 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 05/31/2012 |
121097981 |
01 |
A2 |
X SIGNED OFF |
03/19/2013 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REPLACE (2) GAS BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY,
|
|
Work on Floor(s): CEL
|
| 04/23/2012 |
121052715 |
01 |
A3 |
X SIGNED OFF |
07/01/2014 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED APPROXIMATELY 60 L.F AS PER PLANS
|
|
Work on Floor(s): OSP
|
| 11/14/2000 |
101639425 |
03 |
A1 |
P APPROVED |
12/21/2000 |
0038991 PE |
JOSELOW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL 001 thru 005
|
| 11/17/1998 |
102189472 |
01 |
A3 |
R PERMIT-ENTIRE |
12/04/1998 |
OT |
SINGH |
|
NOT APPLICABLE
|
|
ERECT SIDEWALK SHED TO REPAIR BUILDING FACADE.COMPLY WITH LL 33/91
|
|
Work on Floor(s): 001
|
| 12/09/1997 |
101639425 |
01 |
A1 |
X SIGNED OFF |
01/23/2001 |
0017305 RA |
AVRAMIDE |
|
NOT APPLICABLE
|
|
SUBSTANTAL RENOVATION OF EXISTING BUILD- ING INCLUDING, ROOF, WINDOWS,
|
|
Work on Floor(s): CEL 001 thru 005
|
| 12/01/1997 |
101639425 |
02 |
A1 |
X SIGNED OFF |
01/23/2001 |
0038991 PE |
JOSELOW |
|
NOT APPLICABLE
|
|
NEW BOILER PLBG AND MECHANICALS.
|
|
Work on Floor(s): CEL 001 thru 005
|