 001
|
|
122529488 |
04 |
NB |
A PRE-FILED |
06/17/2019 |
|
FEI |
|
GRANTED 01/24/2018
|
|
DOC WITHDRAWN 07/08/2019
|
|
Work on Floor(s): CEL,OSP,RFO 001 thru 006
|