 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/06/2023 |
123847392 |
12 |
A1 |
P APPROVED |
09/11/2023 |
|
SAVARESE |
|
AMENDED 11/07/2022
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 011
|
| 07/03/2023 |
123847392 |
11 |
A1 |
P APPROVED |
07/10/2023 |
|
SAVARESE |
|
AMENDED 11/07/2022
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 011
|
| 06/23/2023 |
123847392 |
10 |
A1 |
P APPROVED |
06/29/2023 |
0020632 RA |
SAVARESE |
|
AMENDED 11/07/2022
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 011
|
| 03/23/2023 |
141020678 |
04 |
A2 |
P APPROVED |
03/24/2023 |
|
SCHMERZL |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 11/02/2023
|
|
Work on Floor(s): CEL,ROF 001 thru 011
|
| 02/06/2023 |
141020678 |
03 |
A2 |
P APPROVED |
02/07/2023 |
|
SCHMERZL |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 11/02/2023
|
|
Work on Floor(s): CEL,ROF 001 thru 011
|
| 01/05/2023 |
141020678 |
02 |
A2 |
P APPROVED |
01/06/2023 |
|
SCHMERZL |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 11/02/2023
|
|
Work on Floor(s): CEL,ROF 001 thru 011
|
| 11/29/2022 |
123847392 |
09 |
A1 |
P APPROVED |
12/06/2022 |
|
DIAZ |
|
AMENDED 11/07/2022
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 011
|
| 09/16/2022 |
141020678 |
01 |
A2 |
P APPROVED |
09/16/2022 |
0020635 RA |
SCHMERZL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/02/2023 RESPECTFULLY REQUESTING TO FILE TPP IN CONJUNCTIO
|
|
Work on Floor(s): CEL,ROF 001 thru 011
|
| 08/25/2022 |
123847392 |
08 |
A1 |
P APPROVED |
11/07/2022 |
|
DIAZ |
|
AMENDED 11/07/2022
|
|
POST APPROVAL AMENDMENT FOR 01 FILING TO RENOVATE EXISTING BUILDING TO RED
|
|
Work on Floor(s): CEL,ROF 001 thru 011
|
| 05/17/2022 |
121253712 |
01 |
SC |
U COMPLETED |
06/01/2022 |
0029753 RA |
DIAZ |
|
NOT APPLICABLE
|
|
SUDVIDING EXISTING TAX LOT INTO TWENTY THREE (23) CONDO TAX LOTS. NO CHANG
|
| 10/31/2021 |
140988279 |
02 |
A3 |
P APPROVED |
11/03/2021 |
|
O'CONNOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 10/12/2021 |
141004099 |
01 |
A2 |
P APPROVED |
10/12/2021 |
0020635 RA |
SCHMERZL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/26/2022 ALTERATION TYPE 2 FILED HEREWITH FOR TEMPORARY EG
|
|
Work on Floor(s): 003
|
| 06/10/2021 |
123847392 |
07 |
A1 |
P APPROVED |
06/28/2021 |
|
DIAZ |
|
AMENDED 11/07/2022
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 011
|
| 02/16/2021 |
140932784 |
02 |
A2 |
P APPROVED |
02/22/2021 |
|
LAMPARD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 010
|
| 01/25/2021 |
123847392 |
06 |
A1 |
P APPROVED |
02/08/2021 |
|
DIAZ |
|
AMENDED 11/07/2022
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 011
|
| 01/20/2021 |
140882329 |
02 |
A3 |
P APPROVED |
01/21/2021 |
0035839 RA |
O'CONNOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 01/13/2021 |
140988279 |
01 |
A3 |
X SIGNED OFF |
10/12/2022 |
0084781 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
INSTALLATION OF PERSONNEL/MATERIAL HOIST FOR PEDESTRIAN AND WORKER SAFETY
|
|
Work on Floor(s): OSP
|
| 01/08/2021 |
140996554 |
01 |
A3 |
X SIGNED OFF |
09/13/2023 |
0084781 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
INSTALLATION OF ROOF PROTECTION FOR ADJACENT PROPERTY DURING NEW BUILDING
|
|
Work on Floor(s): OSP
|
| 11/19/2020 |
140980990 |
01 |
A3 |
R PERMIT-ENTIRE |
03/02/2021 |
0084781 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
INSTALLATION OF OVER HEAD PROTECTION FOR ADJACENT PROPERTY DURING NEW BUIL
|
|
Work on Floor(s): OSP
|
| 10/19/2020 |
123847392 |
05 |
A1 |
P APPROVED |
10/26/2020 |
0082265 PE |
WONG |
|
AMENDED 11/07/2022
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL
|
| 10/19/2020 |
123847392 |
04 |
A1 |
P APPROVED |
10/26/2020 |
0090583 PE |
LAMPARD |
|
AMENDED 11/07/2022
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): OSP
|
| 08/21/2020 |
140932784 |
01 |
A2 |
X SIGNED OFF |
05/17/2023 |
0090583 PE |
LAMPARD |
|
NOT APPLICABLE
|
|
FILED HEREWITH PLANS & APPLICATIONS FOR INTERIOR STRUCTURAL PARTIAL DEMOLI
|
|
Work on Floor(s): CEL 001 thru 010
|
| 07/24/2020 |
140920822 |
01 |
A3 |
X SIGNED OFF |
10/12/2022 |
0090583 PE |
LAMPARD |
|
NOT APPLICABLE
|
|
MECHANICAL EQUIPMENT BEING USED IN CONJUNCTION WITH PARTIAL DEMOLITION. FI
|
|
Work on Floor(s): CEL,ROF 001 thru 010
|
| 06/11/2020 |
140908686 |
01 |
A2 |
P APPROVED |
08/05/2020 |
0090583 PE |
LAMPARD |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/26/2022 HEREBY FILING A TENANT PROTECTION PLAN TO IDENTIF
|
|
Work on Floor(s): CEL,PEN,ROF 001 thru 010
|
| 04/17/2020 |
123856942 |
01 |
A2 |
X SIGNED OFF |
07/01/2021 |
0090583 PE |
LAMPARD |
|
NOT APPLICABLE
|
|
FILED HEREWITH PLANS & APPLICATIONS FOR INTERIOR NON-LOAD BEARING DEMOLITI
|
|
Work on Floor(s): CEL 001 thru 010
|
| 03/23/2020 |
140892899 |
01 |
A2 |
H P/E IN PROCESS |
03/23/2020 |
0090583 PE |
LAMPARD |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 05/22/2020 HEREBY FILING A TENANT PROTECTION PLAN TO IDENTIFY
|
|
Work on Floor(s): CEL,PEN,ROF 001 thru 010
|
| 02/28/2020 |
123847392 |
03 |
A1 |
R PERMIT-ENTIRE |
12/02/2020 |
0082265 PE |
WONG |
|
AMENDED 11/07/2022
|
|
FILED HEREWITH SUBSEQUENT DOCUMENT FOR FOUNDATION WORK ONLY. FILED IN
|
|
Work on Floor(s): CEL
|
| 02/10/2020 |
140886762 |
01 |
A3 |
D A/P ENTIRE |
02/10/2020 |
0029753 RA |
DIAZ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/24/2020 FILED HEREWITH BUILDERS PAVEMENT PLAN. FRONTAGE 1
|
|
Work on Floor(s): OSP
|
| 02/10/2020 |
140886753 |
01 |
A3 |
D A/P ENTIRE |
02/10/2020 |
0029753 RA |
DIAZ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/10/2020 FILED HEREWITH BUILDERS PAVEMENT PLAN. FRONTAGE 1
|
|
Work on Floor(s): OSP
|
| 01/30/2020 |
140884782 |
01 |
A2 |
H P/E IN PROCESS |
01/30/2020 |
0090583 PE |
LAMPARD |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 03/24/2020 FILED HEREWITH PLANS & APPLICATIONS FOR INTERIOR N
|
|
Work on Floor(s): CEL 001 thru 010
|
| 01/29/2020 |
123847392 |
02 |
A1 |
R PERMIT-ENTIRE |
12/02/2020 |
0090583 PE |
LAMPARD |
|
AMENDED 11/07/2022
|
|
FILED HEREWITH SUBSEQUENT DOCUMENT FOR SOE WORK ONLY. FILED IN CONJUNCTION
|
|
Work on Floor(s): OSP
|
| 01/24/2020 |
140884773 |
01 |
A2 |
D A/P ENTIRE |
01/24/2020 |
0090583 PE |
LAMPARD |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/27/2020 FILED HEREWITH PLANS & APPLICATIONS FOR INTERIOR
|
|
Work on Floor(s): CEL 001 thru 010
|
| 01/24/2020 |
140884764 |
01 |
A2 |
H P/E IN PROCESS |
01/24/2020 |
0090583 PE |
LAMPARD |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/27/2020 FILED HEREWITH PLANS & APPLICATIONS FOR INTERIOR
|
|
Work on Floor(s): CEL 001 thru 010
|
| 01/24/2020 |
140884737 |
01 |
A2 |
H P/E IN PROCESS |
01/24/2020 |
0090583 PE |
LAMPARD |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/27/2020 FILED HEREWITH PLANS & APPLICATIONS FOR INTERIOR
|
|
Work on Floor(s): CEL 001 thru 010
|
| 01/24/2020 |
140884728 |
01 |
A2 |
H P/E IN PROCESS |
01/24/2020 |
0090583 PE |
LAMPARD |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/27/2020 FILED HEREWITH PLANS & APPLICATIONS FOR INTERIOR
|
|
Work on Floor(s): CEL 001 thru 010
|
| 12/31/2019 |
140882329 |
01 |
A3 |
X SIGNED OFF |
01/22/2021 |
0035839 RA |
O'CONNOR |
|
NOT APPLICABLE
|
|
PROPOSED TEMP. MOCK-UP SCAFFOLD AS PER PLANS. NO CHANGE IN USE EGRESS OR
|
|
Work on Floor(s): ROF
|
| 12/20/2019 |
123847392 |
01 |
A1 |
R PERMIT-ENTIRE |
04/20/2023 |
0020632 RA |
SAVARESE |
|
AMENDED 11/07/2022
|
|
FILING TO RENOVATE EXISTING BUILDING TO REDUCE NUMBER OF DWELLING UNITS, C
|
|
Work on Floor(s): CEL,ROF 001 thru 011
|
| 03/27/2019 |
121904270 |
02 |
A3 |
P APPROVED |
04/09/2019 |
|
O'CONNOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): EXT
|
| 03/27/2019 |
121793620 |
02 |
A3 |
P APPROVED |
04/09/2019 |
|
O'CONNOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): EXT
|
| 03/27/2019 |
121905233 |
02 |
A3 |
P APPROVED |
04/09/2019 |
|
O'CONNOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): EXT
|