| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/19/2020 |
123492924 |
03 |
A2 |
P APPROVED |
08/25/2020 |
|
NEWBOLD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF,PH, PT1,PT2 001 thru 004
|
| 07/20/2020 |
123492915 |
04 |
A2 |
P APPROVED |
07/22/2020 |
|
OPPENHEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS,ROF,PH, PT1,PT2 001 thru 004
|
| 07/15/2020 |
123492915 |
03 |
A2 |
P APPROVED |
07/22/2020 |
|
KRAEHER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF,PH, PT1,PT2 001 thru 004
|
| 07/10/2020 |
123492924 |
02 |
A2 |
P APPROVED |
07/24/2020 |
|
NEWBOLD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF,PH, PT1,PT2 001 thru 004
|
| 03/21/2020 |
122815114 |
02 |
A2 |
P APPROVED |
11/16/2020 |
|
NEWBOLD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,PT1
|
| 08/01/2019 |
140862797 |
01 |
A3 |
X SIGNED OFF |
01/22/2021 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
NEEDLE BEAM SYSTEM PROPOSED INSTALLATION OF NEEDLE BEAM SYSTEM AS PER PLA
|
|
Work on Floor(s): OSP
|
| 02/21/2019 |
140833677 |
01 |
A3 |
X SIGNED OFF |
02/01/2021 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
WORK PLATFORM PROPOSED INSTALLATION OF WORK PLATFORM AS PER PLAN. NO CHAN
|
|
Work on Floor(s): OSP
|
| 01/24/2019 |
122815114 |
01 |
A2 |
X SIGNED OFF |
07/06/2022 |
0089878 PE |
NEWBOLD |
|
NOT APPLICABLE
|
|
ALTERATION TO THE EXISTING FIRE ALARM SYSTEM. NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): CEL,PT1
|
| 01/24/2019 |
123492942 |
01 |
A2 |
P APPROVED |
01/25/2019 |
0029300 RA |
KRAEHER |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/03/2020 MINOR ALTERATIONS IN THE CELLAR KITCHEN AND ASSOC
|
|
Work on Floor(s): CEL,BAS,PH, ROF
|
| 01/24/2019 |
123492915 |
01 |
A2 |
X SIGNED OFF |
08/27/2021 |
0029300 RA |
KRAEHER |
|
NOT APPLICABLE
|
|
INTERIOR AND EXTERIOR ARCHITECTURAL WORK ASSOCIATED WITH THE RENOVATION OF
|
|
Work on Floor(s): CEL,BAS,ROF,PH, PT1,PT2 001 thru 004
|
| 01/24/2019 |
123492924 |
01 |
A2 |
X SIGNED OFF |
07/13/2021 |
0089878 PE |
NEWBOLD |
|
NOT APPLICABLE
|
|
ALTERATION OF THE PLUMBING AND MECHANICAL SYSTEMS IN THE BUILDING. NO CHAN
|
|
Work on Floor(s): CEL,BAS,ROF,PH, PT1,PT2 001 thru 004
|
| 01/24/2019 |
123492942 |
02 |
A2 |
P APPROVED |
01/25/2019 |
0089878 PE |
NEWBOLD |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/03/2020 MINOR MODIFICATION OF MECHANICAL DUCT WORK. NO CH
|
|
Work on Floor(s): CEL,BAS,ROF,PH
|
| 01/24/2019 |
123492915 |
02 |
A2 |
X SIGNED OFF |
08/27/2021 |
0069888 PE |
OPPENHEI |
|
NOT APPLICABLE
|
|
INTERIOR AND EXTERIOR STRUCTURAL WORK ASSOCIATED WITH RENOVATION OF THE CH
|
|
Work on Floor(s): CEL,BAS,ROF,PH, PT1,PT2 001 thru 004
|
| 06/14/2016 |
122736227 |
01 |
A2 |
X SIGNED OFF |
11/15/2016 |
0012933 RA |
KINNEAR |
|
NOT APPLICABLE
|
|
PROPOSED FACADE RESTORATION, LINTEL REPLACEMENT, IN AN EXISTING BUILDING.
|
|
Work on Floor(s): OSP
|
| 05/04/2016 |
140491572 |
01 |
A3 |
X SIGNED OFF |
12/09/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WI
|
|
Work on Floor(s): OSP
|
| 03/18/2016 |
140472646 |
01 |
A3 |
X SIGNED OFF |
12/28/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BU
|
|
Work on Floor(s): OSP
|
| 03/16/2016 |
140470826 |
01 |
A3 |
X SIGNED OFF |
01/31/2017 |
0035839 RA |
O'CONNOR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 10/07/2015 |
110319637 |
09 |
A1 |
P APPROVED |
10/20/2015 |
|
EDELSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 09/04/2015 |
110319637 |
08 |
A1 |
P APPROVED |
09/25/2015 |
|
EDELSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 08/20/2015 |
110319637 |
07 |
A1 |
P APPROVED |
08/24/2015 |
|
EDELSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,PEN,ROF 001 thru 004
|
| 07/28/2015 |
122473803 |
01 |
A2 |
X SIGNED OFF |
03/30/2016 |
0018292 RA |
KRIEGEL |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW PLAY EQUIPMENT AT EXISTING ROOFTOP PLAY AREA. REPLACEM
|
|
Work on Floor(s): ROF
|
| 10/21/2014 |
110319637 |
06 |
A1 |
P APPROVED |
10/21/2014 |
|
EDELSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,PEN,ROF 001 thru 004
|
| 10/15/2014 |
120608976 |
02 |
PA |
P APPROVED |
10/17/2014 |
|
EDELSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 09/16/2014 |
110319637 |
05 |
A1 |
P APPROVED |
09/24/2014 |
|
EDELSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,PEN,ROF 001 thru 004
|
| 08/01/2014 |
101658555 |
04 |
A2 |
P APPROVED |
08/12/2014 |
0091566 PE |
MEADE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS,PEN,ROF 001 thru 004
|
| 07/25/2014 |
140212455 |
02 |
A3 |
P APPROVED |
07/29/2014 |
|
PARIHAR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 07/21/2014 |
102206952 |
04 |
A2 |
P APPROVED |
07/30/2014 |
|
EDELSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 07/08/2014 |
122061598 |
01 |
A2 |
X SIGNED OFF |
04/21/2015 |
0012933 RA |
KINNEAR, |
|
NOT APPLICABLE
|
|
PROPOSED FACADE REPAIR AS PER PLAN SUBMITTED. NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): FAC
|
| 06/14/2014 |
140212455 |
01 |
A3 |
X SIGNED OFF |
04/10/2015 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS.
|
|
Work on Floor(s): OSP
|
| 05/29/2014 |
140204892 |
01 |
A3 |
X SIGNED OFF |
04/09/2015 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 04/29/2013 |
110319637 |
04 |
A1 |
P APPROVED |
04/29/2013 |
|
EDELSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,PEN,ROF 001 thru 004
|
| 04/29/2013 |
110319637 |
03 |
A1 |
P APPROVED |
04/29/2013 |
|
EDELSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,PEN,ROF 001 thru 004
|
| 04/12/2011 |
120608976 |
01 |
PA |
U COMPLETED |
10/24/2014 |
0022986 RA |
EDELSTEI |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL
|
| 08/20/2008 |
110319637 |
02 |
A1 |
X SIGNED OFF |
02/10/2017 |
0016966 RA |
GALLO |
|
NOT APPLICABLE
|
|
SUBSEQUENT APPLICATION FOR MECHANICAL WORK, INSTALL VENTILATION SYSTEM.
|
|
Work on Floor(s): CEL,BAS,PEN,ROF 001 thru 004
|
| 08/20/2008 |
110319637 |
01 |
A1 |
X SIGNED OFF |
02/10/2017 |
0022986 RA |
EDELSTEI |
|
NOT APPLICABLE
|
|
ALT 1 APPLICATION FILED TO CHANGE USE OF FIRST FLOOR FROM CLASSROOMS TO OF
|
|
Work on Floor(s): CEL,001
|
| 06/12/2007 |
104799639 |
02 |
A2 |
X SIGNED OFF |
01/05/2009 |
0016966 RA |
GALLO |
|
NOT APPLICABLE
|
|
MECHANICAL WORK IN CONJUCTION WITHINTERIOR RENOVATION AS PER PLANS
|
|
Work on Floor(s): 1
|
| 06/12/2007 |
104799639 |
01 |
A2 |
X SIGNED OFF |
01/05/2009 |
0022986 RA |
EDELSTEI |
|
NOT APPLICABLE
|
|
PARTITION MODICATIONS AND MINOR PLUMBINGWORK AS PER PLANS NO CHANGES
|
|
Work on Floor(s): 1
|
| 03/23/2004 |
103739518 |
01 |
A2 |
X SIGNED OFF |
05/20/2005 |
0010379 RA |
Brezavar |
|
NOT APPLICABLE
|
|
Renovation of sanitary facilities in existing school occupying the 2nd - 4
|
|
Work on Floor(s): ROF 002 thru 004
|
| 03/31/2000 |
102859051 |
01 |
A2 |
X SIGNED OFF |
05/07/2014 |
0053541 PE |
Hahn |
|
NOT APPLICABLE
|
|
Install fire suppression system, as shown on plan.
|
|
Work on Floor(s): BAS
|
| 02/08/2000 |
102206952 |
03 |
A2 |
P APPROVED |
03/24/2014 |
0045265 PE |
BODAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,MEZ,GRD
|