| 10/16/2015 |
121905493 |
02 |
A2 |
M P/E PAA $ RESOLV |
02/08/2016 |
|
GEIGER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 12/24/2014 |
122238088 |
01 |
A2 |
R PERMIT-ENTIRE |
01/14/2015 |
0039622 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
INSTALL REPLACEMENT GAS BOILER AND HOT WATER HEATER. CONNECT TO EXISTING
|
|
Work on Floor(s): CEL
|
| 02/03/2014 |
121905493 |
01 |
A2 |
R PERMIT-ENTIRE |
08/06/2014 |
0061152 PE |
GEIGER |
|
NOT APPLICABLE
|
|
LOWERING CELLAR FLOOR SLAB. ALL AS PER PLANS. NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): CEL
|
| 07/17/2008 |
110230991 |
01 |
A3 |
R PERMIT-ENTIRE |
07/18/2008 |
0020419 RA |
HULME |
|
NOT APPLICABLE
|
|
INSTALL SIDEWALK SHED A TOTAL OF 20 L.F AT 121 EAST 79 STREET. DURING REME
|
|
Work on Floor(s): 001
|
| 07/17/2003 |
103516143 |
01 |
A2 |
R PERMIT-ENTIRE |
08/29/2003 |
0065106 PE |
Sharon |
|
NOT APPLICABLE
|
|
New concrete deck on top of existing roof at second floor terrace, and on
|
|
Work on Floor(s): 002,ROF
|
| 11/24/1998 |
101512695 |
04 |
A1 |
P APPROVED |
12/16/1998 |
0022475 RA |
KANNER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 005
|
| 08/28/1997 |
101512695 |
03 |
A1 |
G PAA FEE DUE |
08/28/1997 |
0022475 RA |
KANNER |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 10/21/1997
|
|
Work on Floor(s): CEL 001 thru 005
|
| 04/08/1997 |
101512695 |
01 |
A1 |
X SIGNED OFF |
01/18/2000 |
0022475 RA |
KANNER |
|
NOT APPLICABLE
|
|
EXISTING DOCTOR'S OFFICE AND 3 CLASS "A" APARTMENTS TO BE CONVERTED
|
|
Work on Floor(s): CEL 001 thru 005
|
| 04/07/1997 |
101512695 |
02 |
A1 |
X SIGNED OFF |
01/18/2000 |
0065106 PE |
SHARON |
|
NOT APPLICABLE
|
|
ALL STRUCTURAL AND MECHANICAL WORK AS PE R PLANS.
|
|