| 06/24/2008 |
110210815 |
01 |
A3 |
R PERMIT-ENTIRE |
06/25/2008 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF APPROX. 20 L.F. TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REM
|
|
Work on Floor(s): 01
|
| 06/24/2008 |
110221171 |
01 |
A3 |
R PERMIT-ENTIRE |
06/25/2008 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF APPROX. 20'WIDE X 40' HIGH TEMPORARY PIPE SCAFFOLD FOR REM
|
|
Work on Floor(s): 02 thru 03
|
| 06/11/2007 |
104797819 |
01 |
A2 |
P APPROVED |
10/11/2007 |
0030767 RA |
SHANNON |
|
NOT APPLICABLE
|
|
EXTERIOR FACADE REFACING (BROWNSTONING) AND METAL RAILING CHANGES. NEW HOS
|
|