 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 08/17/2018 |
123248388 |
PR |
E LAA FILED |
10/19/2018 |
MP 002341 |
CLARK |
|
EWN19616_REPLACEMENT OF (1) GAS BOILER & (1) HW HEATER. CONNECT TO EXISTIN
|
|
Work on Floor(s): CEL
|
| 12/15/2017 |
140725348 |
PR |
I LAA SIGNED OFF |
01/30/2018 |
MP 001135 |
YU |
|
IN APT. 1E ON 001 FLOOR, IN THE MASTER BATHROOM DIRECT REPLACEMENT OF ONE
|
|
Work on Floor(s): 001
|
| 10/08/2013 |
140122800 |
PR |
I LAA SIGNED OFF |
11/20/2013 |
MP 001923 |
BALOGLOU |
|
IN THE CELLAR LAUNDRY ROOM REPLACE TOTAL OF (1) GAS FLEX CONNECTOR WITH 3/
|
|
Work on Floor(s): CEL
|