| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/07/2024 |
140667703 |
05 |
A2 |
P APPROVED |
08/08/2024 |
|
GAO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 05/15/2024 |
140667703 |
04 |
A2 |
P APPROVED |
05/29/2024 |
|
GAO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 01/13/2022 |
122816658 |
02 |
A2 |
P APPROVED |
01/18/2022 |
|
COWLEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 08/24/2021 |
123808914 |
03 |
A2 |
P APPROVED |
09/14/2021 |
|
BROWNING |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 011
|
| 05/11/2021 |
123793957 |
04 |
A3 |
P APPROVED |
05/12/2021 |
|
COWLEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 09/28/2020 |
123793957 |
03 |
A3 |
P APPROVED |
09/29/2020 |
|
COWLEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 09/14/2020 |
123793957 |
02 |
A3 |
P APPROVED |
09/21/2020 |
|
COWLEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 01/28/2020 |
123793957 |
01 |
A3 |
P APPROVED |
01/28/2020 |
0070906 PE |
COWLEY |
|
NOT APPLICABLE
|
|
FILING HEREWITH FOR SSP IN CONJUNCTION WITH FACADE APPLICATION #. NO WORK
|
|
Work on Floor(s): OSP
|
| 01/28/2020 |
122816658 |
01 |
A2 |
X SIGNED OFF |
02/11/2022 |
0070906 PE |
COWLEY |
|
NOT APPLICABLE
|
|
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR
|
|
Work on Floor(s): FAC
|
| 06/04/2019 |
140667703 |
03 |
A2 |
P APPROVED |
09/18/2019 |
|
GAO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 05/07/2019 |
123808914 |
01 |
A2 |
X SIGNED OFF |
11/03/2022 |
0039191 RA |
BROWNING |
|
NOT APPLICABLE
|
|
RENOVATE UNIT 11DE ON THE 11TH FLOOR. WORK TO INCLUDE REMOVING AND INSTAL
|
|
Work on Floor(s): 011
|
| 05/07/2019 |
123808914 |
02 |
A2 |
X SIGNED OFF |
11/03/2022 |
0086810 PE |
DOMLIJA |
|
NOT APPLICABLE
|
|
PLUMBING WORK BEING FILED IN CONJUNCTION WITH RENOVATION OF UNIT 11DE ON T
|
|
Work on Floor(s): 011
|
| 12/17/2018 |
123212727 |
03 |
A2 |
P APPROVED |
12/19/2018 |
|
TSUE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 7TH
|
| 08/27/2018 |
123212727 |
02 |
A2 |
P APPROVED |
10/16/2018 |
|
TSUE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 7TH
|
| 06/11/2018 |
123112121 |
02 |
A2 |
P APPROVED |
06/14/2018 |
|
BILLINGS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 011
|
| 03/16/2018 |
123212727 |
01 |
A2 |
X SIGNED OFF |
01/18/2019 |
0013322 RA |
TSUE |
|
NOT APPLICABLE
|
|
PARTIAL RENOVATION OF APARTMENT #7BC ON THE 7TH FLOOR. WORK INCLUDES MINOR
|
|
Work on Floor(s): 7TH
|
| 02/06/2018 |
140667703 |
02 |
A2 |
P APPROVED |
02/22/2018 |
|
GAO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 01/25/2018 |
123191358 |
01 |
A2 |
X SIGNED OFF |
06/26/2025 |
0050090 PE |
SHIN |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING APARTMENT 10A ON THE 10TH FLOOR. ARCHITECTURAL AND
|
|
Work on Floor(s): 010
|
| 09/15/2017 |
140695157 |
01 |
A2 |
R PERMIT-ENTIRE |
10/03/2017 |
0035362 RA |
KINDO |
|
NOT APPLICABLE
|
|
RENOVATE KITCHEN AND PARTITIONS. REPLACE 1 SINK. REPLACE 1 RANGE. NO CHANG
|
| 09/07/2017 |
140691829 |
01 |
A2 |
D A/P ENTIRE |
09/07/2017 |
0035362 RA |
KINDO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/14/2017 RENOVATE KITCHEN AND PARTITIONS. REPLACE 1 SINK,
|
|
Work on Floor(s): 014 thru 015
|
| 09/07/2017 |
123112121 |
01 |
A2 |
X SIGNED OFF |
08/27/2018 |
0026116 RA |
BILLINGS |
|
NOT APPLICABLE
|
|
MINOR PARTITION AND CABINET REMOVAL, NEW PARTITIONS, NEW & MODIFIED PLUMBI
|
|
Work on Floor(s): 011
|
| 08/24/2017 |
122851538 |
01 |
A2 |
X SIGNED OFF |
03/09/2018 |
0033885 RA |
CHANG |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR RENOVATION OF APT#9D. PARTITION & PLUMBING WORK AS PER P
|
|
Work on Floor(s): 009
|
| 07/12/2017 |
140667703 |
01 |
A2 |
X SIGNED OFF |
08/12/2024 |
0094452 PE |
GAO |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION WITH PARTITIONS & PLUMBING WORKS AT APT#2F ON SECOND F
|
|
Work on Floor(s): 002
|
| 10/07/2015 |
121705878 |
07 |
A2 |
P APPROVED |
01/04/2016 |
|
LOTFI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): PEN
|
| 10/07/2015 |
121705878 |
06 |
A2 |
P APPROVED |
01/04/2016 |
|
MADIGAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 016
|
| 03/02/2015 |
121705878 |
05 |
A2 |
P APPROVED |
03/09/2015 |
|
LOTFI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): PEN
|
| 08/15/2014 |
121705878 |
04 |
A2 |
P APPROVED |
09/11/2014 |
|
LOTFI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 016
|
| 07/01/2014 |
122055480 |
01 |
A2 |
X SIGNED OFF |
09/22/2016 |
0032907 RA |
MIKHAEL |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION. REPLACE WINDOWS, AND PLUMBING WORK A PER DRAWINGS
|
|
Work on Floor(s): 008
|
| 02/21/2014 |
121705878 |
03 |
A2 |
P APPROVED |
03/03/2014 |
|
LOTFI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 016
|
| 11/07/2013 |
121744407 |
02 |
A2 |
P APPROVED |
01/22/2014 |
|
HOPP |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004
|
| 10/03/2013 |
121744407 |
01 |
A2 |
R PERMIT-ENTIRE |
01/27/2014 |
0034314 RA |
HOPP |
|
NOT APPLICABLE
|
|
LEGALIZATION OF PARTITION CHANGES TO CREATE ROOM, NO CHANGE IN USE EGRESS
|
|
Work on Floor(s): 004
|
| 07/05/2013 |
121705878 |
02 |
A2 |
X SIGNED OFF |
02/03/2016 |
0070045 PE |
LOTFI |
|
NOT APPLICABLE
|
|
MECHANICAL & PLUMBING WORK AS SHOWN ON PLANS
|
|
Work on Floor(s): PEN
|
| 07/05/2013 |
121705878 |
01 |
A2 |
X SIGNED OFF |
02/03/2016 |
0033850 RA |
MADIGAN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION TO INCLUDE DEMO OF EXISTING AND CONSTRUCTION OF NEW
|
|
Work on Floor(s): 016
|
| 07/03/2013 |
121108826 |
03 |
A3 |
P APPROVED |
07/08/2013 |
|
PERDEK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 06/12/2013 |
121108826 |
02 |
A3 |
P APPROVED |
06/13/2013 |
|
PERDEK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF 142 LINEAR FEET OF HEAVY DU
|
|
Work on Floor(s): OSP
|
| 05/01/2013 |
121513594 |
01 |
A3 |
R PERMIT-ENTIRE |
06/24/2013 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING BUILDING ALTERATION FILED
|
|
Work on Floor(s): OSP
|
| 04/18/2013 |
140071053 |
01 |
A2 |
R PERMIT-ENTIRE |
05/17/2013 |
0030112 RA |
SU |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING APT #6A. CHANGE FLOOR TILES AND WALL TILES
|
|
Work on Floor(s): 006
|
| 04/16/2013 |
121591009 |
01 |
A2 |
X SIGNED OFF |
06/20/2014 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE OIL BURNER WITH GAS/OIL BURNER ON NYC BOILER NO. MD 7536-01. INSTA
|
|
Work on Floor(s): CEL,ROF 001 thru 016
|
| 04/15/2013 |
121588861 |
01 |
A2 |
Q PERMIT-PARTIAL |
01/30/2014 |
0020791 RA |
RYZINSKI |
|
NOT APPLICABLE
|
|
COMBINATION OF APARTMENTS 14D & 14E AS PER TPPN 3/97. WORK TO INCLUDE PART
|
|
Work on Floor(s): 014
|
| 03/28/2013 |
140065952 |
01 |
A2 |
H P/E IN PROCESS |
03/28/2013 |
0030112 RA |
SU |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/28/2013 INTERIOR RENOVATION OF EXISTING APT #6A. CHANGE F
|
|
Work on Floor(s): 004
|