 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/18/2022 |
140902478 |
02 |
A2 |
P APPROVED |
05/05/2022 |
|
KRESHTOO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 06/09/2020 |
140902478 |
01 |
A2 |
X SIGNED OFF |
10/26/2022 |
0019112 RA |
KRESHTOO |
|
NOT APPLICABLE
|
|
HEREEITH FILE APPLICATION FOR THE RENOVATION OF APT GB9, ON THE CELLAR LEV
|
|
Work on Floor(s): CEL
|
| 02/04/2019 |
123671516 |
01 |
A2 |
P APPROVED |
02/21/2019 |
0029357 RA |
TRONDOWS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/01/2023 FILING HEREWITH INTERIOR RENOVATIONS OF EXISTING
|
|
Work on Floor(s): 004
|
| 08/28/2018 |
123240377 |
04 |
A2 |
P APPROVED |
09/10/2018 |
|
TRONDOWS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,UDG
|
| 06/25/2018 |
123240377 |
03 |
A2 |
P APPROVED |
07/02/2018 |
|
TRONDOWS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,UDG
|
| 04/27/2018 |
123045846 |
02 |
A2 |
P APPROVED |
05/07/2018 |
|
LAU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 004
|
| 02/20/2018 |
122850165 |
08 |
A2 |
P APPROVED |
02/27/2018 |
|
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001,003
|
| 12/12/2017 |
123099280 |
03 |
A2 |
P APPROVED |
01/18/2018 |
|
SWEENEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 004
|
| 11/15/2017 |
123240377 |
02 |
A2 |
X SIGNED OFF |
09/27/2018 |
0067955 PE |
O'HANLON |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK FILED IN CONJUNCTION WITH RENOVATION OF APARTMENT GB2 ON T
|
|
Work on Floor(s): CEL
|
| 11/15/2017 |
123240377 |
01 |
A2 |
X SIGNED OFF |
09/27/2018 |
0029357 RA |
TRONDOWS |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION TO AN EXISTING APARTMENT GB2 ON THE CELLAR LEVEL OF A
|
|
Work on Floor(s): CEL,UDG
|
| 10/27/2017 |
123290189 |
01 |
A2 |
P APPROVED |
11/03/2017 |
0016554 RA |
ZENREICH |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF THE 1ST-FLOOR LOBBY, AND ADA COMPLIANT ENTRANCE. WO
|
|
Work on Floor(s): 001
|
| 09/27/2017 |
122850165 |
07 |
A2 |
P APPROVED |
11/15/2017 |
|
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001,003
|
| 08/14/2017 |
140573396 |
03 |
A2 |
P APPROVED |
08/16/2017 |
|
MESZAROS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 06/21/2017 |
123099280 |
02 |
A2 |
X SIGNED OFF |
02/20/2018 |
0076561 PE |
SWEENEY |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK FILED IN CONJUNCTION WITH RENOVATION OF APT 4L ON 4TH FLOO
|
|
Work on Floor(s): 004
|
| 06/21/2017 |
123099280 |
01 |
A2 |
X SIGNED OFF |
02/20/2018 |
0029357 RA |
TRONDOWS |
|
NOT APPLICABLE
|
|
RENOVATION OF APT 4L ON THE 4TH FLOOR. ARCHITECTURAL & PLUMBING WORK. NO C
|
|
Work on Floor(s): 004
|
| 06/07/2017 |
140573396 |
02 |
A2 |
P APPROVED |
06/08/2017 |
|
MESZAROS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 03/24/2017 |
123045846 |
01 |
A2 |
X SIGNED OFF |
06/11/2018 |
0073602 PE |
LAU |
|
NOT APPLICABLE
|
|
NORTH ELEVATION EXTERIOR REPAIRS. NO CHANGE IN USE, OCCUPANCY, OGRESS.
|
|
Work on Floor(s): 001 thru 004
|
| 12/28/2016 |
122850165 |
06 |
A2 |
P APPROVED |
01/12/2017 |
|
SWEENEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03 STRUCTURAL WORK FILED IN CONJUNCTION WITH R
|
|
Work on Floor(s): 001,002,003
|
| 12/28/2016 |
122850165 |
05 |
A2 |
P APPROVED |
01/12/2017 |
|
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02 PLUMBING WORK FILED IN CONJUNCTION WITH REN
|
|
Work on Floor(s): CEL,001,003
|
| 12/28/2016 |
122850165 |
04 |
A2 |
P APPROVED |
01/12/2017 |
|
TRONDOWS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INTERIOR RENOVATION OF EXISTING APT 1C ON T
|
|
Work on Floor(s): 001,003
|
| 11/15/2016 |
122564457 |
05 |
A2 |
P APPROVED |
11/28/2016 |
|
SWEENEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02 STRUCTURAL WORK FILED IN CONJUNCTION WITH I
|
|
Work on Floor(s): 002,004
|
| 11/15/2016 |
122446326 |
02 |
A2 |
P APPROVED |
11/22/2016 |
|
TRONDOWS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INTERIOR RENOVATION OF 4 APARTMENT UNITS, A
|
|
Work on Floor(s): 002,004
|
| 11/10/2016 |
140573396 |
01 |
A2 |
X SIGNED OFF |
08/29/2017 |
0088892 PE |
MESZAROS |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW DUAL FUEL BOILER AND BURNER.
|
|
Work on Floor(s): CEL
|
| 09/29/2016 |
122850165 |
03 |
A2 |
X SIGNED OFF |
03/06/2018 |
0076561 PE |
SWEENEY |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APT 1C ON
|
|
Work on Floor(s): 001,002,003
|
| 09/29/2016 |
122850165 |
02 |
A2 |
X SIGNED OFF |
03/06/2018 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APT 1C ON T
|
|
Work on Floor(s): CEL,001,003
|
| 09/29/2016 |
122850165 |
01 |
A2 |
X SIGNED OFF |
03/06/2018 |
0029357 RA |
TRONDOWS |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING APT 1C ON THE FIRST FLOOR AND APARTMENT 3E
|
|
Work on Floor(s): 001,003
|
| 06/01/2016 |
122564457 |
04 |
A2 |
P APPROVED |
07/01/2016 |
|
TRONDOWS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,004
|
| 02/26/2016 |
122564457 |
03 |
A2 |
P APPROVED |
03/04/2016 |
|
SWEENEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02 STRUCTURAL WORK FILED IN CONJUNCTION WITH I
|
|
Work on Floor(s): 001,002,004
|
| 01/04/2016 |
122533703 |
01 |
A2 |
X SIGNED OFF |
06/22/2016 |
0073602 PE |
LAU |
|
NOT APPLICABLE
|
|
ROOF REPLACEMENT AND ROOF TOP REPAIRS. NO CHANGE IN USE, OCCUPANCY, OR EGR
|
|
Work on Floor(s): 001 thru 004
|
| 11/05/2015 |
122564457 |
02 |
A2 |
X SIGNED OFF |
01/30/2017 |
0076561 PE |
SWEENEY |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION AND COMBINAT
|
|
Work on Floor(s): 002,004
|
| 11/05/2015 |
122564457 |
01 |
A2 |
X SIGNED OFF |
01/30/2017 |
0029357 RA |
TRONDOWS |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AND COMBINATION OF APARTMENT 2H AND 2I ON THE 002 FLOO
|
|
Work on Floor(s): 002,004
|
| 10/12/2015 |
140410008 |
01 |
A3 |
R PERMIT-ENTIRE |
10/15/2015 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD
|
|
Work on Floor(s): OSP
|
| 06/30/2015 |
122446326 |
01 |
A2 |
X SIGNED OFF |
01/10/2017 |
0029357 RA |
TRONDOWS |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF 4 APARTMENT UNITS, APARTMENT 2E,2M AND 2P ON THE 2N
|
|
Work on Floor(s): 002,004
|
| 06/25/2014 |
122001118 |
01 |
A2 |
Q PERMIT-PARTIAL |
07/21/2015 |
0029357 RA |
TRONDOWS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/01/2017 RENOVATION OF AN EXISTING APARTMENT #2H ON THE 2N
|
|
Work on Floor(s): 002
|
| 02/27/2013 |
121037591 |
02 |
A2 |
P APPROVED |
04/19/2013 |
|
JUBRAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
| 04/09/2012 |
121037591 |
01 |
A2 |
X SIGNED OFF |
09/20/2013 |
0023532 RA |
JUBRAN |
|
NOT APPLICABLE
|
|
PROVIDE GENERAL CONSTRUCTION AND PLUMBING WORK FOR THE RENOVATION OF THE
|
| 03/07/2012 |
120999893 |
01 |
A2 |
P APPROVED |
03/07/2012 |
0023532 RA |
JUBRAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/04/2012 PROVIDE RENOVATION OF BATHROOM AND KITCHEN INCLUD
|
| 07/01/2009 |
120057669 |
03 |
A2 |
P APPROVED |
07/08/2009 |
|
HABJAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
| 06/04/2009 |
120057669 |
02 |
A2 |
X SIGNED OFF |
04/12/2010 |
0071073 PE |
SIEGEL |
|
NOT APPLICABLE
|
|
SUBSEQUENT FILING FOR STRUCTURAL STABILITY ASSOCIATED WITH ORIGINAL FILING
|
| 06/04/2009 |
120057669 |
01 |
A2 |
X SIGNED OFF |
04/12/2010 |
0025136 RA |
HABJAN |
|
NOT APPLICABLE
|
|
COMBINING OF APARTMENTS #3H &3I AS PER TPPN#3/97. REMOVE KITCHEN IN 3I. C
|