| 11/05/2020 |
140974453 |
01 |
A2 |
X SIGNED OFF |
09/13/2021 |
0021909 RA |
KATZ |
|
NOT APPLICABLE
|
|
KITCHEN RENOVATION INCLUDING INTERIOR RENOVATIONS ONLY IN APARTMENT #10A A
|
|
Work on Floor(s): 010
|
| 03/04/2020 |
123844581 |
01 |
A2 |
X SIGNED OFF |
09/15/2021 |
0025167 RA |
KELLEY |
|
NOT APPLICABLE
|
|
RENOVATION OF TWO BATHROOMS WITH MINOR PARTITION WORK. NO CHANGE OF USE,
|
|
Work on Floor(s): 011
|
| 12/05/2019 |
123469157 |
04 |
A2 |
P APPROVED |
12/06/2019 |
0070906 PE |
COWLEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 09/03/2019 |
123469157 |
03 |
A2 |
P APPROVED |
09/05/2019 |
0070906 PE |
COWLEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 FACADE REPAIRS AS PER PLANS FILED WITH PW1,
|
|
Work on Floor(s): FAC
|
| 08/08/2019 |
123469157 |
02 |
A2 |
P APPROVED |
08/14/2019 |
|
COWLEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 06/28/2019 |
123892877 |
02 |
A2 |
P APPROVED |
07/02/2019 |
|
EISELE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 05/09/2019 |
123584558 |
02 |
A2 |
P APPROVED |
05/14/2019 |
|
GERMAIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,OSP
|
| 04/29/2019 |
123892877 |
01 |
A2 |
X SIGNED OFF |
10/29/2020 |
0018180 RA |
EISELE |
|
NOT APPLICABLE
|
|
FILING RENOVATION OF APARTMENT 2B ON THE SECOND FLOOR. ARCHITECTURAL AND
|
|
Work on Floor(s): 002
|
| 04/22/2019 |
123836787 |
01 |
A2 |
P APPROVED |
12/27/2019 |
0027471 RA |
FETHES |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AND MH WORK TO APT 13A. NO CHANGE TO USE OCCUPANCY OR
|
|
Work on Floor(s): 013
|
| 04/08/2019 |
123469157 |
01 |
A2 |
X SIGNED OFF |
01/21/2020 |
0070906 PE |
COWLEY |
|
NOT APPLICABLE
|
|
FACADE REPAIRS AS PER PLANS FILED WITH PW1, DOCUMENT #1. NO CHANGE TO USE,
|
|
Work on Floor(s): FAC
|
| 08/07/2018 |
123584558 |
01 |
A2 |
X SIGNED OFF |
05/17/2019 |
0065403 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS ON (2)EXISTING LP BOILERS.
|
|
Work on Floor(s): CEL,OSP
|
| 01/17/2018 |
123045392 |
02 |
A2 |
P APPROVED |
01/18/2018 |
|
LEONG-AK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 007
|
| 10/30/2017 |
123187103 |
01 |
A2 |
X SIGNED OFF |
10/19/2018 |
0030341 RA |
CONTEGIA |
|
NOT APPLICABLE
|
|
FILING FOR THE RENOVATION AND COMBINATION OF UNIT 8D AND 8DD ON THE 8TH FL
|
|
Work on Floor(s): 008
|
| 03/15/2017 |
123045392 |
01 |
A2 |
X SIGNED OFF |
05/03/2018 |
0016682 RA |
LEONG-AK |
|
NOT APPLICABLE
|
|
FILING RENOVATION OF APARTMENT 7B. ARCHITECTURAL, PLUMBING AND MECHANICAL
|
|
Work on Floor(s): 007
|
| 11/16/2016 |
122879126 |
01 |
A2 |
X SIGNED OFF |
01/18/2017 |
0086781 PE |
JIA |
|
NOT APPLICABLE
|
|
FILING FOR REPAIR OF EXISTING WATER TOWER FRAME ON THE ROOF LEVEL. NO CHAN
|
|
Work on Floor(s): ROF
|
| 10/01/2016 |
122527961 |
02 |
A2 |
P APPROVED |
10/31/2016 |
|
DEUTSCH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 011
|
| 09/28/2016 |
122904438 |
01 |
A2 |
X SIGNED OFF |
10/03/2017 |
0027303 RA |
DEUTSCH |
|
NOT APPLICABLE
|
|
INSTALLATION OF ELECTRIC DRYER EXHAUST IN APARTMENT 11E. NO CHANGE TO USE,
|
|
Work on Floor(s): 011
|
| 07/25/2016 |
122834219 |
01 |
A2 |
X SIGNED OFF |
10/12/2017 |
0011247 RA |
HAMMER |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO RENOVATE APT. 9A., WORK TO INCLUDE REMOVAL OF EXIST
|
|
Work on Floor(s): 009
|
| 09/16/2015 |
122527961 |
01 |
A2 |
X SIGNED OFF |
09/21/2017 |
0027303 RA |
DEUTSCH |
|
NOT APPLICABLE
|
|
MODIFICATION TO INTERIOR PARTITIONS ALONG WITH RELATED GENERAL CONSTRUCTIO
|
|
Work on Floor(s): 011
|
| 04/07/2015 |
122360578 |
01 |
A2 |
R PERMIT-ENTIRE |
08/27/2015 |
0017850 RA |
HANRAHAN |
|
NOT APPLICABLE
|
|
RENOVATION TO EXISTING APT. INCLUDING REPLACING FLOORS REMOVING PARTITIO
|
|
Work on Floor(s): 012
|
| 11/14/2014 |
122197292 |
01 |
A3 |
X SIGNED OFF |
01/29/2018 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
TEMPORARY PLYWOOD AND FIRE RETARDANT TARP PROTECTION ON EXISTING SUPPORTED
|
|
Work on Floor(s): OSP
|
| 11/12/2014 |
121894726 |
02 |
A3 |
P APPROVED |
12/02/2014 |
|
WALSH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,012
|
| 10/01/2014 |
122111936 |
01 |
A2 |
X SIGNED OFF |
09/18/2015 |
0030813 RA |
PULVER |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APT # 7D (7 FLOOR) CONSISTING OF SELECTIVE PARTITIO
|
|
Work on Floor(s): 007
|
| 06/20/2014 |
122012106 |
01 |
A2 |
R PERMIT-ENTIRE |
07/02/2014 |
0015561 RA |
VENEZIAL |
|
NOT APPLICABLE
|
|
REPLACE DOORS FOR RENOVATION OF LAUNDRY ROOM AT CELLAR. NEW WASHING MACHIN
|
|
Work on Floor(s): CEL
|
| 06/20/2014 |
122045250 |
01 |
A2 |
R PERMIT-ENTIRE |
06/25/2014 |
0064046 PE |
POPESCU |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR STRUCTURAL STEEL REPAIRS ON THE ROOF AS PER THE DRAWIN
|
|
Work on Floor(s): ROF
|
| 05/20/2014 |
122014943 |
01 |
A3 |
X SIGNED OFF |
02/09/2018 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERRECT TEMPORARY SHORING TO SUPPORT STRUCTURAL BEAM DURING RESTORATION AS
|
|
Work on Floor(s): 011 thru 012
|
| 01/13/2014 |
121894726 |
01 |
A3 |
X SIGNED OFF |
01/29/2018 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT A TOTAL OF 112 LINEAR FEET BY 140 FEET APPROXIMATE HEIGHT OF TUBULAR
|
|
Work on Floor(s): 002,012
|
| 08/29/2013 |
121751746 |
01 |
A2 |
R PERMIT-ENTIRE |
09/19/2013 |
0015561 RA |
VENEZIAL |
|
NOT APPLICABLE
|
|
EMERGENCY PARAPET REPAIR AND EMERGENCY FA?ADE REPAIR. NO CHANGE IN USE, EG
|
|
Work on Floor(s): FAC,ROF
|
|
121634017 |
01 |
A3 |
A PRE-FILED |
05/29/2013 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT TEMPORARY SHORING TO STABILIZE REAR FACADE AS PER ATTACHED DRAWINGS
|
|
Work on Floor(s): 002,004
|
|
121633973 |
01 |
A3 |
A PRE-FILED |
05/29/2013 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
INSTALLATION OF PROTECTION OVER TERRACES ON 12 FLOORS OF THE BUILDING FOR
|
|
Work on Floor(s): 012
|
|
121633991 |
01 |
A3 |
A PRE-FILED |
05/29/2013 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT APPROX. 120 LINEAR FEET LONG BY APPROX. 4 FEET WIDE PLYWOOD CONSTRU
|
|
Work on Floor(s): 001 thru 002
|
|
121634008 |
01 |
A3 |
A PRE-FILED |
05/29/2013 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT A TOTAL OF 24 LINEAR FEET BY 140 FEET APPROXIMATE HEIGHT OF TUBULAR
|
|
Work on Floor(s): 002,012
|
| 05/17/2013 |
121622690 |
01 |
A3 |
X SIGNED OFF |
01/29/2018 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT A TOTAL OF 269 LINEAR FEET BY 18 FEET WIDTH AND 12-14 FEET APPROXIM
|
|
Work on Floor(s): 001 thru 002
|
| 06/12/2012 |
121108238 |
01 |
A2 |
R PERMIT-ENTIRE |
07/31/2013 |
0030813 RA |
PULVER |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APT # 7C (7 FLOOR) CONSISTING OF SELECTIVE PARTION
|
|
Work on Floor(s): 007
|
| 12/01/2010 |
120530390 |
02 |
A3 |
G PAA FEE DUE |
12/01/2010 |
|
GEIGER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 11/15/2010 |
120530390 |
01 |
A3 |
R PERMIT-ENTIRE |
11/15/2010 |
0061152 PE |
GEIGER |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH
|
|
Work on Floor(s): OSP
|
| 04/08/2010 |
120267200 |
02 |
A2 |
P APPROVED |
04/16/2010 |
|
FIGUEROA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004
|
| 02/17/2010 |
120267200 |
01 |
A2 |
X SIGNED OFF |
12/30/2010 |
0024690 RA |
FIGUEROA |
|
NOT APPLICABLE
|
|
MINOR INTERIOR RENOVATIONS TO APARTMENT 4C. SCOPE OF WORK DOES NOT REQUIRE
|
|
Work on Floor(s): 004
|
| 11/12/2009 |
120192549 |
01 |
A2 |
X SIGNED OFF |
03/02/2010 |
0014427 RA |
ELLIS |
|
NOT APPLICABLE
|
|
FACADE REPAIR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): FAC
|
| 10/05/2009 |
120171090 |
01 |
A3 |
X SIGNED OFF |
06/02/2011 |
0052024 PE |
TAUBERER |
|
NOT APPLICABLE
|
|
INSTALLATION OF 155 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|