 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/21/2018 |
123517970 |
01 |
A3 |
J P/E DISAPPROVED |
09/27/2018 |
0018459 RA |
VAIL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/15/2025 BUILDER PAVEMENT PLAN IN CONJUNCTION WITH ALT I #
|
|
Work on Floor(s): OSP
|
| 07/12/2018 |
123580348 |
03 |
NB |
J P/E DISAPPROVED |
07/26/2018 |
0096368 PE |
SLOWIK |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 07/15/2025 SUBSEQUENT FILING FOR FOUNDATION AND STRUCTURAL W
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 07/12/2018 |
123476620 |
01 |
DM |
E AP-NPE |
07/12/2018 |
0096368 PE |
SLOWIK |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/14/2025 FULL DEMOLITION OF EXISTING 5-STORY WITH CELLAR R
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
| 07/12/2018 |
123580348 |
02 |
NB |
J P/E DISAPPROVED |
07/26/2018 |
0052834 PE |
SZAKAL |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 07/15/2025 SUBSEQUENT FILING FOR MECHANICAL, PLUMBING AND SP
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 006
|
| 07/12/2018 |
123580348 |
01 |
NB |
J P/E DISAPPROVED |
07/26/2018 |
0018459 RA |
VAIL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/15/2025 PROPOSED 6-STORY PLUS CELLAR 5 APARTMENTS NEW BUI
|
|
Work on Floor(s): CEL,OSP,ROF 001 thru 006
|