| 03/18/2025 |
120371132 |
15 |
A1 |
J P/E DISAPPROVED |
04/21/2026 |
0035610 RA |
URUETA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 RENOVATE EXISTING BUILDING FIVE STORY COMME
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 005
|
| 07/11/2018 |
120371132 |
14 |
A1 |
P APPROVED |
07/12/2018 |
|
GAMBINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 005
|
| 05/10/2018 |
120371132 |
13 |
A1 |
P APPROVED |
05/17/2018 |
|
GAMBINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 005
|
| 02/09/2018 |
120371132 |
12 |
A1 |
P APPROVED |
02/15/2018 |
|
GAMBINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 005
|
| 02/09/2018 |
122643345 |
04 |
A2 |
P APPROVED |
02/21/2018 |
|
MERCURIO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 02/07/2018 |
120371132 |
11 |
A1 |
P APPROVED |
02/15/2018 |
|
GAMBINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 005
|
| 12/28/2017 |
120371132 |
10 |
A1 |
P APPROVED |
01/03/2018 |
|
GAMBINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 005
|
| 12/20/2017 |
122643345 |
03 |
A2 |
P APPROVED |
12/21/2017 |
|
MERCURIO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 09/28/2017 |
122577318 |
02 |
A2 |
J P/E DISAPPROVED |
01/23/2018 |
|
MERCURIO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/02/2025 INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 09/28/2017 |
123018242 |
02 |
A2 |
P APPROVED |
09/28/2017 |
|
GAMBINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,CEL,MEZ
|
| 09/28/2017 |
122643345 |
02 |
A2 |
P APPROVED |
09/28/2017 |
|
MERCURIO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 09/19/2017 |
120371132 |
08 |
A1 |
P APPROVED |
10/06/2017 |
|
GAMBINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 005
|
| 07/11/2017 |
120371132 |
07 |
A1 |
P APPROVED |
07/14/2017 |
0022172 RA |
GAMBINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 005
|
| 05/30/2017 |
120371132 |
06 |
A1 |
P APPROVED |
06/05/2017 |
|
GAMBINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 005
|
| 03/27/2017 |
122791247 |
03 |
A2 |
P APPROVED |
03/28/2017 |
|
MERCURIO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001 thru 005
|
| 02/14/2017 |
123018242 |
01 |
A2 |
X SIGNED OFF |
02/23/2018 |
0002172 RA |
GAMBINO |
|
NOT APPLICABLE
|
|
RENOVATE EXISTING COMMERCIAL SPACE AT THE CELLAR, MEZZANINE AND 1ST FLOOR.
|
|
Work on Floor(s): 001,CEL,MEZ
|
| 01/13/2017 |
120371132 |
05 |
A1 |
P APPROVED |
02/02/2017 |
|
GAMBINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 005
|
| 06/21/2016 |
122791247 |
02 |
A2 |
X SIGNED OFF |
02/11/2021 |
0085311 PE |
MERCURIO |
|
NOT APPLICABLE
|
|
PLUMBING AND MECHANICAL WORK BEING FILED IN CONJUNCTION WITH ALTERATION 2
|
|
Work on Floor(s): 001 thru 005
|
| 06/21/2016 |
122791247 |
01 |
A2 |
X SIGNED OFF |
02/11/2021 |
0022172 RA |
GAMBINO |
|
NOT APPLICABLE
|
|
RENOVATE EXISTING COMMERCIAL BUILDING ON THE 1ST THROUGH 5TH FLOORS. NO C
|
|
Work on Floor(s): 001 thru 005
|
| 03/11/2016 |
120371132 |
04 |
A1 |
P APPROVED |
03/14/2016 |
|
GAMBINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 005
|
| 03/07/2016 |
122627826 |
01 |
A3 |
X SIGNED OFF |
11/17/2020 |
0092183 PE |
PATTERSO |
|
NOT APPLICABLE
|
|
INSTALL FENCE IN CONJUNCTION WITH ALTERATION 1 APPLICATION NUMBER 12037113
|
|
Work on Floor(s): OSP
|
| 02/03/2016 |
120371132 |
03 |
A1 |
P APPROVED |
02/05/2016 |
|
GAMBINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 RENOVATE EXISTING FIVE STORY COMMERCIAL BUI
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 005
|
| 01/28/2016 |
122577318 |
01 |
A2 |
X SIGNED OFF |
12/09/2025 |
0085311 PE |
MERCURIO |
|
NOT APPLICABLE
|
|
INSTALLATION OF MANUAL AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 01/05/2016 |
122643247 |
01 |
A2 |
R PERMIT-ENTIRE |
05/24/2016 |
0085737 PE |
TARANTIN |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK BEING FILED IN CONJUNCTION WITH AN ALTERATION TYPE-1
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 01/05/2016 |
122643345 |
01 |
A2 |
R PERMIT-ENTIRE |
01/24/2018 |
0085311 PE |
MERCURIO |
|
NOT APPLICABLE
|
|
MECHANNICAL, PLUMBING, AND SPRINKLER WORK BEING FILED IN CONJUNCTION WITH
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 11/25/2015 |
122618907 |
02 |
A2 |
X SIGNED OFF |
02/26/2018 |
0085737 PE |
TARANTIN |
|
NOT APPLICABLE
|
|
STRUCTURAL DEMOLITION FILED IN CONJUNCTION WITH APPLICATION FOR INTERIOR
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 11/25/2015 |
122618907 |
01 |
A2 |
X SIGNED OFF |
02/26/2018 |
0022172 RA |
GAMBINO |
|
NOT APPLICABLE
|
|
INTERIOR DEMOLITION OF NON-LOAD BEARING PARTITIONS AS PER PLANS FILED. NO
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 09/13/2010 |
120371132 |
02 |
A1 |
P APPROVED |
10/22/2010 |
|
JUST |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 004
|
| 08/13/2010 |
120432923 |
01 |
A2 |
R PERMIT-ENTIRE |
04/30/2018 |
0018270 RA |
JUST |
|
NOT APPLICABLE
|
|
INSTALL SPRINKLER SYSTEM AT CELLAR INDICATED ON DRAWINGS FILED HEREWITH. N
|
|
Work on Floor(s): CEL,OSP
|
| 06/15/2010 |
120382102 |
01 |
A3 |
R PERMIT-ENTIRE |
03/25/2011 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION OF 50 FEET HIGH PIPE SCAFFOLD AS PER PLANS SUBMITTED HEREWITH
|
|
Work on Floor(s): OSP
|
| 06/15/2010 |
120381130 |
01 |
A3 |
X SIGNED OFF |
10/23/2025 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION OF 60 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED AS PER PLANS
|
|
Work on Floor(s): OSP
|
| 06/04/2010 |
120371132 |
01 |
A1 |
R PERMIT-ENTIRE |
07/13/2018 |
0022172 RA |
GAMBINO |
|
NOT APPLICABLE
|
|
RENOVATE EXISTING FIVE STORY COMMERCIAL BUILDING.
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 005
|
| 09/17/2009 |
120158015 |
01 |
A2 |
R PERMIT-ENTIRE |
06/25/2010 |
0018270 RA |
JUST |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/24/2017 INTERIOR DEMO OF NON LOAD BEARING PARTITIONS AND
|
|
Work on Floor(s): CEL 001 thru 005
|
| 01/26/1998 |
101722389 |
01 |
A3 |
R PERMIT-ENTIRE |
01/28/1998 |
|
BRESLIN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/24/2017 INSTALL SHED 50' DURING FACADE REPAIR. SHED TO CO
|
|
Work on Floor(s): GRD
|
| 06/21/1995 |
101093399 |
01 |
A2 |
R PERMIT-ENTIRE |
10/17/1995 |
0068029 PE |
CHON |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 04/24/2017 REPLACE EXISTING HVAC UNIT ON ROOF AND INSTALL HOT
|
|
Work on Floor(s): 1, ROF
|
|
120371132 |
09 |
A1 |
A PRE-FILED |
10/13/2017 |
|
GAMBINO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 01/03/2018
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 005
|