| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/05/2004 |
103152669 |
10 |
A1 |
P APPROVED |
05/26/2005 |
0028925 RA |
WRIGHT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 005
|
| 08/31/2004 |
103245105 |
02 |
A2 |
P APPROVED |
01/21/2005 |
0068464 PE |
Rini III |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 005
|
| 08/26/2004 |
103152669 |
09 |
A1 |
P APPROVED |
09/13/2004 |
0028925 RA |
WRIGHT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 005
|
| 08/02/2004 |
103152669 |
08 |
A1 |
P APPROVED |
08/11/2004 |
0068464 PE |
Rini |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): CEL 001 thru 005
|
| 06/18/2004 |
103152669 |
07 |
A1 |
P APPROVED |
06/25/2004 |
0028925 RA |
WRIGHT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,ROF 001 thru 005
|
| 06/10/2004 |
103152669 |
06 |
A1 |
D A/P ENTIRE |
09/13/2004 |
0068464 PE |
Rini |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/07/2005
|
|
Work on Floor(s): BAS,ROF 001 thru 005
|
| 06/10/2004 |
103152669 |
05 |
A1 |
G PAA FEE DUE |
06/10/2004 |
0028925 RA |
WRIGHT |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 06/16/2004
|
|
Work on Floor(s): BAS,ROF 001 thru 005
|
| 09/18/2003 |
103568998 |
01 |
A2 |
X SIGNED OFF |
08/06/2004 |
0049364 PE |
ROSS |
|
NOT APPLICABLE
|
|
ERECTON OF 150' SIDEWALK SHED. FILED IN CONJUNCTION WITH ALT. TYPE I
|
|
Work on Floor(s): 001
|
| 08/23/2002 |
103246783 |
01 |
A2 |
X SIGNED OFF |
06/18/2004 |
0068464 PE |
Rini III |
|
NOT APPLICABLE
|
|
Install new boiler as shown on drawings. No change to use, egress or
|
|
Work on Floor(s): CEL
|
| 08/22/2002 |
103245105 |
01 |
A2 |
X SIGNED OFF |
04/29/2005 |
0068464 PE |
Rini III |
|
NOT APPLICABLE
|
|
Install new sprinkler system including new fire service connection at stre
|
|
Work on Floor(s): CEL 001 thru 005
|
| 08/19/2002 |
103241966 |
01 |
A3 |
X SIGNED OFF |
05/09/2005 |
0012499 RA |
Korves |
|
NOT APPLICABLE
|
|
Filed herewith is temporary plywood construction fence. No change to use,
|
|
Work on Floor(s): 001
|
| 05/07/2002 |
103152669 |
04 |
A1 |
X SIGNED OFF |
05/31/2005 |
0068464 PE |
Rini |
|
NOT APPLICABLE
|
|
Install new plumbing fixtures & related piping as shown on drawings.
|
|
Work on Floor(s): BAS,ROF 001 thru 005
|
| 05/07/2002 |
103152669 |
03 |
A1 |
X SIGNED OFF |
05/31/2005 |
0068464 PE |
Rini |
|
NOT APPLICABLE
|
|
Install new mechanical ductwork & equipment as shown on drawings.
|
|
Work on Floor(s): BAS,ROF 001 thru 005
|
| 05/07/2002 |
103152669 |
02 |
A1 |
X SIGNED OFF |
05/31/2005 |
0069933 PE |
Murray |
|
NOT APPLICABLE
|
|
Replace structural framing for floors & stairs.
|
|
Work on Floor(s): BAS,ROF 001 thru 005
|
| 05/07/2002 |
103152669 |
01 |
A1 |
X SIGNED OFF |
05/31/2005 |
0028925 RA |
WRIGHT |
|
NOT APPLICABLE
|
|
Propose gut rehabilitation to existing tenament buildings. Remove and ins
|
|
Work on Floor(s): CEL 001 thru 005
|
| 05/28/1998 |
101426244 |
02 |
A1 |
P APPROVED |
06/09/1998 |
0049244 PE |
LEPTOURG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 04/03/1997 |
101519563 |
01 |
A2 |
X SIGNED OFF |
05/13/1998 |
0018190 RA |
ESHKAR |
|
NOT APPLICABLE
|
|
REPLACE EXISTING ABOVE GROUND CAST IRON WASTE & VENT THROUGHOUT BUILDING
|
|
Work on Floor(s): CEL 001 thru 005
|
| 01/27/1997 |
101426244 |
01 |
A1 |
X SIGNED OFF |
02/08/1999 |
0049244 PE |
LEPTOURG |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION TO APARTMENTS ON THE CLR,FIRST THRU FIFTH FLRS &ROOF
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 06/06/1996 |
101315015 |
01 |
A2 |
X SIGNED OFF |
08/13/1997 |
0012075 RA |
SCHWARZ |
|
NOT APPLICABLE
|
|
REPLACE EXISTING STAIR FIRST FLOOR TO CELLAR IN EXISTING OPENING AND
|
|
Work on Floor(s): CEL,1
|
| 06/16/1993 |
100644894 |
01 |
A2 |
X SIGNED OFF |
10/19/1998 |
0036071 PE |
WEINER |
|
NOT APPLICABLE
|
|
INSTALL NEW BOILER AND BURNER AND TWO OI L TANKS. CONSTRUCT BOILER ROOM
|
|
Work on Floor(s): CEL
|