| | | | | | | | | |
FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
05/02/2018 |
123601405 |
01 |
A2 |
P APPROVED |
05/02/2018 |
0078495 PE |
MAK |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO RENOVATE CELLAR FLOOR. WORK WILL INCLUDE PARTITION
|
|
Work on Floor(s): CEL
|
09/20/2017 |
122247602 |
02 |
A2 |
P APPROVED |
09/26/2017 |
|
BILLAH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 3RD
|
03/25/2015 |
122347549 |
01 |
A2 |
X SIGNED OFF |
08/11/2015 |
0078495 PE |
MAK |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO RENOVATE APT 11 ON THE 5TH FLOOR. WORK WILL INCLUD
|
|
Work on Floor(s): 5TH
|
01/15/2015 |
122247602 |
01 |
A2 |
R PERMIT-ENTIRE |
01/15/2015 |
0081186 PE |
BILLAH |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO RENOVATE (APT 6) AT THE 3RD FLOOR. WORK WILL INCLU
|
|
Work on Floor(s): 3RD
|
02/05/2013 |
121524564 |
01 |
A2 |
X SIGNED OFF |
03/08/2018 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER WITH BOILER AND GAS/OIL BURNER. (NYC BOILER
|
|
Work on Floor(s): CEL
|
02/25/2011 |
110421222 |
02 |
A2 |
P APPROVED |
02/28/2011 |
|
MARCELO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
06/30/2010 |
120398649 |
01 |
A3 |
R PERMIT-ENTIRE |
07/01/2010 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
02/16/2010 |
120267059 |
01 |
A2 |
R PERMIT-ENTIRE |
02/18/2010 |
0065657 PE |
CHAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF FIRE SUPPRESSION SYSTEM AND S/S HOOD WITH EXHAUST DUCT. NO
|
|
Work on Floor(s): 001,ROF
|
12/18/2008 |
110421222 |
01 |
A2 |
X SIGNED OFF |
10/26/2011 |
0020199 RA |
MARCELO |
|
NOT APPLICABLE
|
|
INTERIOR ALTERATIONS TO EXISTING APT. 7/3RD FL. NEW PARTITIONS AND PLUMBIN
|
|
Work on Floor(s): 003
|