 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/11/2021 |
140997811 |
01 |
A3 |
X SIGNED OFF |
02/10/2023 |
0088950 PE |
ACAR |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY CONSTRUCTION METAL SHANTY AS PER PLANS. NO CHANG
|
|
Work on Floor(s): OSP
|
| 04/28/2020 |
140898562 |
01 |
A2 |
R PERMIT-ENTIRE |
06/23/2020 |
0032438 RA |
BJORNEBY |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING STORE, SCOPE OF WORK TO INCLUDE MINOR PART
|
|
Work on Floor(s): 001
|
| 01/23/2020 |
140883426 |
01 |
A2 |
R PERMIT-ENTIRE |
02/27/2020 |
0028025 RA |
SCHAEFER |
|
NOT APPLICABLE
|
|
FILING TO PROPOSE RENOVATIONS TO PENTHOUSE APT#17. REMOVE INTERIOR NON-LOA
|
|
Work on Floor(s): PH
|
| 01/06/2020 |
140814288 |
02 |
A2 |
P APPROVED |
02/18/2020 |
|
SIGUENZA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 011
|
| 03/18/2019 |
140673518 |
03 |
A2 |
P APPROVED |
03/21/2019 |
|
RUDIKOFF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004,005,008,015
|
| 11/18/2018 |
140814288 |
01 |
A2 |
X SIGNED OFF |
03/10/2020 |
0231701 RA |
SIGUENZA |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APT. 11 AS PER PLANS FILED HEREWITH. NO CHANGE IN U
|
|
Work on Floor(s): 011
|
| 09/20/2018 |
123140840 |
03 |
A2 |
P APPROVED |
10/24/2018 |
|
ZUNINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF,007
|
| 09/06/2018 |
140673518 |
02 |
A2 |
P APPROVED |
09/11/2018 |
|
RUDIKOFF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004,005,008,015
|
| 09/12/2017 |
123140840 |
02 |
A2 |
X SIGNED OFF |
02/05/2019 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EG
|
|
Work on Floor(s): 007
|
| 09/12/2017 |
123140840 |
01 |
A2 |
X SIGNED OFF |
02/05/2019 |
0038161 RA |
ZUNINO |
|
NOT APPLICABLE
|
|
REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AND PLUMBING FIXTURE
|
|
Work on Floor(s): ROF,007
|
| 07/25/2017 |
140673518 |
01 |
A2 |
X SIGNED OFF |
04/09/2019 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
FILE FOR FOUR (4) RESIDENTIAL GAS DRYERS IN APARTMENTS. ALL GAS DRYER VENT
|
|
Work on Floor(s): 004,005,008,015
|
| 01/26/2017 |
122882666 |
02 |
A2 |
P APPROVED |
02/06/2018 |
|
YU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 09/06/2016 |
122882666 |
01 |
A2 |
Q PERMIT-PARTIAL |
01/18/2018 |
0036490 RA |
YU |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING STORE, INCLUDING REMOVAL & INSTALLATION OF PARTITIO
|
|
Work on Floor(s): 001
|
| 07/07/2016 |
122826068 |
01 |
A2 |
R PERMIT-ENTIRE |
07/14/2016 |
0036490 RA |
YU |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING STORE, REMOVAL OF PARTITION & PLUMBING FIXTURES,
|
|
Work on Floor(s): 001
|
| 05/23/2014 |
121414861 |
02 |
A2 |
P APPROVED |
06/30/2014 |
|
ACCARDO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 02/04/2014 |
121459974 |
03 |
A3 |
P APPROVED |
02/06/2014 |
|
HICKEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 09/04/2013 |
121426634 |
03 |
A3 |
P APPROVED |
09/05/2013 |
|
HICKEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 07/26/2013 |
121459974 |
02 |
A3 |
P APPROVED |
07/26/2013 |
|
HICKEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 07/26/2013 |
121426634 |
02 |
A3 |
P APPROVED |
07/26/2013 |
|
HICKEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 04/09/2013 |
121583241 |
01 |
A3 |
X SIGNED OFF |
01/14/2015 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
FILING FOR TSP FOR THE ALTERATION WORK BEING PERFORMED UNDER 121414861
|
|
Work on Floor(s): FAC
|
| 12/13/2012 |
121459974 |
01 |
A3 |
X SIGNED OFF |
06/16/2014 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF STEEL PIPE SCAFFOLD AS PER PLANS. DURING REMEDIAL REPAIRS.
|
|
Work on Floor(s): OSP
|
| 11/28/2012 |
121426634 |
01 |
A3 |
X SIGNED OFF |
06/16/2014 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED APPROXIMATELY 160 L.F AS PER PLAN
|
|
Work on Floor(s): OSP
|
| 10/18/2012 |
121414861 |
01 |
A2 |
X SIGNED OFF |
08/20/2014 |
0745841 PE |
ACCARDO |
|
NOT APPLICABLE
|
|
REMOVE AND REPLACE DAMAGED MASONRY AND LINTELS AT SPOT LOCATIONS AT EACH F
|
|
Work on Floor(s): FAC
|
| 10/03/2012 |
121399520 |
01 |
A3 |
X SIGNED OFF |
01/29/2014 |
0060597 PE |
SHAPIRO |
|
NOT APPLICABLE
|
|
TO ERECT TEMPORARY OVERHEAD PROTECTION. THIS APPPLICATION INVOLVES NO CHA
|
|
Work on Floor(s): GR
|
| 10/03/2012 |
121398914 |
01 |
A2 |
X SIGNED OFF |
05/20/2015 |
0067582 PE |
HINES |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY CHIMNEY SUPPORT AS SHOWN ON DRAWINGS FILED HEREW
|
|
Work on Floor(s): 008 thru 016
|
| 06/29/2012 |
121125362 |
01 |
A3 |
X SIGNED OFF |
01/29/2014 |
0060597 PE |
SHAPIRO |
|
NOT APPLICABLE
|
|
TO INSTALL TEMPORARY ROOF PROTECTION. THIS APPLICATION INVOLVES NO CHANGE
|
|
Work on Floor(s): ROF
|
| 02/01/2012 |
120966455 |
01 |
A2 |
X SIGNED OFF |
09/30/2014 |
0060597 PE |
SHAPIRO |
|
NOT APPLICABLE
|
|
INSTALLATION OF TIE BACKS AT EXISTING PARTY WALL TO STABILIZE DURING DEMOL
|
|
Work on Floor(s): 001 thru 006
|
| 08/19/2010 |
120447347 |
01 |
A2 |
X SIGNED OFF |
09/15/2011 |
0025773 RA |
BRIGUET |
|
NOT APPLICABLE
|
|
RENOVATION OF AN EXISTING APARTMENT.WORK INCLUDED GENERAL CONSTRUCTION,
|
|
Work on Floor(s): 014
|
| 08/24/2009 |
120138993 |
01 |
A3 |
X SIGNED OFF |
11/16/2010 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED APPROXIMATELY 43'LONG BY 12'TALL
|
|
Work on Floor(s): 001
|
| 05/06/2009 |
120030705 |
02 |
A2 |
X SIGNED OFF |
01/20/2010 |
0066073 PE |
GUTH |
|
NOT APPLICABLE
|
|
INSTALLATION OF A/C UNIT AND ASSOCIATED DUCTWORK AND PLUMBING WORK ON TH
|
|
Work on Floor(s): 016
|
| 05/06/2009 |
120030705 |
01 |
A2 |
X SIGNED OFF |
01/20/2010 |
0018857 RA |
BISHOP |
|
NOT APPLICABLE
|
|
REMOVAL AND INSTALLATION OF PARTITIONS, DOORS, FLOORS, CEILINGS AND FINI
|
|
Work on Floor(s): 016
|
| 03/23/2009 |
110480792 |
01 |
A2 |
R PERMIT-ENTIRE |
04/26/2017 |
0024195 RA |
BLANCHFI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/27/2019 REPLACE EXISTING GLASS STRUCTURE.NO CHANGE IN USE
|
|
Work on Floor(s): 016
|
| 03/17/2009 |
110279154 |
02 |
A2 |
P APPROVED |
04/07/2009 |
|
ACCARDO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 01/22/2009 |
104483667 |
06 |
A2 |
P APPROVED |
02/27/2009 |
|
Bohan |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 011
|
| 09/26/2008 |
110279154 |
01 |
A2 |
X SIGNED OFF |
02/25/2010 |
0745841 PE |
ACCARDO |
|
NOT APPLICABLE
|
|
INSTALLATION OF AN ANTIFLOW DEVICE AT THE WATER MAIN. NO CHANGE IN USE, EG
|
|
Work on Floor(s): CEL
|
| 05/30/2008 |
104483667 |
05 |
A2 |
P APPROVED |
06/20/2008 |
|
Bohan |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 011
|
| 04/25/2008 |
110191907 |
01 |
A3 |
X SIGNED OFF |
08/13/2009 |
OT |
DEL MAST |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED 60' LONG DURING FACADE RESTORATIO
|
|
Work on Floor(s): 1
|
| 01/11/2008 |
104802359 |
02 |
A2 |
P APPROVED |
11/13/2008 |
0074584 PE |
ACCARDO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REPLACE DAMAGED STEEL AT MAIN ROOF BULK- HE
|
|
Work on Floor(s): ROF,FAC,ADE
|
| 10/24/2007 |
104483667 |
04 |
A2 |
P APPROVED |
11/30/2007 |
0021173 RA |
Bohan |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 011
|
| 07/05/2007 |
104823112 |
01 |
A2 |
R PERMIT-ENTIRE |
07/10/2007 |
0078226 PE |
MACUTAY |
|
NOT APPLICABLE
|
|
INSTALL TEMP STRCTRL SHORTING FOR EXISTING ROOF MOUNTED WATER TANK. P
|
|
Work on Floor(s): ROF
|