 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/15/2019 |
123693681 |
01 |
A2 |
X SIGNED OFF |
11/14/2019 |
0022382 RA |
TARTAGLI |
|
NOT APPLICABLE
|
|
HEREWITH FILING TO REMOVE EXISTING HYDRO THERM BOILERS AND REPLACE WITH (2
|
|
Work on Floor(s): CEL 001 thru 005
|
| 06/28/2007 |
104821855 |
01 |
A3 |
R PERMIT-ENTIRE |
06/28/2007 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 25 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR FA
|
|
Work on Floor(s): OSP
|
| 10/05/2006 |
104575808 |
01 |
A3 |
R PERMIT-ENTIRE |
04/26/2007 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 25 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR
|
|
Work on Floor(s): OSP
|
| 06/02/2006 |
104452067 |
01 |
A2 |
X SIGNED OFF |
03/07/2008 |
0018528 RA |
Ephron |
|
NOT APPLICABLE
|
|
General construction per building envelope rehabilitation as per plans
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 04/19/2006 |
104409659 |
01 |
A3 |
R PERMIT-ENTIRE |
04/25/2006 |
OT |
MAHMOOD |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 50 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR
|
|
Work on Floor(s): OSP
|
| 02/27/1996 |
101241620 |
01 |
A2 |
X SIGNED OFF |
11/06/1996 |
0042976 PE |
BALSER |
|
NOT APPLICABLE
|
|
APPLICATION FILED TO SHOW EXTERIOR REHABILITATION WORK AS PER PLANS
|
|
Work on Floor(s): EXT
|
| 11/28/1995 |
101160306 |
01 |
A3 |
R PERMIT-ENTIRE |
11/29/1995 |
|
BRESLIN |
|
NOT APPLICABLE
|
|
INSTALL SHED 76' ON E 100 ST DURING FACA DE REPAIR. NO CHANGE TO USE EGR
|
|
Work on Floor(s): GRD
|