| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/03/2020 |
123889925 |
05 |
A2 |
P APPROVED |
09/09/2020 |
|
ROSATO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 007
|
| 04/23/2020 |
123889925 |
04 |
A2 |
P APPROVED |
08/21/2020 |
0040210 RA |
ROSATO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 007
|
| 01/16/2020 |
123889925 |
03 |
A2 |
P APPROVED |
01/24/2020 |
0040210 RA |
ROSATO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 007
|
| 09/20/2019 |
123504467 |
03 |
A2 |
P APPROVED |
09/25/2019 |
0009270 RA |
MORPURGO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): PH
|
| 05/24/2019 |
123032208 |
05 |
A2 |
P APPROVED |
06/05/2019 |
|
AGELOFF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 04/22/2019 |
123889925 |
01 |
A2 |
X SIGNED OFF |
10/05/2020 |
0021752 RA |
STANDING |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING RESIDENTIAL APARTMENT ON 7TH FLOOR. ARCHITECTURAL W
|
|
Work on Floor(s): 007
|
| 04/22/2019 |
123889925 |
02 |
A2 |
X SIGNED OFF |
10/05/2020 |
0040210 RA |
ROSATO |
|
NOT APPLICABLE
|
|
MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF EXISTING
|
|
Work on Floor(s): 007
|
| 03/26/2019 |
123032208 |
04 |
A2 |
P APPROVED |
04/08/2019 |
|
AGELOFF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 01/11/2019 |
123169114 |
03 |
A2 |
P APPROVED |
02/04/2019 |
|
DIVILIO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 011
|
| 11/05/2018 |
140816302 |
01 |
A3 |
P APPROVED |
11/05/2018 |
0063593 PE |
ONYEAGOR |
|
NOT APPLICABLE
|
|
PROPOSED FACADE SSP FILING (AS ALT3) IN CONJUNCTION WITH DOB JOB #: 140806
|
|
Work on Floor(s): FAC,ROF 001 thru 015
|
| 11/05/2018 |
123504467 |
01 |
A2 |
X SIGNED OFF |
07/13/2020 |
0009270 RA |
MORPURGO |
|
NOT APPLICABLE
|
|
REMOVE 25' OF EXTERIOR WALL. MADE UP OF PAIR OF FRENCH DOOS AND 13 FEET O
|
|
Work on Floor(s): PH
|
| 11/05/2018 |
123504467 |
02 |
A2 |
X SIGNED OFF |
07/13/2020 |
0061356 PE |
MOORE |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK FOR OPENING IN THE WALL. NO CHANGE IN USE OCCUPANCY OR
|
|
Work on Floor(s): PH
|
| 10/16/2018 |
140806518 |
01 |
A2 |
X SIGNED OFF |
04/16/2019 |
0081742 PE |
BENABDEL |
|
NOT APPLICABLE
|
|
CUT OUT AND RE-POINT DEFECTIVE MORTAR JOINTS AND REPAIR CRACKS AT DECORATI
|
|
Work on Floor(s): OSP
|
| 12/20/2017 |
122962482 |
03 |
A2 |
P APPROVED |
01/08/2018 |
|
STANDING |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 014
|
| 12/18/2017 |
123032208 |
03 |
A2 |
P APPROVED |
12/21/2017 |
|
AGELOFF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 10/18/2017 |
123169114 |
02 |
A2 |
X SIGNED OFF |
02/22/2019 |
0088010 PE |
DIVILIO |
|
NOT APPLICABLE
|
|
MECHANICAL AND PLUMBING WORK AS SHOWN ON PLANS
|
|
Work on Floor(s): 011
|
| 10/18/2017 |
123169114 |
01 |
A2 |
X SIGNED OFF |
02/22/2019 |
0019236 RA |
JOSEPH |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION TO INCLUDE DEMO OF EXISTING AND CONSTRUCTION OF NEW
|
|
Work on Floor(s): 011
|
| 09/21/2017 |
123181895 |
01 |
A2 |
P APPROVED |
10/10/2017 |
0089199 PE |
PATEL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/26/2019 7TH CYCLE FISP REPAIR INCLUDING REPAIRS TO DEFECT
|
|
Work on Floor(s): 001 thru 015
|
| 06/09/2017 |
123101437 |
01 |
A2 |
X SIGNED OFF |
01/31/2020 |
0029399 RA |
FITZGERA |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APT.6-1 AT 6TH FLOOR. PLUMBING WORK AS PER PLANS FI
|
|
Work on Floor(s): 006
|
| 04/24/2017 |
123032208 |
02 |
A2 |
X SIGNED OFF |
08/16/2019 |
0091112 PE |
SCHWARTZ |
|
NOT APPLICABLE
|
|
HEREWITH FILE MECHANICAL PLANS FOR THE INSTALLATION OF SPLIT SYSTEM A/C UN
|
|
Work on Floor(s): 002
|
| 04/24/2017 |
123032208 |
01 |
A2 |
X SIGNED OFF |
08/16/2019 |
0016826 RA |
AGELOFF |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO RENOVATE APT. #23 ON 2 FL. GENERAL CONSTRUCTION TO
|
|
Work on Floor(s): 002
|
| 12/05/2016 |
122962482 |
02 |
A2 |
X SIGNED OFF |
02/06/2018 |
0059908 PE |
MAASARAN |
|
NOT APPLICABLE
|
|
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF APT- 14-3 ON THE 1
|
|
Work on Floor(s): 014
|
| 12/05/2016 |
122962482 |
01 |
A2 |
X SIGNED OFF |
02/06/2018 |
0021752 RA |
STANDING |
|
NOT APPLICABLE
|
|
RENOVATION OF APARTMENT 14-3 ON THE 14TH FLOOR. ARCHITECTURAL, PLUMBING &
|
|
Work on Floor(s): 014
|
| 08/04/2016 |
122814320 |
01 |
A2 |
X SIGNED OFF |
11/25/2016 |
0065403 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
REPLACEMENT (1) NEW CHIMNEY OFFSET/EXTENSION IN SAME LOCATION AS PREVIOUSL
|
|
Work on Floor(s): ROF
|
| 07/28/2016 |
140528221 |
01 |
A3 |
X SIGNED OFF |
02/21/2017 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. WORK SHALL COMPLY WIT
|
|
Work on Floor(s): OSP
|
| 07/07/2016 |
122611548 |
05 |
A2 |
P APPROVED |
07/08/2016 |
|
LEONG-AK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 009
|
| 06/29/2016 |
122611548 |
04 |
A2 |
P APPROVED |
07/01/2016 |
|
LEONG-AK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 009
|
| 06/13/2016 |
122611548 |
03 |
A2 |
P APPROVED |
06/16/2016 |
|
LEONG-AK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 009
|
| 05/21/2016 |
122611548 |
02 |
A2 |
P APPROVED |
06/06/2016 |
|
LEONG-AK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 009
|
| 04/25/2016 |
122772491 |
01 |
A2 |
X SIGNED OFF |
05/24/2017 |
0032365 RA |
KIM |
|
NOT APPLICABLE
|
|
FILING TO DEMOLISH INTERIOR PARTITIONS AND REMOVAL AND CAPPING OF PLUMBING
|
|
Work on Floor(s): 001
|
| 04/21/2016 |
122700684 |
02 |
A2 |
X SIGNED OFF |
05/22/2017 |
0059908 PE |
MAASARAN |
|
NOT APPLICABLE
|
|
INSTALLING NEW HVAC EQUIPMENT AND RELATED DUCT WORK AS SHOWN ON PLANS. NO
|
|
Work on Floor(s): 001
|
| 04/21/2016 |
122700684 |
01 |
A2 |
X SIGNED OFF |
05/22/2017 |
0032365 RA |
KIM |
|
NOT APPLICABLE
|
|
DEMOLITION AND INSTALLATION OF INTERIOR PARTITIONS,REPLACING PLUMBING FIXT
|
|
Work on Floor(s): 001
|
| 03/14/2016 |
122640348 |
03 |
A2 |
P APPROVED |
04/07/2016 |
|
POTTERS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 009
|
| 12/23/2015 |
122640348 |
02 |
A2 |
X SIGNED OFF |
11/02/2017 |
0075441 PE |
CHIU |
|
NOT APPLICABLE
|
|
INSTALL NEW CENTRAL AC SYSTEM. REPLACE EXISTING PTAC UNITS AND INSTALL NE
|
|
Work on Floor(s): 009
|
| 12/17/2015 |
122640348 |
01 |
A2 |
X SIGNED OFF |
11/02/2017 |
0011524 RA |
POTTERS |
|
NOT APPLICABLE
|
|
RENOVATION OF APT 92. RELOCATE NONBEARING PARTITIONS. REPLACE PLUMBING FIX
|
|
Work on Floor(s): 009
|
| 12/15/2015 |
122611548 |
01 |
A2 |
X SIGNED OFF |
01/18/2017 |
0016682 RA |
LEONG-AK |
|
NOT APPLICABLE
|
|
RENOVATION OF APARTMENT 9-1. ARCHITECTURAL, PLUMBING AND MECHANICAL WORK
|
|
Work on Floor(s): 009
|
| 12/19/2014 |
140291949 |
01 |
A2 |
X SIGNED OFF |
10/04/2016 |
0016966 PE |
GALLO |
|
NOT APPLICABLE
|
|
FILING TO SHOW MECHANICAL AND PLUMBING WORK IN APT 8-2 ON THE 8TH FLOOR.
|
|
Work on Floor(s): 008
|
| 12/19/2014 |
140291930 |
01 |
A2 |
X SIGNED OFF |
10/05/2016 |
0018324 RA |
MCELHINE |
|
NOT APPLICABLE
|
|
FILING TO SHOW RENOVATION OF APT 8-2 ON THE 8TH FLOOR. WORK INCLUDES REMOV
|
|
Work on Floor(s): 008
|
| 12/02/2014 |
140287357 |
01 |
A2 |
D A/P ENTIRE |
12/02/2014 |
0016966 PE |
GALLO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/14/2014 FILING TO SHOW MECHANICAL AND PLUMBING WORK IN AP
|
|
Work on Floor(s): 008
|
| 12/02/2014 |
140287231 |
01 |
A2 |
D A/P ENTIRE |
12/02/2014 |
0018324 RA |
MCELHINE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/14/2014 FILING TO SHOW RENOVATION OF APT 8-2 ON THE 8TH F
|
|
Work on Floor(s): 008
|