| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/08/2015 |
121184949 |
02 |
A1 |
P APPROVED |
02/05/2015 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 01/08/2015 |
122244491 |
01 |
A2 |
X SIGNED OFF |
02/17/2017 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
REPLACE & RELOCATE GAS BOILER AND HOT WATER HEATER AT CELLAR IN CONJUNCTIO
|
|
Work on Floor(s): CEL
|
| 03/06/2014 |
121940631 |
01 |
A2 |
R PERMIT-ENTIRE |
05/08/2014 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/19/2014 INTERIOR PLUMBING AND FINISH WORK ONLY IN FIRST F
|
|
Work on Floor(s): 001
|
| 03/04/2014 |
121184949 |
01 |
A1 |
X SIGNED OFF |
03/22/2017 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
REMODEL FIRST FLOOR REAR APARTMENT (APT B). PROVIDE CONNECTING STAIR TO
|
|
Work on Floor(s): CEL,001
|
| 05/16/2000 |
102872651 |
03 |
A2 |
P APPROVED |
05/25/2000 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004
|
| 04/05/2000 |
102872651 |
02 |
A2 |
P APPROVED |
04/18/2000 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004
|
| 01/13/2000 |
102872651 |
01 |
A2 |
X SIGNED OFF |
07/19/2000 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
REMODEL APARTMENTS FRONT AND REAR ON 4TH FLOOR. REPLACE BATHES AND KTT
|
|
Work on Floor(s): 004
|
| 07/23/1999 |
102572681 |
01 |
A1 |
X SIGNED OFF |
08/20/2002 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
Construction of additional room at penthouse level same to be connected to
|
|
Work on Floor(s): 005,PEN
|
| 03/16/1999 |
102007686 |
01 |
A2 |
R PERMIT-ENTIRE |
01/04/2000 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/10/2000 Remodel apartment 3A, replace bath and ktte fixtu
|
|
Work on Floor(s): 003
|
| 07/28/1992 |
100292443 |
02 |
A1 |
M P/E PAA $ RESOLV |
09/15/1992 |
0007554 RA |
FEINGOLD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 5
|
| 04/03/1992 |
100384442 |
01 |
A2 |
X SIGNED OFF |
08/13/2002 |
0007554 RA |
FEINGOLD |
|
NOT APPLICABLE
|
|
PLUMBING & MECH WORK PROPOSE UNDER THIS APPLICATION.PREVIOUSLY APPROVED
|
|
Work on Floor(s): 5TH
|
| 07/23/1991 |
100292443 |
01 |
A1 |
X SIGNED OFF |
10/02/1992 |
0007554 RA |
FEINGOLD |
|
NOT APPLICABLE
|
|
REMODEL APT. 5TH FLOOR REAR,CONSTRUCT PENTHOUSE ON ROOF AS UPPER LEVEL
|
|
Work on Floor(s): 5
|
| 01/02/1991 |
100160914 |
01 |
A2 |
R PERMIT-ENTIRE |
01/31/1991 |
0007554 RA |
FEINGOLD |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/14/2016 REPLACE OIL FIRED BOILER WITH NEW GAS FIRED BOIL
|
|
Work on Floor(s): CLR
|