 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 11/18/2025 |
123486325 |
03 |
A2 |
P APPROVED |
11/19/2025 |
0037689 RA |
RUZEU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003,006
|
| 11/07/2025 |
123436503 |
10 |
A2 |
P APPROVED |
11/12/2025 |
0037689 RA |
RUZEU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): BAS
|
| 11/06/2025 |
123112238 |
09 |
A2 |
P APPROVED |
11/13/2025 |
0037689 RA |
RUZEU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): BAS
|
| 10/27/2025 |
123486343 |
08 |
A1 |
P APPROVED |
10/29/2025 |
|
RUZEU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 006
|
| 09/05/2025 |
123436503 |
09 |
A2 |
P APPROVED |
10/30/2025 |
0037689 RA |
RUZEU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 004
|
| 09/03/2025 |
123112238 |
08 |
A2 |
P APPROVED |
10/30/2025 |
0037689 RA |
RUZEU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 006
|
| 08/14/2025 |
123112229 |
09 |
A2 |
P APPROVED |
08/22/2025 |
0037689 RA |
RUZEU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): BAS
|
| 02/14/2025 |
123187693 |
02 |
A3 |
P APPROVED |
02/27/2025 |
0096214 PE |
SHUVO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 10/15/2024 |
123112229 |
08 |
A2 |
P APPROVED |
08/15/2025 |
0037689 RA |
RUZEU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 006
|
| 02/21/2023 |
123486343 |
07 |
A1 |
P APPROVED |
02/27/2023 |
|
RUZEU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 006
|
| 01/30/2023 |
123486343 |
06 |
A1 |
P APPROVED |
02/07/2023 |
|
RUZEU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 006
|
| 12/08/2022 |
123486343 |
05 |
A1 |
P APPROVED |
12/19/2022 |
0048918 PE |
LIOTTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): BAS
|
| 10/25/2022 |
123486343 |
04 |
A1 |
P APPROVED |
11/14/2022 |
|
RUZEU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 006
|
| 08/20/2020 |
123486343 |
03 |
A1 |
P APPROVED |
10/18/2021 |
0037689 RA |
RUZEU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 MERGE 4 TAX LOTS INTO 1 AND CONVERT EXISTIN
|
|
Work on Floor(s): BAS 001 thru 006
|
| 06/18/2019 |
123112238 |
07 |
A2 |
P APPROVED |
06/21/2019 |
|
LOIKITS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 006
|
| 06/18/2019 |
123436503 |
08 |
A2 |
P APPROVED |
06/21/2019 |
|
LOIKITS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 004
|
| 06/18/2019 |
123112229 |
07 |
A2 |
P APPROVED |
06/21/2019 |
|
LOIKITS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 006
|
| 10/26/2018 |
123486325 |
02 |
A2 |
R PERMIT-ENTIRE |
12/27/2018 |
0094115 PE |
WOLF |
|
NOT APPLICABLE
|
|
PROVIDE SANITARY FACILITIES AS PER PLANS FILED
|
|
Work on Floor(s): 003,006
|
| 10/24/2018 |
123486325 |
01 |
A2 |
R PERMIT-ENTIRE |
12/27/2018 |
0037689 RA |
RUZEU |
|
NOT APPLICABLE
|
|
RENOVATION OF 2 APARTMENTS AS PER PLANS FILED NO CHANGE IN USE OCCUPANCY O
|
|
Work on Floor(s): 003,006
|
| 10/18/2018 |
123436503 |
07 |
A2 |
P APPROVED |
10/26/2018 |
|
WOLF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): BAS 001 thru 006
|
| 10/18/2018 |
123436503 |
06 |
A2 |
P APPROVED |
10/26/2018 |
|
LOIKITS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 004
|
| 07/13/2018 |
123486343 |
02 |
A1 |
R PERMIT-ENTIRE |
08/11/2020 |
0048918 PE |
LIOTTA |
|
NOT APPLICABLE
|
|
PROVIDE MECHANICAL VENTILATION AND SANITARY FACILITIES AS PER PLANS FILED
|
|
Work on Floor(s): BAS
|
| 07/13/2018 |
123486343 |
01 |
A1 |
R PERMIT-ENTIRE |
08/11/2020 |
0037689 RA |
RUZEU |
|
NOT APPLICABLE
|
|
MERGE 4 TAX LOTS INTO 1 AND CONVERT EXISTING GROUND FLOOR STORAGE AREAS TO
|
|
Work on Floor(s): BAS 001 thru 006
|
| 06/15/2018 |
123436503 |
05 |
A2 |
P APPROVED |
06/22/2018 |
|
WOLF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): BAS 001 thru 006
|
| 06/15/2018 |
123436503 |
04 |
A2 |
P APPROVED |
06/19/2018 |
|
LOIKITS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 RENOVATION OF COMMON AREAS AND 3 APARTMENTS
|
|
Work on Floor(s): BAS 001 thru 006
|
| 03/12/2018 |
123436503 |
03 |
A2 |
R PERMIT-ENTIRE |
03/13/2018 |
0037689 RA |
RUZEU |
|
NOT APPLICABLE
|
|
PROVIDE STRUCTURAL FRAMING FOR RAMP AS PER PLANS FILED
|
|
Work on Floor(s): BAS
|
| 03/12/2018 |
123436503 |
02 |
A2 |
R PERMIT-ENTIRE |
10/11/2018 |
0094115 PE |
WOLF |
|
NOT APPLICABLE
|
|
PROVIDE SANITARY FACILITIES AND HVAC AS PER PLANS FILED
|
|
Work on Floor(s): BAS 001 thru 006
|
| 03/12/2018 |
123436503 |
01 |
A2 |
R PERMIT-ENTIRE |
07/02/2019 |
0037689 RA |
RUZEU |
|
NOT APPLICABLE
|
|
RENOVATION OF COMMON AREAS AND 3 APARTMENTS AS PER PLANS FILED NO CHANGE I
|
|
Work on Floor(s): 001 thru 004
|
| 03/06/2018 |
123112229 |
06 |
A2 |
P APPROVED |
03/12/2018 |
|
LOIKITS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 RENOVATION OF COMMON AREAS AND 8 APARTMENTS
|
|
Work on Floor(s): BAS 001 thru 006
|
| 03/06/2018 |
123112238 |
06 |
A2 |
P APPROVED |
03/12/2018 |
|
LOIKITS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 RENOVATION OF COMMON AREAS AND 6 APARTMENTS
|
|
Work on Floor(s): BAS 001 thru 006
|
| 02/23/2018 |
123112229 |
05 |
A2 |
P APPROVED |
02/26/2018 |
|
WOLF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): BAS 001 thru 006
|
| 02/23/2018 |
123112238 |
05 |
A2 |
P APPROVED |
02/26/2018 |
|
WOLF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): BAS 001 thru 006
|
| 12/12/2017 |
123112238 |
04 |
A2 |
P APPROVED |
12/15/2017 |
|
WOLF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): BAS 001 thru 006
|
| 12/12/2017 |
123112229 |
04 |
A2 |
P APPROVED |
12/15/2017 |
|
WOLF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): BAS 001 thru 006
|
| 10/10/2017 |
123112229 |
03 |
A2 |
R PERMIT-ENTIRE |
11/30/2017 |
0094115 PE |
WOLF |
|
NOT APPLICABLE
|
|
PROVIDE SANITARY FACILITIES AND HVAC AS PER PLANS FILED
|
|
Work on Floor(s): BAS 001 thru 006
|
| 10/10/2017 |
123112229 |
02 |
A2 |
R PERMIT-ENTIRE |
10/17/2017 |
0037689 RA |
RUZEU |
|
NOT APPLICABLE
|
|
PROVIDE STRUCTURAL FRAMING FOR RAMP AS PER PLANS FILED
|
|
Work on Floor(s): BAS
|
| 10/10/2017 |
123112229 |
01 |
A2 |
R PERMIT-ENTIRE |
07/01/2019 |
0037689 RA |
RUZEU |
|
NOT APPLICABLE
|
|
RENOVATION OF COMMON AREAS AND 8 APARTMENTS AS PER PLANS FILED NO CHANGE I
|
|
Work on Floor(s): BAS 001 thru 006
|
| 10/04/2017 |
123187693 |
01 |
A3 |
X SIGNED OFF |
03/25/2025 |
0096214 PE |
SHUVO |
|
NOT APPLICABLE
|
|
APPLICATION FILE FOR REPAIR FRONT BRICK FACADE RE POINTING/BRICK REPLACEME
|
|
Work on Floor(s): OSP
|
| 10/03/2017 |
123112238 |
03 |
A2 |
R PERMIT-ENTIRE |
10/04/2017 |
0037689 RA |
RUZEU |
|
NOT APPLICABLE
|
|
PROVIDE STRUCTURAL FRAMING FOR RAMP AS PER PLANS FILED
|
|
Work on Floor(s): BAS
|
| 10/03/2017 |
123112238 |
02 |
A2 |
R PERMIT-ENTIRE |
11/30/2017 |
0094115 PE |
WOLF |
|
NOT APPLICABLE
|
|
PROVIDE SANITARY FACILITIES AND HVAC AS PER PLANS FILED
|
|
Work on Floor(s): BAS 001 thru 006
|