| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/08/2019 |
140663422 |
02 |
A3 |
P APPROVED |
06/17/2019 |
|
O'CONNOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 005
|
| 10/23/2017 |
123170772 |
01 |
A2 |
R PERMIT-ENTIRE |
12/15/2017 |
0081186 PE |
BILLAH |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO RENOVATE APT 2R AT 2ND FLOOR. WORK WILL INCLUDE NE
|
|
Work on Floor(s): 2ND
|
| 06/30/2017 |
140663422 |
01 |
A3 |
X SIGNED OFF |
07/24/2019 |
0035839 RA |
O'CONNOR |
|
NOT APPLICABLE
|
|
STONE REPAIR AS PER PLAN .NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS
|
|
Work on Floor(s): 001 thru 005
|
| 05/15/2017 |
123077534 |
01 |
A3 |
R PERMIT-ENTIRE |
05/15/2017 |
0083149 PE |
MOHAMMAD |
|
NOT APPLICABLE
|
|
INSTALL HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. SIDEW
|
|
Work on Floor(s): OSP
|
| 03/28/2014 |
121964115 |
01 |
A2 |
R PERMIT-ENTIRE |
05/20/2014 |
0025617 RA |
CONCEPCI |
|
NOT APPLICABLE
|
|
FILING ALT TYPE 11 TO CHANGE FROM ELECTRIC COOKING EQUIPMENTS TO GAS COOKI
|
|
Work on Floor(s): 001
|
| 11/20/2013 |
140137037 |
01 |
A3 |
X SIGNED OFF |
01/16/2014 |
0033652 RA |
STILES |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 10/01/2012 |
121395221 |
01 |
A2 |
R PERMIT-ENTIRE |
10/01/2012 |
0078059 PE |
LEON |
|
NOT APPLICABLE
|
|
INSTALL NEW WALL FINISHES; NEW COUNTERTOP; INSTALL SHELVES; NEW FREZZER FO
|
|
Work on Floor(s): 001
|
| 08/31/2012 |
121362854 |
01 |
A3 |
R PERMIT-ENTIRE |
10/01/2012 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
REPLACE EXISTING COUNTER TABLE; PAINT WHOLE STORE.
|
|
Work on Floor(s): 001
|
| 09/01/2009 |
120144496 |
01 |
A2 |
X SIGNED OFF |
11/12/2013 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER (NYC BOILER # MD72649-01).
|
|
Work on Floor(s): CEL
|
| 12/18/2001 |
103059155 |
01 |
A2 |
R PERMIT-ENTIRE |
03/01/2002 |
0049244 PE |
Leptourg |
|
NOT APPLICABLE
|
|
Replace old , existing steel, above ground, 3,000 gal No.2 oil storage tan
|
|
Work on Floor(s): CEL,001
|
| 03/01/2001 |
102482822 |
01 |
A2 |
X SIGNED OFF |
05/29/2001 |
0049244 PE |
LETOURGO |
|
NOT APPLICABLE
|
|
INSTALL ONE OIL FIRED WATER,LOW PRESSURE BOILER AND ONE OIL
|
|
Work on Floor(s): CEL
|
| 10/18/2000 |
102445882 |
03 |
A2 |
P APPROVED |
10/26/2000 |
0018190 RA |
Eshkar |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 03/23/2000 |
102848037 |
01 |
A2 |
J P/E DISAPPROVED |
06/01/2001 |
0021935 RA |
PASSARET |
|
NOT APPLICABLE
|
|
RENOVATE EXISTING DONUT SHOP- COSMETIC WORK ONLY.
|
|
Work on Floor(s): 001
|
| 10/04/1999 |
102445882 |
02 |
A2 |
P APPROVED |
10/07/1999 |
0018190 RA |
Eshkar |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 09/13/1999 |
102445882 |
01 |
A2 |
X SIGNED OFF |
01/17/2001 |
0018190 RA |
Eshkar |
|
NOT APPLICABLE
|
|
Hot and cold water repipe throught building , replace overheads, mains, ri
|
|
Work on Floor(s): 005
|
| 05/25/1999 |
102172275 |
01 |
A2 |
X SIGNED OFF |
12/19/2000 |
0066708 RA |
Hirani |
|
NOT APPLICABLE
|
|
Repair Existing Vault
|
|
Work on Floor(s): CEL
|
| 02/12/1999 |
102185001 |
01 |
A2 |
X SIGNED OFF |
09/12/2014 |
0016923 RA |
DEACETIS |
|
NOT APPLICABLE
|
|
REMOVE THE DUMBWALTER BULKHEAD AND SEAL UP THE ROOF OPENING AND SEAL UP
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|