 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 10/30/2017 |
140711914 |
PR |
I LAA SIGNED OFF |
04/11/2018 |
MP 000907 |
PEPE |
|
TO REPLACE ON EXISTING ROUGHING A TOILET, A WASH BASIN & BATHTUB WITH A 2"
|
|
Work on Floor(s): 011
|
| 06/25/2015 |
122297308 |
PR |
J LAA DISAPPROVED |
07/09/2015 |
MP 001570 |
DAMOULAK |
|
IN CELLAR, REMOVE EXISTING DIRECT VENT APPLIANCE; IN CELLAR, REPLACE AO SM
|
|
Work on Floor(s): CEL
|
| 08/04/2014 |
140235877 |
PR |
I LAA SIGNED OFF |
12/01/2014 |
MP 002342 |
FOY |
|
IN BASEMENT, INSTALL (2) 4" WILKINS # 375 BACKFLOW PREVENTERS, MEA# 49-01-
|
|
Work on Floor(s): BAS
|
| 10/04/2013 |
140121721 |
PR |
I LAA SIGNED OFF |
07/29/2014 |
MP 001338 |
TERMINE |
|
IN THE CELLAR LAUNDRY ROOM REPLACE TOTAL OF (8) GAS FLEX CONNECTORS WITH 3
|
|
Work on Floor(s): CEL
|
| 06/27/2012 |
140021660 |
PR |
I LAA SIGNED OFF |
01/11/2013 |
OBI 005260 |
CAPUTO |
|
CHANGE GRADE OF OIL FROM #6 TO #4. A PRE-HEATER WILL BE REMOVED AND AN ANT
|
|
Work on Floor(s): CEL
|
| 07/22/1994 |
100831780 |
PR |
E LAA FILED |
07/22/1994 |
MP 000413 |
BRENNER |
|
MASTER BATHROOM: REPLACE PLUMBING FIXTURES TO THE EXISTING ROUGHINGS -
|