| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/31/2013 |
121542250 |
02 |
A2 |
P APPROVED |
01/10/2014 |
|
CAMPEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 03/11/2013 |
121542250 |
01 |
A2 |
R PERMIT-ENTIRE |
08/12/2013 |
0020012 RA |
CAMPEN |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR RENOVATION AT CELLAR AND 3RD FLOOR ON EXISTING RESIDENTI
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 07/21/2010 |
103482394 |
06 |
A1 |
P APPROVED |
07/23/2010 |
|
GRIFFIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 06/25/2010 |
103482394 |
05 |
A1 |
P APPROVED |
07/15/2010 |
|
GRIFFIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 07/23/2007 |
103482394 |
04 |
A1 |
P APPROVED |
08/16/2007 |
0012389 RA |
GRIFFIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 03/09/2007 |
103482394 |
03 |
A1 |
P APPROVED |
05/31/2007 |
0012389 RA |
GRIFFIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 11/04/2005 |
103482394 |
02 |
A1 |
P APPROVED |
11/15/2005 |
0012389 RA |
GRIFFIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 06/03/2004 |
103760306 |
01 |
A2 |
J P/E DISAPPROVED |
06/14/2004 |
0058324 PE |
Hardie |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/08/2008 Drawings are filed in order to install new Forced
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 06/18/2003 |
103482394 |
01 |
A1 |
X SIGNED OFF |
07/23/2010 |
0012389 RA |
GRIFFIN |
|
NOT APPLICABLE
|
|
These drawings are filed in order to convert an existing SRO into a Two fa
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 08/06/1999 |
102566965 |
01 |
A2 |
J P/E DISAPPROVED |
08/06/1999 |
0012389 RA |
GRIFFIN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/02/2010 Lamination of existing walls and replacement of p
|
|
Work on Floor(s): CEL,BAS,001,002,003
|
| 11/10/1998 |
102239971 |
01 |
A2 |
J P/E DISAPPROVED |
11/16/1998 |
0012389 RA |
GRIFFIN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/08/2008 FILING TO REPLACE FLOOR JOISTS & ROOF JOISTS AS R
|
|
Work on Floor(s): 002,003
|