FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
02/01/2023 |
110092916 |
02 |
A2 |
P APPROVED |
02/22/2023 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
03/22/2019 |
140838798 |
01 |
A2 |
X SIGNED OFF |
02/18/2021 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
REMODEL AND RENOVATE APT 4B ON THE FOURTH FLOOR. NO CHANGE IN USE EGRESS O
|
|
Work on Floor(s): 004
|
08/07/2018 |
140790972 |
01 |
A2 |
X SIGNED OFF |
09/24/2018 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
INSTALL NEW BACK FLOW DEVICE AND WATER BOOSTER PUMP AS PER PLANS. NYC DEP
|
|
Work on Floor(s): CEL
|
10/26/2016 |
140567795 |
01 |
A2 |
X SIGNED OFF |
10/24/2017 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
REMODEL AND RENOVATE APT 4C ON THE FOURTH FLOOR. NO CHANGE IN USE EGRESS O
|
|
Work on Floor(s): 004
|
10/23/2008 |
110127746 |
04 |
A2 |
P APPROVED |
10/23/2008 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REMODEL APARTMENT 5A,5B &5C ON THE 5TH FLOO
|
|
Work on Floor(s): 5
|
09/12/2008 |
110343236 |
01 |
A1 |
J P/E DISAPPROVED |
12/02/2008 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/22/2013 ADD A NEW SIXTH FLOOR ON TOP OF EXISTING FIVE STO
|
|
Work on Floor(s): 006
|
08/21/2008 |
110127746 |
03 |
A2 |
P APPROVED |
09/04/2008 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REMODEL APARTMENT 5B AND 5C ON THE 5TH FLOO
|
|
Work on Floor(s): 5
|
07/21/2008 |
110297330 |
01 |
A2 |
X SIGNED OFF |
09/30/2009 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
REMODEL APARTMENT 3B ON THE THIRD FLOOR. NO CHANGE TO USE, EGRESS, OR OCCU
|
|
Work on Floor(s): 003
|
04/30/2008 |
110127746 |
02 |
A2 |
P APPROVED |
05/06/2008 |
|
ROTHSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 5
|
03/27/2008 |
110127746 |
01 |
A2 |
X SIGNED OFF |
05/10/2010 |
0026466 RA |
ROTHSTEI |
|
NOT APPLICABLE
|
|
REMODEL APARTMENT 5A,5B &5C ON THE 5TH FLOOR. REPLACE 5TH FL CEILING & JOI
|
|
Work on Floor(s): 5
|
02/14/2008 |
110092916 |
01 |
A2 |
X SIGNED OFF |
03/23/2023 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
Remodel apartment 1C on the 1st floor. No change to use, egress, or occupa
|
|
Work on Floor(s): 001
|
11/09/2007 |
110018267 |
01 |
A2 |
X SIGNED OFF |
02/27/2008 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
Remodel apartment 3A on the 3rd floor. No change to use, egress, or occupa
|
|
Work on Floor(s): 003
|
08/16/2007 |
104774898 |
02 |
A2 |
P APPROVED |
08/28/2007 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
07/24/2007 |
104587341 |
03 |
A2 |
P APPROVED |
08/02/2007 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,002
|
05/22/2007 |
104774898 |
01 |
A2 |
X SIGNED OFF |
01/28/2010 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
Remodel apartment 3c on the 3rd floor. No change to use, egress, or occupa
|
|
Work on Floor(s): 003
|
03/13/2007 |
104696740 |
01 |
A2 |
X SIGNED OFF |
01/15/2008 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
Remodel apartment 1A on the 1st floor. Remodel apartment 4A on the 4th flo
|
|
Work on Floor(s): 001,004
|
03/06/2007 |
104587341 |
02 |
A2 |
P APPROVED |
03/13/2007 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REMODEL APARTMENT 1B ON THE FIRST FLOOR. RE
|
|
Work on Floor(s): 001,002
|
10/17/2006 |
104587341 |
01 |
A2 |
X SIGNED OFF |
10/12/2007 |
0026466 RA |
Rothstei |
|
NOT APPLICABLE
|
|
REMODEL APARTMENT 1B ON THE FIRST FLOOR. REMODEL APARTMENTS 2B AND 2C ON
|
|
Work on Floor(s): 001,002
|
10/02/2006 |
104567924 |
01 |
A3 |
X SIGNED OFF |
04/02/2013 |
0020419 RA |
Hulme |
|
NOT APPLICABLE
|
|
INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 25 FT LONG AT 147 EAST 90
|
|
Work on Floor(s): 001
|
10/02/2006 |
104565329 |
01 |
A3 |
X SIGNED OFF |
04/02/2013 |
0020419 RA |
Hulme |
|
NOT APPLICABLE
|
|
ERECT PIPE SCAFFOLD 50 FT LONG BY 50 FT HIGH AT 147 EAST 90 STREET - DUR
|
|
Work on Floor(s): 001
|
07/19/2002 |
103211720 |
01 |
SG |
P APPROVED |
12/31/2002 |
0024690 RA |
FIGUEROA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/22/2013 INSTALL WALL SIGNS NO CHANGE IN USE, EGR ESS OR O
|
|
Work on Floor(s): 1
|
10/17/1994 |
100573149 |
03 |
A1 |
P APPROVED |
11/04/1994 |
0016452 RA |
MARTINEZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
06/16/1994 |
100573149 |
02 |
A1 |
P APPROVED |
07/14/1994 |
0016452 RA |
MARTINEZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
01/06/1993 |
100573149 |
01 |
A1 |
X SIGNED OFF |
11/08/1995 |
0016452 RA |
MARTINEZ |
|
NOT APPLICABLE
|
|
CONVERSION OF CELLAR STORAGE SPACE INTO STORE SPACE, NEW TOILET AND
|
|
Work on Floor(s): CEL
|