 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/17/2014 |
122198843 |
01 |
A2 |
Q PERMIT-PARTIAL |
06/05/2015 |
0026010 RA |
ANZALONE |
|
NOT APPLICABLE
|
|
RENOVATE EXISTING APARTMENT 1C AT THE FIRST FLOOR AND 2A AT THE SECOND FLO
|
|
Work on Floor(s): CEL,001,002
|
| 07/05/2013 |
121356843 |
02 |
A2 |
P APPROVED |
07/10/2013 |
|
RUDIKOFF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REPLACE OIL BURNER WITH GAS/OIL BURNER ON N
|
|
Work on Floor(s): CEL
|
| 09/04/2012 |
121356843 |
01 |
A2 |
X SIGNED OFF |
05/09/2014 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE OIL BURNER WITH GAS/OIL BURNER ON NYC BOILER NO. MD 47475-01. INS
|
|
Work on Floor(s): CEL
|
| 03/06/2008 |
110105092 |
01 |
A2 |
P APPROVED |
03/17/2008 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
ADD SPRINKLER HEADS IN THE PUBLIC HALL THROUGHOUT THE BUILDING. NO CHANGE
|
|
Work on Floor(s): 1 thru 6
|
| 10/23/2007 |
110003969 |
01 |
A1 |
Q PERMIT-PARTIAL |
03/18/2008 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
Add new 6th floor on top of existing 5 story building. Correct 1st floor
|
|
Work on Floor(s): 001,006
|
| 08/21/2007 |
104877965 |
01 |
A2 |
R PERMIT-ENTIRE |
12/24/2007 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
Remodel two west apartments on the 5th floor. No change to use, egress, or
|
|
Work on Floor(s): 005
|
| 04/24/1997 |
100971343 |
02 |
A2 |
P APPROVED |
04/25/1997 |
0058324 PE |
HARDIE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 01/17/1995 |
100971343 |
01 |
A2 |
R PERMIT-ENTIRE |
01/17/1995 |
0020381 RA |
GROSS |
|
NOT APPLICABLE
|
|
REPLACE BOILER & OIL BURNER. CHANGE FROM #4 OIL TO #2. OIL. NO CHANGE T
|
|
Work on Floor(s): CEL
|