| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/24/2019 |
140882025 |
01 |
A2 |
X SIGNED OFF |
01/20/2021 |
0028397 RA |
BARNETT |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APARTMENT INCLUDING NEW FIXTURES, FINISHES AND EQUI
|
|
Work on Floor(s): 015
|
| 06/11/2018 |
122127000 |
06 |
A2 |
P APPROVED |
06/13/2018 |
|
MILKIE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 016,PEN
|
| 12/12/2017 |
122127000 |
05 |
A2 |
P APPROVED |
12/19/2017 |
|
KWALBRUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 016,PEN
|
| 03/14/2017 |
122127000 |
04 |
A2 |
P APPROVED |
11/16/2017 |
|
KWALBRUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 016,PEN
|
| 03/13/2017 |
122999176 |
01 |
A2 |
X SIGNED OFF |
06/12/2017 |
0038964 PE |
GREEN |
|
NOT APPLICABLE
|
|
INSTALLATION OF 2 HVAC SPLIT SYSTEMS AND ASSOCIATED COMPONENTS, AS PER PLA
|
|
Work on Floor(s): BAS,001
|
| 05/30/2016 |
122238603 |
05 |
A2 |
P APPROVED |
06/02/2016 |
|
HESS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 04/20/2016 |
122238603 |
04 |
A2 |
P APPROVED |
04/25/2016 |
|
HESS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 11/18/2015 |
122238603 |
03 |
A2 |
P APPROVED |
12/08/2015 |
|
HESS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 10/07/2015 |
122238603 |
02 |
A2 |
P APPROVED |
11/06/2015 |
0021898 RA |
HESS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 10/06/2015 |
122525026 |
02 |
A3 |
P APPROVED |
10/09/2015 |
|
BLUM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 09/02/2015 |
122525026 |
01 |
A3 |
P APPROVED |
09/02/2015 |
0070885 PE |
BLUM |
|
NOT APPLICABLE
|
|
FILING OF SITE SAFETY PLANS AS SHOWN HEREWITH. NO CHANGE TO EGRESS, OCCUPA
|
|
Work on Floor(s): FAC
|
| 08/11/2015 |
140387775 |
01 |
A3 |
X SIGNED OFF |
03/14/2016 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN. NO CHAN
|
|
Work on Floor(s): OSP
|
| 07/02/2015 |
122437933 |
02 |
A2 |
X SIGNED OFF |
07/15/2016 |
0053349 PE |
NERENBER |
|
NOT APPLICABLE
|
|
FILING MECHANICAL MODIFICATIONS TO APT #3A AS PER PLANS FILED HEREWITH. N
|
|
Work on Floor(s): 003
|
| 07/02/2015 |
122437933 |
01 |
A2 |
X SIGNED OFF |
07/15/2016 |
0023542 RA |
KRSUL |
|
NOT APPLICABLE
|
|
FILING TO RENOVATE APT #3A WITH PARTITION CHANGES AND MINOR PLUMBING
|
|
Work on Floor(s): 003
|
| 06/29/2015 |
122445666 |
01 |
A2 |
X SIGNED OFF |
03/23/2016 |
0070885 PE |
BLUM |
|
NOT APPLICABLE
|
|
FACADE REPAIRS AS SHOWN ON PLANS HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY
|
|
Work on Floor(s): FAC
|
| 02/20/2015 |
140204302 |
02 |
A2 |
P APPROVED |
02/24/2015 |
|
GOODSPEE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
| 02/03/2015 |
122238603 |
01 |
A2 |
X SIGNED OFF |
07/25/2016 |
0021898 RA |
HESS |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AND COMBINATION OF EXISTING APARTMENTS #5C AND #5D (AS
|
|
Work on Floor(s): 005
|
| 10/28/2014 |
122127000 |
03 |
A2 |
X SIGNED OFF |
06/28/2018 |
0006211 PE |
HO |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK TO CONSIST OF INSTALLATION OF NEW INTERIOR STAIR FROM 16 T
|
|
Work on Floor(s): 016,PEN
|
| 10/28/2014 |
122127000 |
02 |
A2 |
X SIGNED OFF |
06/28/2018 |
0052617 PE |
KWALBRUN |
|
NOT APPLICABLE
|
|
HVAC AND PLUMBING WORK ASSOCIATED WITH COMBINING OF APTS. 16B & PHB. NO C
|
|
Work on Floor(s): 016,PEN
|
| 10/28/2014 |
122127000 |
01 |
A2 |
X SIGNED OFF |
06/28/2018 |
0016595 RA |
MILKIE |
|
NOT APPLICABLE
|
|
COMBINING OF APTS. 16B & PHB TO CONSIST OF INTERIOR DEMOLITION, RENOVATION
|
|
Work on Floor(s): 016,PEN
|
| 07/20/2014 |
140204302 |
01 |
A2 |
R PERMIT-ENTIRE |
06/07/2016 |
0016973 RA |
GOODSPEE |
|
NOT APPLICABLE
|
|
APARTMENT RENOVATION INCLUDING REMOVAL AND REPLACEMENT OF EXISTING PARTITI
|
| 12/12/2013 |
121839564 |
01 |
A2 |
X SIGNED OFF |
10/14/2014 |
0019580 RA |
JORDAN |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING CO-OP APARTMENT #4CD. WORK TO INCLUDE NON-SRUCTURAL
|
|
Work on Floor(s): 004
|
| 05/28/2013 |
121586006 |
01 |
A2 |
X SIGNED OFF |
06/10/2016 |
0047135 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
REPLACEMENT (1) NEW COMBINATION GAS/OIL BURNER ON EXISTING BOILER. NEW LOW
|
|
Work on Floor(s): CEL,BOI,RM
|
| 05/28/2013 |
140071776 |
02 |
A2 |
P APPROVED |
05/29/2013 |
|
ZENREICH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 FILING TO SHOW APARTMENT COMBINATION ON THE
|
|
Work on Floor(s): 004
|
| 04/30/2013 |
140071776 |
01 |
A2 |
X SIGNED OFF |
06/26/2013 |
0016554 RA |
ZENREICH |
|
NOT APPLICABLE
|
|
FILING TO SHOW APARTMENT COMBINATION ON THE 4TH FLOOR OF APARTMENT 4C AND
|
|
Work on Floor(s): 004
|
| 02/12/2013 |
121076245 |
06 |
A2 |
P APPROVED |
02/15/2013 |
|
MANDARA, |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 07/10/2012 |
121076245 |
05 |
A2 |
P APPROVED |
07/12/2012 |
|
MANDARA, |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 07/03/2012 |
121076245 |
04 |
A2 |
P APPROVED |
07/05/2012 |
|
MANDARA, |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 07/02/2012 |
121135440 |
01 |
A2 |
R PERMIT-ENTIRE |
08/06/2012 |
0029623 RA |
DEBOER |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO RENOVATE APT. 9AB. WORK TO INCLUDE REMOVAL OF
|
|
Work on Floor(s): 009
|
| 05/16/2012 |
121076245 |
03 |
A2 |
P APPROVED |
06/22/2012 |
0030307 RA |
MANDARA, |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 07/05/2012 STRUCTURAL WORK IN APARTMENT 5-B TO PROVIDE MASON
|
|
Work on Floor(s): 005
|
| 05/14/2012 |
121076245 |
02 |
A2 |
P APPROVED |
06/22/2012 |
0030307 RA |
MANDARA |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 07/05/2012 SUBSEQUENT APPLICATION FOR MECHANICAL WORK IN APA
|
|
Work on Floor(s): 005
|
| 05/14/2012 |
121076245 |
01 |
A2 |
X SIGNED OFF |
06/21/2013 |
0030307 RA |
MANDARA, |
|
NOT APPLICABLE
|
|
APPLICATION BEING FILED FOR GENERAL CONSTRUCTION AND PLUMBING WORK IN APAR
|
|
Work on Floor(s): 005
|
| 04/26/2012 |
121183174 |
01 |
A1 |
J P/E DISAPPROVED |
06/14/2012 |
0016325 RA |
BAKSA |
|
PENDING
|
|
16TH FLOOR ENLARGEMENT, REMOVAL AND GENERAL CONSTRUCTION WORK. NO CHANGE I
|
| 04/16/2012 |
121048366 |
01 |
A2 |
X SIGNED OFF |
03/06/2013 |
0029092 RA |
CUNNINGH |
|
NOT APPLICABLE
|
|
RENOVATION OF APT # 15A,INCLUDING REPLACEMENT OF PLUMBING FIXTURES. NO CHA
|
|
Work on Floor(s): 015
|
| 05/21/2011 |
120593223 |
03 |
A2 |
P APPROVED |
05/23/2011 |
|
HEMMERIC |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
| 04/21/2011 |
120593223 |
02 |
A2 |
P APPROVED |
04/25/2011 |
|
HEMMERIC |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
| 02/02/2011 |
120593223 |
01 |
A2 |
X SIGNED OFF |
06/21/2011 |
0011749 RA |
HEMMERIC |
|
NOT APPLICABLE
|
|
MINOR RENOVATIONS IN APT 7C. REPLACE AND RELOCATE NON BEARING PARTITIONS A
|
| 07/10/2009 |
120101745 |
01 |
A2 |
X SIGNED OFF |
07/08/2010 |
0019559 RA |
HEYDEN |
|
NOT APPLICABLE
|
|
MINOR RENOVATIONS IN APT 2A. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): 2FL
|
| 04/01/2009 |
120000248 |
01 |
A2 |
X SIGNED OFF |
04/10/2012 |
0047135 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
REPLACEMENT (1) NEW 8800 GALLON OIL TANK IN EXISTING 3HR ENCLOSURE IN SAME
|
|
Work on Floor(s): CEL,BOI
|
| 05/04/2007 |
104754641 |
01 |
A2 |
X SIGNED OFF |
07/27/2009 |
0029623 RA |
DEBOER |
|
NOT APPLICABLE
|
|
NO CHANGE IN USE, EGRESS OR OCCUPANCY. COMBIN TWO APARTMENTS. REMOVE AND
|
|
Work on Floor(s): 009
|