 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/13/2024 |
141025389 |
01 |
A2 |
D A/P ENTIRE |
02/13/2024 |
0043989 RA |
PIA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/21/2024 INTERIOR RENOVATION OF APARTMENT 12H. WORK TO INC
|
| 02/06/2024 |
141025352 |
01 |
A2 |
J P/E DISAPPROVED |
04/22/2025 |
0043989 RA |
PIA |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APARTMENT 12H. WORK TO INCLUDE MODIFICATIONS TO INT
|
| 01/26/2021 |
140907446 |
02 |
A2 |
P APPROVED |
02/04/2021 |
|
LEONG-AK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 013
|
| 06/17/2020 |
140907446 |
01 |
A2 |
X SIGNED OFF |
05/20/2022 |
0016682 RA |
LEONG-AK |
|
NOT APPLICABLE
|
|
RENOVATION OF AN EXISTING APARTMENT AS PER PLANS. PLUMBING WORK TO BE FILE
|
|
Work on Floor(s): 013
|
| 05/06/2020 |
123911936 |
01 |
A2 |
X SIGNED OFF |
02/04/2021 |
0068272 PE |
ASIMAKIS |
|
NOT APPLICABLE
|
|
FILING FOR INTERIOR APARTMENT 4B RENOVATIONS AS SHOWN ON DRAWINGS FILED
|
|
Work on Floor(s): 4TH
|
| 03/19/2020 |
140892504 |
01 |
A2 |
D A/P ENTIRE |
03/19/2020 |
0068272 PE |
ASIMAKIS |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 05/18/2020 FILING FOR INTERIOR APARTMENT 4B RENOVATIONS AS SH
|
|
Work on Floor(s): 4TH
|
| 03/18/2020 |
140892185 |
01 |
A2 |
D A/P ENTIRE |
03/18/2020 |
0068272 PE |
ASIMAKIS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/19/2020 FILING FOR INTERIOR APARTMENT 4B RENOVATIONS AS S
|
|
Work on Floor(s): 4TH
|
| 11/08/2019 |
123687171 |
02 |
A2 |
P APPROVED |
12/19/2019 |
|
HOLMQUIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 007
|
| 05/31/2019 |
123687171 |
01 |
A2 |
X SIGNED OFF |
09/15/2020 |
0022198 RA |
HOLMQUIS |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APARTMENT 7F. WORK TO INCLUDE REPLACEMENT OF PLUMBI
|
|
Work on Floor(s): 007
|
| 03/21/2019 |
121851479 |
03 |
A2 |
D A/P ENTIRE |
04/30/2019 |
0071543 PE |
HALL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008
|
| 03/12/2019 |
123362191 |
02 |
A2 |
P APPROVED |
03/20/2019 |
|
BIXLER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 011
|
| 03/01/2018 |
123346067 |
03 |
A2 |
P APPROVED |
03/08/2018 |
|
CANNON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 017
|
| 02/20/2018 |
123362191 |
01 |
A2 |
X SIGNED OFF |
06/24/2019 |
0029345 RA |
BIXLER |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APARTMENT 11G. WORK TO INCLUDE REPLACEMENT OF PLUMB
|
|
Work on Floor(s): 011
|
| 02/06/2018 |
123207270 |
01 |
A2 |
X SIGNED OFF |
11/21/2018 |
0017944 RA |
RILEY |
|
NOT APPLICABLE
|
|
INTERIOR RESIDENITAL APARTMENT RENOVATION, INCLUDING KITCHEN & BATH AS PER
|
|
Work on Floor(s): 018
|
| 11/16/2017 |
123346067 |
02 |
A2 |
P APPROVED |
11/27/2017 |
|
CANNON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 017
|
| 07/19/2017 |
123346067 |
01 |
A2 |
X SIGNED OFF |
04/13/2018 |
0022618 RA |
CANNON |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APT 17C, INCLUDING NEW PARTITIONS AND DOORS AS SHOW
|
|
Work on Floor(s): 017
|
| 04/07/2017 |
122671992 |
01 |
A2 |
R PERMIT-ENTIRE |
06/26/2017 |
0032981 RA |
QUATELA |
|
NOT APPLICABLE
|
|
RENOVATION OF APT #18E INCLUDES MINOR PARTITION WORK, CABINETRY, NEW FINIS
|
|
Work on Floor(s): 018
|
| 02/01/2017 |
122981470 |
02 |
A2 |
P APPROVED |
02/03/2017 |
|
COOPER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 015
|
| 01/13/2017 |
121851479 |
02 |
A2 |
J P/E DISAPPROVED |
07/18/2017 |
0061006 PE |
THOMAS |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 05/29/2018 COMBINE APPARTMENTS 8C & 8D AT 8TH FLOOR. REDUCE
|
|
Work on Floor(s): 008
|
| 12/28/2016 |
122981470 |
01 |
A2 |
X SIGNED OFF |
07/11/2017 |
0016358 RA |
COOPER |
|
NOT APPLICABLE
|
|
RENOVATION OF APT #15C INCLUDES MINOR PARTITION WORK AND REPLACEMENT OF PL
|
|
Work on Floor(s): 015
|
| 04/29/2016 |
122771349 |
01 |
A2 |
X SIGNED OFF |
03/31/2017 |
0016966 RA |
GALLO |
|
NOT APPLICABLE
|
|
RENOVATION TO UNIT 12K TO INCLUDE REMOVAL AND INSTALLATION OF NON-LOAD BEA
|
|
Work on Floor(s): 012
|
| 01/06/2016 |
122617249 |
01 |
A2 |
X SIGNED OFF |
09/19/2017 |
0033807 RA |
SIDARI |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APARTMENT @19B, WORK TO INCLUDE NON-STRUCTURAL
|
|
Work on Floor(s): 019
|
| 10/16/2015 |
122533570 |
01 |
A2 |
X SIGNED OFF |
09/09/2016 |
0160022 RA |
RASMUSSE |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO RENOVATE APT. 6A. WORK TO INCLUDE REMOVAL OF INTERI
|
|
Work on Floor(s): 006
|
| 04/06/2015 |
140329954 |
01 |
A3 |
R PERMIT-ENTIRE |
04/09/2015 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS.
|
|
Work on Floor(s): OSP
|
| 01/06/2015 |
140295286 |
01 |
A3 |
R PERMIT-ENTIRE |
01/14/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALL SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE
|
|
Work on Floor(s): OSP
|
| 07/17/2014 |
122066708 |
01 |
A2 |
P APPROVED |
09/30/2014 |
0025149 RA |
HO |
|
NOT APPLICABLE
|
|
COMBINE APARTMENTS 2D,2E, & 2F. MINOR RENOVATIONS AT APT 2E & 2F. .
|
|
Work on Floor(s): 002
|
| 05/12/2014 |
121837584 |
02 |
A2 |
P APPROVED |
05/14/2014 |
|
JORDAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 010
|
| 02/27/2014 |
121668383 |
01 |
A2 |
X SIGNED OFF |
03/29/2017 |
0014327 RA |
ZIMMERMA |
|
NOT APPLICABLE
|
|
FACADE RESTORATION INCLUDING BALCONY REPAIRS, SILL REPLACEMENT, BRICK AND
|
|
Work on Floor(s): ROF 002 thru 018
|
| 01/16/2014 |
121837584 |
01 |
A2 |
X SIGNED OFF |
09/17/2014 |
0019580 RA |
JORDAN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF COOP APARTMENT #10E. WORK INCLUDE NON-STRUCTURAL
|
|
Work on Floor(s): 010
|
| 11/22/2013 |
121851479 |
01 |
A2 |
Q PERMIT-PARTIAL |
03/15/2019 |
0061006 PE |
THOMAS |
|
NOT APPLICABLE
|
|
COMBINE APARTMENTS 8C & 8D AT 8TH FLOOR. REDUCE OCCUPANCY TO 145 DWELLING
|
|
Work on Floor(s): 008
|
| 09/18/2013 |
121782400 |
01 |
A2 |
X SIGNED OFF |
04/29/2014 |
0024650 RA |
WEINREIC |
|
NOT APPLICABLE
|
|
FILING FOR INTERIOR APARTMENT RENOVATIONS. FILING FOR THE REMOVAL AND
|
|
Work on Floor(s): 015
|
| 05/03/2013 |
121608974 |
01 |
A2 |
J P/E DISAPPROVED |
05/10/2013 |
0061006 PE |
THOMAS |
|
NOT APPLICABLE
|
|
COMBING TWO (2) APARTMENTS 8C & 8D, INTERIOR RENOVATION AND PLUMBING
|
|
Work on Floor(s): 001 thru 008 009 thru 018
|
| 04/19/2013 |
121587871 |
01 |
A2 |
X SIGNED OFF |
12/11/2013 |
0031546 RA |
FERNANDE |
|
NOT APPLICABLE
|
|
RENOVATE EXISTING BATHROOM AND BEDROOM CLOSETS AS PER PLANS FILED. NO CHA
|
|
Work on Floor(s): 009
|
| 03/27/2013 |
140065621 |
01 |
A2 |
H P/E IN PROCESS |
03/27/2013 |
0031546 RA |
FERNANDE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/03/2013 NEW TILES AND FIXTURES IN BATHROOM, CLOSET REMODE
|
| 03/22/2013 |
140064588 |
01 |
A2 |
H P/E IN PROCESS |
03/22/2013 |
0031546 RA |
FERNANDE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/27/2013 NEW TILES AND FIXTURES IN BATHROOM, CLOSET REMODE
|
| 11/21/2012 |
121442331 |
01 |
A2 |
X SIGNED OFF |
08/07/2013 |
0026010 RA |
ANZALONE |
|
NOT APPLICABLE
|
|
INTERIOR ALTERATIONS TO EXISTING APARTMENT 5FG, INCLUDING INTERIOR
|
|
Work on Floor(s): 005
|
| 08/16/2012 |
121157719 |
01 |
A2 |
X SIGNED OFF |
01/31/2013 |
0036941 PE |
KUSNITZ |
|
NOT APPLICABLE
|
|
COMBINE APARTMENTS 6F AND 6G PROVIDE MINOR PARTITION CHANGES AND FINISHES
|
| 07/25/2012 |
121156890 |
01 |
A2 |
X SIGNED OFF |
08/29/2012 |
0030221 RA |
ROUSHAKE |
|
NOT APPLICABLE
|
|
LEGALIZE COMBINATION OF APARTMENTS 5F AND 5G. NO CHANGE TO OCCUPACY,USE, E
|
|
Work on Floor(s): 005
|
| 01/19/2012 |
120954967 |
01 |
A2 |
X SIGNED OFF |
09/26/2012 |
0015384 RA |
HUMPHREY |
|
NOT APPLICABLE
|
|
MINOR CONSTRUCTION IN APT #18A. DEMOLITION OF INTERIOR NON-LOAD BEARING
|
|
Work on Floor(s): 008
|
| 02/26/2011 |
120561766 |
02 |
A2 |
P APPROVED |
03/03/2011 |
|
LOCKWOOD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 019
|