| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 06/22/2018 |
140778282 |
PR |
I LAA SIGNED OFF |
07/22/2019 |
MP 002224 |
HAXHIAJ |
|
DIRECT REPLACEMENT OF PLUMBING FIXTURES FOR TWO BATHROOMS ON EXISTING WATE
|
|
Work on Floor(s): 011
|
| 05/03/2017 |
140637069 |
PR |
I LAA SIGNED OFF |
07/05/2017 |
MP 001824 |
MICELI |
|
REPLACE APPROXIMATELY 20' 3/4" AND 20' 1/2" COPPPER WATER LINES BACK TO TH
|
|
Work on Floor(s): 008
|
| 01/23/2017 |
140597307 |
PR |
E LAA FILED |
01/23/2017 |
MP 001363 |
PIVOVARO |
|
JOB CLOSED 09 05 2023
|
|
Work on Floor(s): 006
|
| 11/15/2016 |
140576080 |
PR |
I LAA SIGNED OFF |
03/03/2017 |
MP 001839 |
MCMILLAN |
|
TO REMOVE THE BATHTUB AND INSTALL A SHOWER STALL WITH A 2" WASTE AND TO RE
|
|
Work on Floor(s): 8TH
|
| 10/21/2016 |
122583052 |
PR |
E LAA FILED |
11/17/2016 |
MP 001338 |
TERMINE |
|
IN CELLAR, REGISTER (3) AMERICAN GAS DRYERS. (EACH DRYER HAS 2 DRYER POCKE
|
|
Work on Floor(s): CEL
|
| 05/19/2016 |
140497950 |
PR |
I LAA SIGNED OFF |
03/25/2017 |
MP 000620 |
KRAUS |
|
THIS IS A MASTER METER BUILDING,IN APT 8-D, TO RELOCATE EXISTING GAS VALVE
|
|
Work on Floor(s): 008
|
| 01/15/2016 |
140449655 |
PR |
E LAA FILED |
01/15/2016 |
MP 001432 |
CHESHMEH |
|
REPLACE 2 TOILETS, 2 LAVATORIES, 2 SHOWER BODIES,1 BATHTUB ON THE EXISTING
|
|
Work on Floor(s): 017
|
| 09/10/2015 |
140401642 |
PR |
I LAA SIGNED OFF |
06/27/2016 |
MP 001485 |
LEE |
|
REPLACEMENT OF ONE KITCHEN SINK AND ONE DISHWASHER ON EXISTING ROUGHING.
|
|
Work on Floor(s): 010
|
| 09/08/2015 |
140400545 |
PR |
I LAA SIGNED OFF |
11/19/2015 |
MP 001485 |
LEE |
|
REPLACE 2 LAVATORIES, 2 TOILETS ON EXISTING ROUGHING AND ONE SHOWER CAP.
|
|
Work on Floor(s): 010
|
| 04/08/2015 |
140331200 |
PR |
E LAA FILED |
04/08/2015 |
MP 000872 |
DIETZ |
|
WATER PLUMBING WORK:IN APARTMENT 20B ON 20TH FLOOR REPLACE THE FOLLOWING
|
|
Work on Floor(s): 020
|
| 09/04/2014 |
140249069 |
PR |
I LAA SIGNED OFF |
06/10/2015 |
MP 001534 |
DOUDOUNI |
|
ON 9TH FL IN APMT.9E/F INSTALL 4 WATER CLOSETS, 4 SHOWERS, 3 LAVS & 3 TUBS
|
|
Work on Floor(s): 9TH
|
| 02/27/2014 |
140167673 |
PR |
E LAA FILED |
02/27/2014 |
MP 001399 |
JARKOW |
|
REPLACE ONE BATHTUB, ONE SHOWER BODY AND ONE LAVATORY ALL IN EXISTING LOCA
|
|
Work on Floor(s): 005
|
| 08/15/2013 |
140106659 |
PR |
I LAA SIGNED OFF |
02/08/2014 |
MP 001596 |
WARD |
|
REPLACE ON NEW ROUGHING: 2 LAVS, 2 WCS, 2 TUBS. REPLACE ON KITCHEN SINK O
|
|
Work on Floor(s): 017
|
| 02/04/2013 |
110588784 |
PR |
I LAA SIGNED OFF |
07/08/2013 |
MP 001524 |
CRITELLI |
|
FILING TO RENEW PREVIOUS LAA #140007141. IN BASEMENT, INSTALL ONE (1) 4 IN
|
|
Work on Floor(s): BAS
|
| 01/24/2013 |
140051280 |
PR |
I LAA SIGNED OFF |
01/10/2014 |
MP 002153 |
FEYGELMA |
|
REPLACE PLUMBING FIXTURES ON EXITING ROUGHING 1 SINK,1 LOVATORY,2
|
|
Work on Floor(s): 016
|
| 08/31/2012 |
140028093 |
PR |
I LAA SIGNED OFF |
02/25/2013 |
MP 001254 |
PERAKIS |
|
RELOCATE PLUMBING FIXTURES
|
|
Work on Floor(s): 015
|
| 01/25/2012 |
140007141 |
PR |
E LAA FILED |
01/25/2012 |
MP 001524 |
CRITELLI |
|
IN BASEMENT, INSTALL ONE (1) 4 INCH WATTS #709 DOUBLE CHECK VALVE ON DOMES
|
|
Work on Floor(s): BSM
|
| 12/13/2010 |
110524264 |
PR |
I LAA SIGNED OFF |
02/18/2011 |
MP 002170 |
CIKOLLA |
|
SUPPLY LABOR AND MATERIAL TO REMOVE ONE TOILET ONE LAVATORY AND ONE KITCHE
|
|
Work on Floor(s): 020
|
| 08/21/2001 |
102146688 |
PR |
I LAA SIGNED OFF |
01/31/2002 |
MP 000620 |
KRAUS |
|
EMERGENCY REPAIR: REPLACED AND REROUTED EXISTING DEFECTIVE BATHTUB WASTE W
|
|
Work on Floor(s): 001
|
| 10/18/1991 |
100193997 |
PR |
E LAA FILED |
10/18/1991 |
MP 000838 |
UNDERHIL |
|
INSTALL ONE NEW 4" DOMESTIC WATER METER.
|