 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/25/2008 |
110215918 |
01 |
A3 |
R PERMIT-ENTIRE |
06/27/2008 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF APPROX. 40 L.F. TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REM
|
|
Work on Floor(s): 01
|
| 03/26/2008 |
110121591 |
01 |
A2 |
X SIGNED OFF |
05/19/2008 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
PROVIDE & INSTALL EXTERIOR METAL STAIRCASE, CELLAR TO 1ST FLOOR AS PER PLA
|
|
Work on Floor(s): CEL
|
| 08/07/2002 |
103225886 |
01 |
A2 |
X SIGNED OFF |
10/18/2002 |
0025884 RA |
MATHER |
|
NOT APPLICABLE
|
|
RAKE OUT REPOINT ALL MASONRY JOINTS AT ARCH BENEATH STOOP, PROVIDE NEW STE
|
|
Work on Floor(s): 001
|
| 08/31/2001 |
102351688 |
01 |
A2 |
R PERMIT-ENTIRE |
09/04/2001 |
0026031 RA |
Lenahan |
|
NOT APPLICABLE
|
|
Lintel Replacement. No change in use , egress , or occupancy.
|
|
Work on Floor(s): 001 thru 005
|
| 11/21/1996 |
101394876 |
01 |
A3 |
R PERMIT-ENTIRE |
11/27/1996 |
0056692 PE |
MOHAMMAD |
|
NOT APPLICABLE
|
|
CONSTRUCTION OF STANDARD WOOD SIDEWALK SHED OF 5O L.F. AT BUILDING
|
|
Work on Floor(s): GRD
|