 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 01/19/2012 |
110565594 |
PR |
E LAA FILED |
02/01/2012 |
OBI 004219 |
SANTORO |
|
EMERGENCY INSTALLATION OF ONE TEMPORARY 275 GSLLON OIL TANK. THE GAS SIDE
|
|
Work on Floor(s): CEL
|
| 01/19/2012 |
110565503 |
PR |
I LAA SIGNED OFF |
01/31/2012 |
MP 002145 |
ESCURRA |
|
PERFORM INTEGRITY TEST AND REPLACE APPROX 50' OF 3" & 40' OF 3/4" GAS PIPI
|
|
Work on Floor(s): CEL 001 thru 005
|
| 03/18/1997 |
101415087 |
PR |
I LAA SIGNED OFF |
05/02/1997 |
MP 000478 |
LEBNIKOF |
|
TO REPLACE DEFECTIVE SECTIONS OF GAS PIPING IN THE BASEMENT SUPPLYING GAS
|
|
Work on Floor(s): BSM
|