| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/09/2018 |
140630823 |
02 |
A2 |
P APPROVED |
02/13/2018 |
|
DIBARI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,ROF
|
| 04/17/2017 |
140630823 |
01 |
A2 |
X SIGNED OFF |
03/19/2018 |
0062063 PE |
DIBARI |
|
NOT APPLICABLE
|
|
REMOVE AND REPLACE BOILER WITH ALL ITS COMPONENTS PER PLANS. NO CHANGE TO
|
|
Work on Floor(s): BAS,ROF
|
| 06/25/2016 |
140513638 |
01 |
A3 |
X SIGNED OFF |
01/02/2018 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD
|
|
Work on Floor(s): OSP
|
| 11/07/2008 |
110378092 |
01 |
A3 |
R PERMIT-ENTIRE |
01/08/2009 |
0071962 PE |
ABDALLA |
Y |
NOT APPLICABLE
|
|
INSTALLATION OF20 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REP
|
|
Work on Floor(s): OSP
|