| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/31/2024 |
124039487 |
01 |
A1 |
J P/E DISAPPROVED |
08/07/2024 |
0028625 RA |
SHARPLES |
|
NOT APPLICABLE
|
|
FILING TO CHANGE THE METES AND BOUNDS ONLY.ZONING LOT NOW INCLUDES LOTS 2
|
|
Work on Floor(s): OSP
|
| 03/21/2020 |
122727497 |
02 |
A2 |
P APPROVED |
03/24/2020 |
|
REVANS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 05/04/2016 |
122727497 |
01 |
A2 |
X SIGNED OFF |
07/17/2020 |
0091827 PE |
REVANS |
|
NOT APPLICABLE
|
|
INSTALL (1) NEW 6" DIA 10 GAGE 316 S.S ALL WELDED CONICAL REDUCER FOR FIRE
|
|
Work on Floor(s): ROF
|
| 01/28/2016 |
140448816 |
01 |
A3 |
R PERMIT-ENTIRE |
01/18/2017 |
0084781 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
INSTALLATION OF ROOF PROTECTION AS PER PLANS DURING NB CONSTRUCTION. NO CH
|
|
Work on Floor(s): OSP
|
| 01/12/2016 |
140448255 |
01 |
A3 |
H P/E IN PROCESS |
01/12/2016 |
0084781 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/13/2016 INSTALLATION OF ROOF PROTECTION AS PER PLANS DURI
|
|
Work on Floor(s): OSP
|
| 11/01/2011 |
120544036 |
02 |
A2 |
P APPROVED |
11/10/2011 |
|
LEVIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 11/26/2010 |
120544036 |
01 |
A2 |
R PERMIT-ENTIRE |
07/17/2012 |
0073350 PE |
LEVIN |
|
NOT APPLICABLE
|
|
INSTAL HOT WATER BOILER WITH NEW STORAGE TANK, NEW METER AND GAS PIPING, C
|
|
Work on Floor(s): CEL
|
| 09/18/2008 |
110246332 |
01 |
A2 |
R PERMIT-ENTIRE |
09/24/2008 |
0016162 RA |
TURNER |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO INCLUDE NEW BOILER, NEW HOT WATER HEATER. NO CHANG
|
|
Work on Floor(s): CEL
|
| 07/23/2007 |
104839285 |
01 |
A3 |
R PERMIT-ENTIRE |
07/24/2007 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 25 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR
|
|
Work on Floor(s): OSP
|